Loading...
HomeMy WebLinkAboutP_Design_105084051_V1_171005318611-166710 75kVA 120/240v 318602-166683 100kVA 120/240v CUSTOMER OWNED, MAINTAINED AND INSTALLED SECONDARY CUSTOMER OWNED, MAINTAINED AND INSTALLED SECONDARY 318620-166726 X787 F: Unk N.O. 318622-166725 35'85'50 ' 318619-166715 100kVA 120/240v 70'25'318600-166677 SW # T78962 F: 40T HARRINGTON AVE NEHARRINGTON PL NE (PVT)DRIVEWAY (PVT) 60' ROW HARRINGTON PL NE (PVT)318622-166681 40T X5116 318622-166681 100kVA 120/240V 318596-166715 3X25kVA 120/208V ABCNABC# 2 A C S R #2 AC S R 318608-166723 3X37.5kVA 120/208V #2 ACSR CBAN"1159" "1143" "1135" "1177"CBAN#4 CUBGLENWOOD AVE NE SITE PLAN SCALE: 1" = 40' CIRCUIT FEET ADDED: 270'POWER GENERAL NOTES - COMMERCIAL PROJECT 8. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. Inclement weather conditions may cause delays in construction times and dates. 1. 2. 3. 4. 5. 6. 7. 9. 11. 10. SITE SPECIFIC NOTES P01 (318600-166677) -INST. 1 - 12KV 200A FG OH/UG TERMINATION PSE STD 6043.1000 (TSU1C1) -INST. 1 - #4CU - 2/0CU STRAIGHT LINE CLAMP (MID: 9240000) -1 - L/B C/O FUSE ON FG ARM @ 40T - INST. 1 - SWITCH # T78962 -INST. 1 - 2" RISER ON EXISTING STANDOFF BRACKETS PER STD 6042.1000 (RIS2CSS) V01 (318602-166683) -INST. 48" X 48" X 38" UNISTRUT MINIPAD VAULT W/ GNDS PER STD 6045.1010 (MINU1LR) -INST. 100KVA 120/240V PADMOUNT TRANSFORMER PER STD 6045.1010 (MID: 6247200) -INST. 1 - 12KV ELBOW KIT PER STD 6041.1000 (ELB10J) - INST. 1 - 12KV DUST CAP - CONNECT AND TAG 4 RUNS OF CUSTOMER INSTALLED, OWNED, AND MAINTAINED 500 KCMIL UG TRIPLEX- INST. GRID # 318602-166683 J01 (318622-166725) - REPLACE EXISTING B/O 4'8" X 4'8" LID W/ 1 - 3' SQUARE DIAMOND PLATE DOOR WITH LIKE KIND LID (MID: 7656400) -INST. 1 - 12KV ELBOW KIT PER STD 6041.1000 (ELB10J) V02 (318619-166715) -INST. 48" X 48" X 38" UNISTRUT MINIPAD VAULT W/ GNDS PER STD 6045.1010 (MINU1LR) - INST. 100KVA 120/240V PADMOUNT TRANSFORMER PER STD 6045.1010 (MID: 6247200) -INST. 2 - 12KV ELBOW KITS PER STD 6041.1000 (ELB10J) - CONNECT AND TAG 6 RUNS OF CUSTOMER INSTALLED, OWNED, AND MAINTAINED 400 KCMIL UG TRIPLEX - INST. GRID # 318619-166715 V03 (318611-166710) - INST. 48" X 48" X 38" UNISTRUT MINIPAD VAULT W/ GNDS PER STD 6045.1010 (MINU1LR) -INST. 1 - 75KVA 120/240V PADMOUNT TRANSFORMER PER STD 6045.1010 (MID:6247150) - INST. 1 - 12KV ELBOW KIT 6041.1000 (ELB10J) -INST. 1 - 12KV DUST CAP - CONNECT AND TAG 3 RUNS OF CUSTOMER INSTALLED, OWNED, AND MAINTAINED 500 KCMIL UG TRIPLEX - INST. GRID # 318611-166710 SPAN NOTES ** SEE TABLES AND ONE-LINE DIAGRAMS, PG2 ** DEVELOPER CIVIL CONTRACTOR NOTES: ·REQUIRED TO PROVIDE A 7' X 7' PIT AT V01, V02 AND V03. ·REQUIRED TO PROVIDE A 4' X 4' PIT AT EXISTING PSE FACILITIES. ·REQUIRED TO PROVIDE 6” CRUSHED ROCK AT V01, V02 AND V03. ·REQUIRED TO PROVIDE AND HAVE EQUIPMENT TO PUMP OUT WATER FOR METER BASE PITS & TRENCH AT ALL TIMES. CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS# 6750.6500. **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL ** DEVELOPER EXCAVATION NOTES: ·REQUIRED TO EXCAVATE & EXPOSED EXISTING PSE UG FACILITIES 48 HOURS BEFORE CONSTRUCTION ·ALL