HomeMy WebLinkAboutP_Design_105086326_V1_1710051002
319230-166126
37.5 KVA 120/240V 319230-166141
JOB SITE
JOB SITE
4' X 4'
WORK PIT
4' X 4'
WORK PIT
4' X 5'
WORK PIT
CUT
CROSSING
-CUSTOMER TO INSTALL 1-3"
SCH'L 80 CONDUIT, ±115'
-PSE TO INSTALL 1-350KCMIL
UG TPLX, ±125'
-CUSTOMER TO INSTALL 1-3"
SCH'L 80 CONDUIT, ±70'
-PSE TO INSTALL 1-350KCMIL
UG TPLX, ±70'
3/4 YARD
OF SAND
EXISTING 3Ø-750
UG FEEDER
SIDEWALK
NO BACKHOE
DIGGER, VAC
TRUCK ONLY
SITE PLAN
POWER GENERAL NOTES - RESIDENTIAL PROJECT
N
Vicinity Map
N/A
Owner / Developer Contact Info
officeATTN:
KENDALL HOMES
612 S. LUCILE ST.
SEATTLE, WA 98108
MIKE MAY 360-531-2646
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILECUSTOMER-SUPPLIED SERVICE TRENCH
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
HIG-15
2017
201 261 240
-1.61 -
201 262.61 240
Perm. Service
Superior
ORDER#NOTIF#
PWR
PROJECT PHASE
104295669504934383
CABLE TV
PHONE
GAS
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
10.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Inclement weather conditions may cause delays in construction times and dates.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
8.
9.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:RUSSELL PAGE
253-245-0192
RUSSELL.PAGE@PSE.COM
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
SCALE: 1" = 50'105086326THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
105086326
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
RUSSELL PAGE 253-245-0192 9/25/17
RUSSELL PAGE 253-245-0192 9/25/17
N/A N/A N/A
TIN NGUYEN 253-244-4303 9/25/17
EASEMENT RENTON
BREWIS JOB
INSTALL UG HH & PERM SERVICE
1002 N. 30TH ST., RENTON WA 98056
N/A N/A
N/A 105086326
N/A 1/1
KING N/A N/A CSPSKEIN
SW-32-24N-05E N/A N/A
2405E127 2405E136 2405E127 HIG-15
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
504858506
SIDE VIEW
15"
23-1/4"32-3/4"
2"
Captive L-Bolt
Lock Cover, 10 lbs
17"
Approx
Approx
12"
Customer's
service
conductors
Conductors enter from
beneath and shall be
folded back with handhole
TOP VIEW
5'-0"
4'-0"
SINGLE PHASE SECONDARY HANDHOLE AT HH1
SCALE: NONE 6050.2000
TV & TEL Electric Service Cable in Conduit
3" Schedule 40 Grey PVC
Excavated Dirt Pile
Final Grade
24" Min
24" Min
to
36" Max
Cover Separation
12" Min
20" Min
JOINT TRENCH DETAIL
Electric Service Cable in Conduit (NTS)
To Excavated Dirt Pile
36" MINIMUM COVER
IN RIGHT OF WAY
Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris,
glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.
Backfill for Conduit
Free of rocks
larger than 8"
in diameter)
SITE SPECIFIC NOTES
P01 GRID# 319230-166126:
-EXISTING POLE TO REMAIN
-EXISTING 37.5kVA 120/240v OH TRANSFORMER TO REMAIN
-INSTALL 1-3" CONDUIT RISER ON EXISTING S/O BRACKET
X01:
-CUT CROSSING
HH1:
-INSTALL ONE 12" X 17" 4-POS SINGLE-PHASE SECONDARY HH
-INSTALL STUB OUT TO PROPERTY LINE OF "1006"
M01:
-INSTALL 1-200AMP PERMANENT METER
SPAN SPECIFIC NOTES
P01-HH1:
-CUSTOMER TO PROVIDE 1-3" SCH'L 80 CONDUIT, ±105'
-PSE TO INSTALL 1 RUN OF 350KCMIL UG TPLX, ±125'
HH1-M01:
-CUSTOMER TO PROVIDE 1-3" SCH'L 80 CONDUIT, ±70'
-PSE TO INSTALL 1 RUN OF 350KCMIL UG TPLX W/ 4/0 TAIL, ±70'
CUSTOMER DEVELOPMENT NOTES
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL,
COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS.
#6750.6500
**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT
BACKFILL**
-CUSTOMER IS REQUIRED TO PROVIDE A 4' X 4' WORK PIT AT P01.
-CUSTOMER IS REQUIRED TO PROVIDE A 4' X 5' WORK PIT AT HH1.
-CUSTOMER IS REQUIRED TO PROVIDE A 4' X 4' WORK PIT & 3/4 YARD OF
SAND AT M01.
-CUSTOMER TO EXCAVATE & INSTALL
OF 1-3" DISCONTINUOUS SCH'L
80 GRAY PVC CONDUIT FROM P01-HH1.
-CUSTOMER TO EXCAVATE & INSTALL
OF 1-3" DISCONTINUOUS SCH'L
80 GRAY PVC CONDUIT FROM HH1-M01.
-CUSTOMER IS REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL
ROPE IN CONDUIT.
-CUSTOMER MUST HAVE A COPY OF PSE PROVIDED PERMIT ON SITE
DURING ANY DIGGING IN RIGHT OF WAY.
-CUSTOMER IS REQUIRED TO INSTALL METER BASE ON FRONT 1/3 OF
BUILDING.
ALL TRENCHING WILL REQUIRE AN INSPECTION BY PSE BEFORE FINAL
BACKFILL
ALL TRENCH AND L&I INSPECTION MUST BE COMPLETED 72HRS BEFORE
CONSTRUCTION
SCALE: NONE
CIRCUIT ONE-LINE DIAGRAM
mikem@kendallhomesnw.com
Standoff Bracket
15" Min Length
Conduit Clamp
Conduit
Field Face
Quadrant
Climbing
Space
Road Face
Quadrant
Climbing
Space
5" Min
CL LCDirection of Vehicular Traffic
CONDUIT RISER PLACEMENT DETAIL
TOP VIEW
Not to Scale
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
3601 SQ.
200 AMPS
GAS
11 KW
140 A
1.5%
3.6%
CIRCUIT FEET ADDED: 0'
OUTAGE LIST:
1003 N. 30TH ST., RENTON WA 98056
1007 N. 30TH ST, RENTON WA 98056
1006 N. 30TH ST, RENTON WA 98056
FLOW DIRECTION
LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL,
SECURE WITH PEA GRAVEL BAGS (MID 9995692).
6'
3'
8"
TECHNIQUES FOR EROSION AND SEDIMENT CONTROL
FILTER FENCE DETAIL
Not to Scale 0150.3200