Loading...
HomeMy WebLinkAboutP_Design_Residence_Inn_by_Marriott_2_105080173_V1_1709293PH FUT. XFMR 120/208v EHC640-A EHC641-B EHC642-C 0/5 X1040 F:100T 318668-166268 EHI103-A EHI104-B EHI105-C EHI100-A EHI101-B EHI102-C 10' CLEARANCE EX. 60' 1-4" NEW 25' 1-4"8' SIDEWALK⅊⅊ ⅊ NEW CABLE TAG EX. CABLE TAG EX. CABLE TAG 4' X 4' PIT 11' X 11' PIT ⅊ "1100" RESIDENCE INN BY MARRIOTT "1300" HAMPTON INN 105080173THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) OVERHEAD CIRCUIT MAP N.T.S. ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP Vic Ibarra 425-429-574 Vic Ibarra 425-429-574 N/A N/A N/A Boris Sidorov 425-417-4984 REQUIRED N/A - In Private Property RESIDENCE INN BY MARRIOTT INSTALL PRI L/E w/ 3Ø PM TRF 1100 Lake Washington Blvd N, Renton, WA 98056 PSE N/A N/A N/A 105080173 AS SHOWN 2 / 2 KING N/A N/A CSPSKEPM SW 1/4 SEC5 T23 R5E N/A N/A 2305E019 2305E040 2305E019 HIG-17 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A CUSTOMER-SUPPLIED TRENCH FOR PRIMARY CABLE SCALE: NONE Excavated Dirt Pile Final Grade 24" Min Backfill for Schedule 40 Conduit (NO Rocks over 10" Diameter or foreign objects)Separation 4" Min 18" Min 48" Max 36" Min Cover Phone & TV Primary Power Cable in Customer Provided Schedule 40 Conduit ROADSIDE To Excavated Dirt Pile SCALE:1"=30' 2" Excavation - 19-1/2 cubic yards SIDE VIEW 5'-4"Crushed 6" Rock TOP VIEW 9' 11' 7'-0" 4'-0" 1' 4'-8" SCALE: NONE EXISTING VAULT & EXCAVATION DETAIL AT J01 CONDUIT LOCATION Size Qty Design BENDS PULL PULL Cable Design Cable Numbers from to (in) Length (ft)90°45°22°11°(lbs) Rev (lbs)Size Length (ft)A B C Manufacturer Year PRIMARY CABLE Please Record INSTALL PRIMARY CABLE & CONDUIT TABLE VAULT & EQUIPMENT TABLE Site Grid Number Vault Size & Cover Type & Size Equipment In Vault Primary Bushings Transformer ID Numbers (Company ID) ASBUILT INFORMATION Foreman-Complete LB DC J01 318670 166265 * Matid: *3 V01 318670 166269 750KVA 120/208V Matid: 6258300 3 7' x 7' x 4' w/60" x 24" ACCESS W/8' SQ COVER Matid: 7917901 ASBUILT INFORMATION Additional Information * V01 4 1 1/0 AL JKT *J01 *1 - 3-Ø JBOX w3-4Pos J-buses EHC640 EHC641 EHC642 in Trench. 11' 11'TOP VIEWCustomer's service wire conduits may enter at any corner other than the corner where the primary cable enters the vault. PSE Primary Conduit Excavation - 20 cubic yards SIDE VIEW6" Crush Rock 3-6"4' - 8" THE LID 2" ABOVE GROUND 4'-2" VAULT DETAIL AT V01 NOT TO SCALE Company ID#: Primary phase connected to: Tested Secondary Voltage Transformer Install SCHEDULE 80 GRAY PVC CONDUIT ONLY BEFORE & AFTER UG MAP 80 FLOW DIRECTION LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS (MID 9995692). 6' 3' 8" TECHNIQUES FOR EROSION AND SEDIMENT CONTROL FILTER FENCE DETAIL Not to Scale 0150.3200 6"6" MIN GUARD POST INSTALLATION MIN CONCRETE GUARD POST LOCATIONS XFMR FRONT GUARD POSTS 3' MIN MIN 5' MAX 5' MAX TYPICAL 3' MIN 2'-6" 5' MAX 5' MAX 5' MAX 18" MIN 5' MAX 5' MAX PAINTED YELLOW 3'-6" 6'-0" The following styles of guard posts are approved for Puget Sound Energy transformers: - 6 ft x 4 in. diameter Schedule 40 or better galvanized steel pipe filled with concrete. The concrete shall have a minimum compressive strength of 3000 psi after 28 days. The exposed portion of the post shall be painted traffic yellow. - 6 ft x 9 in. diameter precast steel-reinforced concrete post. Available from Utility Vault Company, Auburn, WA; or Hanson Inc., Tacoma, WA. The exposed portion of the post shall be painted traffic yellow. LENGTH V01 - GUARD POST INSTALLATION Not to scale 0700.1600-03 18" PAD & 5' MAX 5' MAX 5' MAX COOLING 5' MIN 5' MIN 10' MIN 5' MIN FINS ACCESS CONCRETE PAD MINIMUM CLEARANCES FOR PSE EQUIPMENT CURB OR EDGE OF PAVEMENT CURB OR EDGE OF PAVEMENT 5' MIN ROAD OR PARKING AREA TYP. PAD & TRANS- FORMER 3' MIN 18" MIN 18" MIN DOOR ACCESS DOOR REQUIRED WORK SPACE AREA 6775.0035 Not to scale