EQUIPMENT MUST BE PROTECTED FROM VANDALS WITH STEEL PLATE 48 HOURS BEFORE CONSTRUCTION. ·EXCAVATION MUST BE COMPLETED 48 HOURS PRIOR TO CONSTRUCTION. ·REQUIRED TO HAVE EXCAVATION EQUIPMENT ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING FOR THE UG PRIMARY & INSTALLATION OF THE 1PH OR 3PH VAULT. ·BACKFILL / COVER REQUIRED ON PRIMARY. CONTRACTOR TRENCHING IN CITY OR COUNTY OR W.S. DOT RIGHT OF WAY NOTES: PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT. IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS ALL INSPECTIONS ARE REQUIRED BY POTELCO INC ·IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEES WILL BE APPLIED. 6"6" MIN GUARD POST INSTALLATION MIN CONCRETE 2'-6" PAINTED YELLOW 3'-6" 6'-0" The following styles of guard posts are approved for Puget Sound Energy transformers: - 6 ft x 4 in. diameter Schedule 40 or better galvanized steel pipe filled with concrete. The concrete shall have a minimum compressive strength of 3000 psi after 28 days. The exposed portion of the post shall be painted traffic yellow. - 6 ft x 9 in. diameter precast steel-reinforced concrete post. Available from Utility Vault Company, Auburn, WA; or Hanson Inc., Tacoma, WA. The exposed portion of the post shall be painted traffic yellow. LENGTH GUARD POST INSTALLATION Not to scale 0700.1600-03 18" PAD & GUARD POST LOCATIONS XFMR FRONT GUARD POSTS 3' MIN MIN 5' MAX 5' MAX TYPICAL 3' MIN 5' MAX 5' MAX 5' MAX 18" MIN 5' MAX 5' MAX 5' MAX 5' MAX 5' MAX COOLING 5' MIN 5' MIN 10' MIN 5' MIN FINS ACCESS CONCRETE PAD MINIMUM CLEARANCES FOR PSE EQUIPMENT CURB OR EDGE OF PAVEMENT CURB OR EDGE OF PAVEMENT 5' MIN ROAD OR PARKING AREA TYP. PAD & TRANS- FORMER 3' MIN 18" MIN 18" MIN DOOR ACCESS DOOR REQUIRED WORK SPACE AREA 6775.0035 Not to scale LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: Owner / Developer Contact Info officeATTN: Sunset Court LLLP 2900 NE 10th Street Renton WA 98056 Sean McCarty 206-423-0689 105084051THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. GAS PHONE CABLE TV N/A PROJECT PHASE PWR NOTIF#ORDER# Superior Misc UG Perm Service UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP D. Goodale 425-495-7049 6/22/17 S. Reed 82-6425 6/22/17 Nate Linville 253-970-7284 Required Renton RHA Sunset Court Apartments (2) New 1Ø Primary Line Extensions and Perm Service 1124-1158 Harrington Ave NE, Renton, WA 98056 105084051 As Noted 1 of 2 King CSPSKEIN 23N 5E 9NW 2305E034 2305E040 2305E034 PRE-11 & HIG-13 E-Mail: Cell Phone: Project Manager Contact Information: Manager:David Goodale 425-495-7049 dave.goodale@pse.com N Vicinity Map BUILDING 2BUILDING 1 BUILDING 3 LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: BUILDING 4 (A & B) LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 105084051503739870 N/A 5,410 SQ FT 125A (x11) ELEC 52.5KW RES. 65A 1.7% @ XFMR 0.3% @ XFMR 5,410 SQ FT 125A (x11) ELEC 52.5KW RES. 65A 1.7% @ XFMR 0.3% @ XFMR 13,702 SQ FT 125A (x17) ELEC 66KW RESIDENTIAL 65A 1.4% 0.5% 17,526 SQ FT 125A (x23) ELEC 105KW RESIDENTIAL 65A 1.7% 0.3% ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE PRE-11 6/13/17 92 