Loading...
HomeMy WebLinkAboutP_Design_105086326_V1_1710051002 319230-166126 37.5 KVA 120/240V 319230-166141 JOB SITE JOB SITE 4' X 4' WORK PIT 4' X 4' WORK PIT 4' X 5' WORK PIT CUT CROSSING -CUSTOMER TO INSTALL 1-3" SCH'L 80 CONDUIT, ±115' -PSE TO INSTALL 1-350KCMIL UG TPLX, ±125' -CUSTOMER TO INSTALL 1-3" SCH'L 80 CONDUIT, ±70' -PSE TO INSTALL 1-350KCMIL UG TPLX, ±70' 3/4 YARD OF SAND EXISTING 3Ø-750 UG FEEDER SIDEWALK NO BACKHOE DIGGER, VAC TRUCK ONLY SITE PLAN POWER GENERAL NOTES - RESIDENTIAL PROJECT N Vicinity Map N/A Owner / Developer Contact Info officeATTN: KENDALL HOMES 612 S. LUCILE ST. SEATTLE, WA 98108 MIKE MAY 360-531-2646 OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILECUSTOMER-SUPPLIED SERVICE TRENCH ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE HIG-15 2017 201 261 240 -1.61 - 201 262.61 240 Perm. Service Superior ORDER#NOTIF# PWR PROJECT PHASE 104295669504934383 CABLE TV PHONE GAS FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. 10. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Inclement weather conditions may cause delays in construction times and dates. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 8. 9. E-Mail: Cell Phone: Project Manager Contact Information: Manager:RUSSELL PAGE 253-245-0192 RUSSELL.PAGE@PSE.COM PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" SCALE: 1" = 50'105086326THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) 105086326 UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP RUSSELL PAGE 253-245-0192 9/25/17 RUSSELL PAGE 253-245-0192 9/25/17 N/A N/A N/A TIN NGUYEN 253-244-4303 9/25/17 EASEMENT RENTON BREWIS JOB INSTALL UG HH & PERM SERVICE 1002 N. 30TH ST., RENTON WA 98056 N/A N/A N/A 105086326 N/A 1/1 KING N/A N/A CSPSKEIN SW-32-24N-05E N/A N/A 2405E127 2405E136 2405E127 HIG-15 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 504858506 SIDE VIEW 15" 23-1/4"32-3/4" 2" Captive L-Bolt Lock Cover, 10 lbs 17" Approx Approx 12" Customer's service conductors Conductors enter from beneath and shall be folded back with handhole TOP VIEW 5'-0" 4'-0" SINGLE PHASE SECONDARY HANDHOLE AT HH1 SCALE: NONE 6050.2000 TV & TEL Electric Service Cable in Conduit 3" Schedule 40 Grey PVC Excavated Dirt Pile Final Grade 24" Min 24" Min to 36" Max Cover Separation 12" Min 20" Min JOINT TRENCH DETAIL Electric Service Cable in Conduit (NTS) To Excavated Dirt Pile 36" MINIMUM COVER IN RIGHT OF WAY Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter. Backfill for Conduit Free of rocks larger than 8" in diameter) SITE SPECIFIC NOTES P01 GRID# 319230-166126: -EXISTING POLE TO REMAIN -EXISTING 37.5kVA 120/240v OH TRANSFORMER TO REMAIN -INSTALL 1-3" CONDUIT RISER ON EXISTING S/O BRACKET X01: -CUT CROSSING HH1: -INSTALL ONE 12" X 17" 4-POS SINGLE-PHASE SECONDARY HH -INSTALL STUB OUT TO PROPERTY LINE OF "1006" M01: -INSTALL 1-200AMP PERMANENT METER SPAN SPECIFIC NOTES P01-HH1: -CUSTOMER TO PROVIDE 1-3" SCH'L 80 CONDUIT, ±105' -PSE TO INSTALL 1 RUN OF 350KCMIL UG TPLX, ±125' HH1-M01: -CUSTOMER TO PROVIDE 1-3" SCH'L 80 CONDUIT, ±70' -PSE TO INSTALL 1 RUN OF 350KCMIL UG TPLX W/ 4/0 TAIL, ±70' CUSTOMER DEVELOPMENT NOTES CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS. #6750.6500 **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** -CUSTOMER IS REQUIRED TO PROVIDE A 4' X 4' WORK PIT AT P01. -CUSTOMER IS REQUIRED TO PROVIDE A 4' X 5' WORK PIT AT HH1. -CUSTOMER IS REQUIRED TO PROVIDE A 4' X 4' WORK PIT & 3/4 YARD OF SAND AT M01. -CUSTOMER TO EXCAVATE & INSTALL “ OF 1-3" DISCONTINUOUS SCH'L 80 GRAY PVC CONDUIT FROM P01-HH1. -CUSTOMER TO EXCAVATE & INSTALL “ OF 1-3" DISCONTINUOUS SCH'L 80 GRAY PVC CONDUIT FROM HH1-M01. -CUSTOMER IS REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN CONDUIT. -CUSTOMER MUST HAVE A COPY OF PSE PROVIDED PERMIT ON SITE DURING ANY DIGGING IN RIGHT OF WAY. -CUSTOMER IS REQUIRED TO INSTALL METER BASE ON FRONT 1/3 OF BUILDING. ALL TRENCHING WILL REQUIRE AN INSPECTION BY PSE BEFORE FINAL BACKFILL ALL TRENCH AND L&I INSPECTION MUST BE COMPLETED 72HRS BEFORE CONSTRUCTION SCALE: NONE CIRCUIT ONE-LINE DIAGRAM mikem@kendallhomesnw.com Standoff Bracket 15" Min Length Conduit Clamp Conduit Field Face Quadrant Climbing Space Road Face Quadrant Climbing Space 5" Min CL LCDirection of Vehicular Traffic CONDUIT RISER PLACEMENT DETAIL TOP VIEW Not to Scale LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 3601 SQ. 200 AMPS GAS 11 KW 140 A 1.5% 3.6% CIRCUIT FEET ADDED: 0' OUTAGE LIST: 1003 N. 30TH ST., RENTON WA 98056 1007 N. 30TH ST, RENTON WA 98056 1006 N. 30TH ST, RENTON WA 98056 FLOW DIRECTION LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS (MID 9995692). 6' 3' 8" TECHNIQUES FOR EROSION AND SEDIMENT CONTROL FILTER FENCE DETAIL Not to Scale 0150.3200