HomeMy WebLinkAboutMFP17004813DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP17004813
IVR Number: 17004813
Permit Informa!on
Permit Name:Puget Sound Energy - Electric
Address/Loca!on:10/05/2017Applica!on Date:7564600055Parcel Number:1144 HARRINGTON AVE NE
Permit Type :10/19/2017Issue Date:Franchise
Permit Work Class:10/19/2018Expira!on Date :Minor U,lity
Job Number:105084051Franchise Type :Electric
Descrip!on:Extend underground primary from PO 1 to new padmount transformer at VO 1 on private property . Restora,on Per
City of Renton Standards .
Contacts
Name Address PhoneTypeBilling
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC - BILLING
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Applicant
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: BL.005109Electrical Contractor : POTELI*344O4
Construc!on Contractor : POTELI*227PL
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC - BILLING
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Specialized
Billing
X
General Condi!ons & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
MFP17004813
Scott Warlick 10/12/2017
Justin Johnson 10-18-2017
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
Reset FormPrint Form
MFP17004813
monday through friday
8:00 am to 3:00 pm Justin Johnson
10-18-2017
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
HARRINGTON AVE NE1111
1616
P01
STOP
FLAGGERONE LANEROADAHEADW20-4100'100'100'ROADWORKAHEADW20-1W20-7ABEPREPAREDTOSTOPW3-4
100'100'100'ROADWORKAHEADW20-1 W20-7A BEPREPAREDTOSTOPW3-4X'X'X'ROADWORKAHEADW20-1W20-7AONE LANE
ROAD
AHEAD W20-4100'100'100'ROAD
WORK
AHEAD W20-1W20-7APRIVATE DR
GLENNWOOD AVE NE
STOP
FLAGGERDETOURM4-9bR9-9SIDEWALKCLOSEDR9-9SIDEWALK
CLOSED
FLAGGERS WILL ASSIST
PEDESTRIANS WITH
SIDEWALK CLOSURE
FROM TO
TOW AWAY AREA
PHONE 888-9999
INFRASOURCE LLC 000 0000000
NO PARKING
NO-PARK
NO PARK SIGNAGE WILL BE
PLACED ON ALL STREETS TO
SURROUND WORK ZONE
#1124
Job#105084051
1124 Harrington Ave NE, Renton WA
September 29, 2017
Sheet 1 of 2 ryan.honeysett@pse.com
(425)457-5381
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
N
PSE PUGET
SOUND
ENERGY
Notes:
1. All signs and spacing to conform to the MUTCD
and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
4. Sign size can be a minimum of 48" x 48" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m.
BORE PIT
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
WORK VEHICLE
SIGN LOCATION
WARNING FLAG
FLAGGER
STOP
Puget Sound Energy
Traffic Control Supervisor:
Ryan Honeysett
Card No. 010760
Card Exp. 06/30/2021
ryan.honeysett@pse.com
(425)457-5381
MFP17004813
HARRINGTON AVE NE1111
1616
P01ONE LANEROADAHEADW20-4100'100'100'ROADWORKAHEADW20-1W20-7ABEPREPAREDTOSTOPW3-4
100'100'100'ROADWORKAHEADW20-1 W20-7A BEPREPAREDTOSTOPW3-4X'X'X'ROADWORKAHEADW20-1W20-7AONE LANE
ROAD
AHEAD W20-4100'100'100'ROAD
WORK
AHEAD W20-1W20-7APRIVATE DR
GLENNWOOD AVE NE
STOP
FLAGGER R9-9SIDEWALK
CLOSED
FLAGGERS WILL ASSIST
PEDESTRIANS WITH
SIDEWALK CLOSURE
FROM TO
TOW AWAY AREA
PHONE 888-9999
INFRASOURCE LLC 000 0000000
NO PARKING
NO-PARK
NO PARK SIGNAGE WILL BE
PLACED ON ALL STREETS TO
SURROUND WORK ZONE
#1124
V01 R9-9SIDEWALKCLOSEDDETOURM4-9bSTOP
FLAGGER
Job#105084051
1124 Harrington Ave NE, Renton WA
September 29, 2017
Sheet 2 of 2 ryan.honeysett@pse.com
(425)457-5381
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
N
PSE PUGET
SOUND
ENERGY
Notes:
1. All signs and spacing to conform to the MUTCD
and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
4. Sign size can be a minimum of 48" x 48" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m.
BORE PIT
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
WORK VEHICLE
SIGN LOCATION
WARNING FLAG
FLAGGER
STOP
Puget Sound Energy
Traffic Control Supervisor:
Ryan Honeysett
Card No. 010760
Card Exp. 06/30/2021
ryan.honeysett@pse.com
(425)457-5381
MFP17004813
318611-166710
75kVA 120/240v
318602-166683
100kVA 120/240v
CUSTOMER OWNED, MAINTAINED
AND INSTALLED SECONDARY
CUSTOMER OWNED, MAINTAINED
AND INSTALLED SECONDARY
318620-166726
X787 F: Unk
N.O.
318622-166725
35'85'50
'
318619-166715
100kVA 120/240v
70'25'318600-166677
SW # T78962
F: 40T HARRINGTON AVE NEHARRINGTON PL NE (PVT)DRIVEWAY (PVT)
60' ROW HARRINGTON PL NE (PVT)318622-166681
40T
X5116 318622-166681
100kVA 120/240V
318596-166715
3X25kVA 120/208V ABCNABC#
2
A
C
S
R
#2 AC
S
R
318608-166723
3X37.5kVA 120/208V
#2 ACSR
CBAN"1159"
"1143"
"1135"
"1177"CBAN#4 CUBGLENWOOD AVE NE
SITE PLAN
SCALE: 1" = 40'
CIRCUIT FEET ADDED: 270'POWER GENERAL NOTES - COMMERCIAL PROJECT
8.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits
and crossings from the individual unit's meter base to the designated connection point.
Inclement weather conditions may cause delays in construction times and dates.
1.
2.
3.
4.
5.
6.
7.
9.
11.
10.
SITE SPECIFIC NOTES
P01 (318600-166677)
-INST. 1 - 12KV 200A FG OH/UG TERMINATION PSE STD 6043.1000 (TSU1C1)
-INST. 1 - #4CU - 2/0CU STRAIGHT LINE CLAMP (MID: 9240000)
-1 - L/B C/O FUSE ON FG ARM @ 40T
- INST. 1 - SWITCH # T78962
-INST. 1 - 2" RISER ON EXISTING STANDOFF BRACKETS PER STD 6042.1000 (RIS2CSS)
V01 (318602-166683)
-INST. 48" X 48" X 38" UNISTRUT MINIPAD VAULT W/ GNDS PER STD 6045.1010 (MINU1LR)
-INST. 100KVA 120/240V PADMOUNT TRANSFORMER PER STD 6045.1010 (MID: 6247200)
-INST. 1 - 12KV ELBOW KIT PER STD 6041.1000 (ELB10J)
- INST. 1 - 12KV DUST CAP
- CONNECT AND TAG 4 RUNS OF CUSTOMER INSTALLED, OWNED, AND MAINTAINED 500 KCMIL UG TRIPLEX- INST.
GRID # 318602-166683
J01 (318622-166725)
- REPLACE EXISTING B/O 4'8" X 4'8" LID W/ 1 - 3' SQUARE DIAMOND PLATE DOOR WITH LIKE KIND LID (MID: 7656400)
-INST. 1 - 12KV ELBOW KIT PER STD 6041.1000 (ELB10J)
V02 (318619-166715)
-INST. 48" X 48" X 38" UNISTRUT MINIPAD VAULT W/ GNDS PER STD 6045.1010 (MINU1LR)
- INST. 100KVA 120/240V PADMOUNT TRANSFORMER PER STD 6045.1010 (MID: 6247200)
-INST. 2 - 12KV ELBOW KITS PER STD 6041.1000 (ELB10J)
- CONNECT AND TAG 6 RUNS OF CUSTOMER INSTALLED, OWNED, AND MAINTAINED 400 KCMIL UG TRIPLEX
- INST. GRID # 318619-166715
V03 (318611-166710)
- INST. 48" X 48" X 38" UNISTRUT MINIPAD VAULT W/ GNDS PER STD 6045.1010 (MINU1LR)
-INST. 1 - 75KVA 120/240V PADMOUNT TRANSFORMER PER STD 6045.1010 (MID:6247150)
- INST. 1 - 12KV ELBOW KIT 6041.1000 (ELB10J)
-INST. 1 - 12KV DUST CAP
- CONNECT AND TAG 3 RUNS OF CUSTOMER INSTALLED, OWNED, AND MAINTAINED 500 KCMIL UG TRIPLEX
- INST. GRID # 318611-166710
SPAN NOTES
** SEE TABLES AND ONE-LINE DIAGRAMS, PG2 **
DEVELOPER CIVIL CONTRACTOR NOTES:
·REQUIRED TO PROVIDE A 7' X 7' PIT AT V01, V02 AND V03.
·REQUIRED TO PROVIDE A 4' X 4' PIT AT EXISTING PSE FACILITIES.
·REQUIRED TO PROVIDE 6” CRUSHED ROCK AT V01, V02 AND V03.
·REQUIRED TO PROVIDE AND HAVE EQUIPMENT TO PUMP OUT WATER FOR METER BASE PITS & TRENCH AT ALL
TIMES.
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET
SOUND ENERGY STANDARDS# 6750.6500.
**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL **
DEVELOPER EXCAVATION NOTES:
·REQUIRED TO EXCAVATE & EXPOSED EXISTING PSE UG FACILITIES 48 HOURS BEFORE CONSTRUCTION
·ALL EQUIPMENT MUST BE PROTECTED FROM VANDALS WITH STEEL PLATE 48 HOURS BEFORE CONSTRUCTION.
·EXCAVATION MUST BE COMPLETED 48 HOURS PRIOR TO CONSTRUCTION.
·REQUIRED TO HAVE EXCAVATION EQUIPMENT ON SITE THE DAY OF CONSTRUCTION TO COMPLETE
BACKFILLING FOR THE UG PRIMARY & INSTALLATION OF THE 1PH OR 3PH VAULT.
·BACKFILL / COVER REQUIRED ON PRIMARY.
CONTRACTOR TRENCHING IN CITY OR COUNTY OR W.S. DOT RIGHT OF WAY NOTES:
PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT.
IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND
SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS
ALL INSPECTIONS ARE REQUIRED BY POTELCO INC
·IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEES WILL BE APPLIED.
6"6"
MIN
GUARD POST INSTALLATION
MIN
CONCRETE 2'-6"
PAINTED
YELLOW
3'-6"
6'-0"
The following styles of guard posts are approved for Puget Sound Energy transformers:
- 6 ft x 4 in. diameter Schedule 40 or better galvanized steel pipe filled with concrete.
The concrete shall have a minimum compressive strength of 3000 psi after 28 days.
The exposed portion of the post shall be painted traffic yellow.
- 6 ft x 9 in. diameter precast steel-reinforced concrete post.
Available from Utility Vault Company, Auburn, WA; or Hanson Inc., Tacoma, WA.
The exposed portion of the post shall be painted traffic yellow.
LENGTH
GUARD POST INSTALLATION
Not to scale 0700.1600-03
18"
PAD &
GUARD POST LOCATIONS
XFMR
FRONT
GUARD
POSTS
3'
MIN
MIN
5'
MAX
5'
MAX
TYPICAL
3' MIN 5'
MAX
5'
MAX
5'
MAX
18"
MIN
5'
MAX
5'
MAX
5'
MAX
5'
MAX
5'
MAX
COOLING
5' MIN
5' MIN
10' MIN
5'
MIN
FINS
ACCESS
CONCRETE PAD
MINIMUM CLEARANCES FOR PSE EQUIPMENT
CURB OR EDGE OF PAVEMENT
CURB OR EDGE OF PAVEMENT
5' MIN
ROAD OR
PARKING AREA
TYP. PAD
& TRANS-
FORMER
3'
MIN
18" MIN
18" MIN
DOOR
ACCESS
DOOR
REQUIRED
WORK SPACE
AREA
6775.0035 Not to scale
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
Owner / Developer Contact Info
officeATTN:
Sunset Court LLLP
2900 NE 10th Street
Renton WA 98056
Sean McCarty 206-423-0689 105084051THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
GAS
PHONE
CABLE TV
N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Misc UG
Perm Service
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
D. Goodale 425-495-7049 6/22/17
S. Reed 82-6425 6/22/17
Nate Linville 253-970-7284
Required Renton
RHA Sunset Court Apartments
(2) New 1Ø Primary Line Extensions and Perm Service
1124-1158 Harrington Ave NE, Renton, WA 98056
105084051
As Noted 1 of 2
King CSPSKEIN
23N 5E 9NW
2305E034 2305E040 2305E034 PRE-11 & HIG-13
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:David Goodale
425-495-7049
dave.goodale@pse.com
N
Vicinity Map
BUILDING 2BUILDING 1 BUILDING 3
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
BUILDING 4 (A & B)
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
105084051503739870
N/A
5,410 SQ FT
125A (x11)
ELEC
52.5KW RES.
65A
1.7% @ XFMR
0.3% @ XFMR
5,410 SQ FT
125A (x11)
ELEC
52.5KW RES.
65A
1.7% @ XFMR
0.3% @ XFMR
13,702 SQ FT
125A (x17)
ELEC
66KW RESIDENTIAL
65A
1.4%
0.5%
17,526 SQ FT
125A (x23)
ELEC
105KW RESIDENTIAL
65A
1.7%
0.3%
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
PRE-11
6/13/17
92 99 154
-15.35 -
92 114.35 154
Project
Location
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
HIG-13
6/13/17
88 136 113
25.29 --
113.29 136 113
AT V01, V02, & V03
REPLACE EXISTING 4'8"
SQUAIRE VAULT LID
V01, V02, & V03 TRANSFORMER CLEARANCES
Not to scale 0700.1500-01
MFP17004813
318602-166683
100kVA 120/240v
318600-166677
SWITCH # T78962
F: 40T
PSE: 1Ø - 1/0 AL JKT, L = 135'
BØ - EHI840
CUSTOMER PROVIDED, INSTALLED
AND MAINTAINED SECONDARY
(2) RUNS - 500kcmil UG TRIPLEX
CUSTOMER PROVIDED, INSTALLED
AND MAINTAINED SECONDARY
(2) RUNS - 500kcmil UG TRIPLEX
318611-166710
75kVA 120/240v
318622-166725
318619-166715
100kVA 120/240v
318618-166736
225kVA 120/208v
PSE: 1Ø - 1/0 AL JKT, L = 55'
AØ - EHI841
CUSTOMER PROVIDED, INSTALLED
AND MAINTAINED SECONDARY
(6) RUNS - 400kcmil UG TRIPLEX
PSE: 1Ø - 1/0 AL JKT, L = 155'
AØ - EHI842
318575-166698
300kVA 120/208v
CUSTOMER PROVIDED, INSTALLED
AND MAINTAINED SECONDARY
(3) RUNS - 500kcmil UG TRIPLEX
EXISTING 3Ø UG CABLE
AØ - 32410
BØ - 32411
CØ - 32412
EXISTING 3Ø UG CABLE
AØ - 30487
BØ - 30488
CØ - 30489
PSE PROVIDED:
(1) - 2" SCH-80 CONDUIT
IN CUSTOMER TRENCH
DEVELOPER:
(1) - 4" SCH-80 CONDUIT
EXISTING (1) - 4" SCH-80
CONDUIT CROSSINGDEVELOPER:
7' x 7' WORK PIT
DEVELOPER:
7' x 7' WORK PIT
PSE PROVIDED:
(1) - 2" SCH-80 CONDUIT
IN CUSTOMER TRENCH
DEVELOPER:
7' x 7' WORK PIT
HARRINGTON PL NE (PVT)DRIVEWAY (PVT)HARRINGTON PL NE (PVT)318608-166723
3X37.5kVA 120/208V
ONE-LINE DIAGRAM - P01 TO V01 (PRE-11)
NOT TO SCALE
CUSTOMER-SUPPLIED TRENCHES
Communications
Primary Power
Cables or Conduit
Excavated Dirt Pile
ROADSIDE
Final Grade
24" Min
12" Min
Separation
36"
Min
Cover
48"
Max
Backfill
(No rocks over 10" diameter)
Separation
12" Min
Gas
4" Sand Bedding
32" Typical
(Power, Gas, and
Communications)
JOINT TRENCH DETAIL
Primary-Mainline Gas & Communications (NTS)
Separation
12" Min
6" or 12" Min Sand Shading after Compaction
- A 6" layer of sand is allowed when excavated native material contains rocks no larger than 8" in diameter.
Trench and backfill requirements for primary electric line extension trenches (No PSE gas)
- A 12" layer of sand is required when excavated native material contains rocks up to 10" in diameter.
AT V01, V02, & V03 UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
D. Goodale 425-495-7049 6/22/17
S. Reed 82-6425 6/22/17
Nate Linville (253) 970-7284
Required Renton
RHA Sunset Court Apartments
(2) New 1Ø Primary Line Extensions and Perm Service
1124-1158 Harrington Ave NE, Renton, WA 98056
105084051
As Noted 2 of 2
King CSPSKEIN
23N 5E 9NW
2305E034 2305E040 2305E034 PRE-11 & HIG-13
Vault & Equipment Table
Site Grid
Number
Vault Size
& Cover
Type & Size
Equipment
In Vault
Primary Bushings Transformer
ID Numbers
(Company ID)
ASBUILT INFORMATION
Foreman-Complete
LB DC
V01 318602
166683
48"x48"x38"
Unistrut HH
Matid: 7663002
100kVA MP TRF
120/240
Matid: 6247200
1 1
V02 318619
166715
48"x48"x38"
Unistrut HH
Matid: 7663002
100kVA MP TRF
120/240
Matid: 6247200
2 0
V03 318611
166710
48"x48"x38"
Unistrut HH
Matid: 7663002
75kVA MP TRF
120/240
Matid: 6247150
1 1
EXCAVATION: 6 - 1/3 CUBIC YARDS
3'-6"
SIDE VIEW
2"
6"
CRUSHED
ROCK
VAULT & EXCAVATION DETAIL
Not to scale 6775.0030
TOP VIEW
7'
7'
PRIMARY CABLE & CONDUIT TABLE
LOCATION CONDUIT PRIMARY CABLE
ASBUILT INFORMATION
SIZE Qty LENGTH
Design
(ft)
BENDS PULL PULL Cable LENGTH
Design
(ft)
Cable Numbers Please Record Foreman - Complete
FROM TO (in)90°45°22°11°(lbs)
Rev
(lbs)Size A B C Manufacturer Compound Year Actual Amount Installed (Conduit & Cable)
P01 V01 2 1 95 1 105 103 1/0 135 EHI840
J01 V02 4 1 45 1 72 65 1/0 55 EHI841 *EXISTING 4" CROSSING AT J01
V02 V03 2 1 145 2 153 160 1/0 155 EHI842
Total : 285' = 2" SCH-80 Grey PVC Total : 90° Bends = 4
Total Lube = 6 quarts
Total : 345' 1/0 JKT AL INSTALLED
ONE-LINE DIAGRAM - J01 TO V02 TO V03 (HIG-13)
NOT TO SCALE
CONDUIT DIAGRAM - J01 TO V02 TO V03 (HIG-13)
NOT TO SCALE
CONDUIT DIAGRAM - P01 TO V01 (PRE-11)
NOT TO SCALE
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
UNDERGROUND MAP - BEFORE
NOT TO SCALE
FLOW DIRECTION
LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL,
SECURE WITH PEA GRAVEL BAGS (MID 9995692).
6'
3'
8"
TECHNIQUES FOR EROSION AND SEDIMENT CONTROL
FILTER FENCE DETAIL
Not to Scale 0150.3200
UTILITY POLE EROSION CONTROL DETAIL
TOP VIEW
DRY DRAINAGE DITCH or DRY VEGETATED SITE
SLOPE
Place gravel bags for
Sediment Trap
Place straw mulch
on disturbed areaExcavated or
Augered Hole
Pole
SLOPE
Not to scale Drainage ditches or Dry vegetated sites 105084051MFP17004813