99 154 -15.35 - 92 114.35 154 Project Location PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE HIG-13 6/13/17 88 136 113 25.29 -- 113.29 136 113 AT V01, V02, & V03 REPLACE EXISTING 4'8" SQUAIRE VAULT LID V01, V02, & V03 TRANSFORMER CLEARANCES Not to scale 0700.1500-01 318602-166683 100kVA 120/240v 318600-166677 SWITCH # T78962 F: 40T PSE: 1Ø - 1/0 AL JKT, L = 135' BØ - EHI840 CUSTOMER PROVIDED, INSTALLED AND MAINTAINED SECONDARY (2) RUNS - 500kcmil UG TRIPLEX CUSTOMER PROVIDED, INSTALLED AND MAINTAINED SECONDARY (2) RUNS - 500kcmil UG TRIPLEX 318611-166710 75kVA 120/240v 318622-166725 318619-166715 100kVA 120/240v 318618-166736 225kVA 120/208v PSE: 1Ø - 1/0 AL JKT, L = 55' AØ - EHI841 CUSTOMER PROVIDED, INSTALLED AND MAINTAINED SECONDARY (6) RUNS - 400kcmil UG TRIPLEX PSE: 1Ø - 1/0 AL JKT, L = 155' AØ - EHI842 318575-166698 300kVA 120/208v CUSTOMER PROVIDED, INSTALLED AND MAINTAINED SECONDARY (3) RUNS - 500kcmil UG TRIPLEX EXISTING 3Ø UG CABLE AØ - 32410 BØ - 32411 CØ - 32412 EXISTING 3Ø UG CABLE AØ - 30487 BØ - 30488 CØ - 30489 PSE PROVIDED: (1) - 2" SCH-80 CONDUIT IN CUSTOMER TRENCH DEVELOPER: (1) - 4" SCH-80 CONDUIT EXISTING (1) - 4" SCH-80 CONDUIT CROSSINGDEVELOPER: 7' x 7' WORK PIT DEVELOPER: 7' x 7' WORK PIT PSE PROVIDED: (1) - 2" SCH-80 CONDUIT IN CUSTOMER TRENCH DEVELOPER: 7' x 7' WORK PIT HARRINGTON PL NE (PVT)DRIVEWAY (PVT)HARRINGTON PL NE (PVT)318608-166723 3X37.5kVA 120/208V ONE-LINE DIAGRAM - P01 TO V01 (PRE-11) NOT TO SCALE CUSTOMER-SUPPLIED TRENCHES Communications Primary Power Cables or Conduit Excavated Dirt Pile ROADSIDE Final Grade 24" Min 12" Min Separation 36" Min Cover 48" Max Backfill (No rocks over 10" diameter) Separation 12" Min Gas 4" Sand Bedding 32" Typical (Power, Gas, and Communications) JOINT TRENCH DETAIL Primary-Mainline Gas & Communications (NTS) Separation 12" Min 6" or 12" Min Sand Shading after Compaction - A 6" layer of sand is allowed when excavated native material contains rocks no larger than 8" in diameter. Trench and backfill requirements for primary electric line extension trenches (No PSE gas) - A 12" layer of sand is required when excavated native material contains rocks up to 10" in diameter. AT V01, V02, & V03 UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP D. Goodale 425-495-7049 6/22/17 S. Reed 82-6425 6/22/17 Nate Linville (253) 970-7284 Required Renton RHA Sunset Court Apartments (2) New 1Ø Primary Line Extensions and Perm Service 1124-1158 Harrington Ave NE, Renton, WA 98056 105084051 As Noted 2 of 2 King CSPSKEIN 23N 5E 9NW 2305E034 2305E040 2305E034 PRE-11 & HIG-13 Vault & Equipment Table Site Grid Number Vault Size & Cover Type & Size Equipment In Vault Primary Bushings Transformer ID Numbers (Company ID) ASBUILT INFORMATION Foreman-Complete LB DC V01 318602 166683 48"x48"x38" Unistrut HH Matid: 7663002 100kVA MP TRF 120/240 Matid: 6247200 1 1 V02 318619 166715 48"x48"x38" Unistrut HH Matid: 7663002 100kVA MP TRF 120/240 Matid: 6247200 2 0 V03 318611 166710 48"x48"x38" Unistrut HH Matid: 7663002 75kVA MP TRF 120/240 Matid: 6247150 1 1 EXCAVATION: 6 - 1/3 CUBIC YARDS 3'-6" SIDE VIEW 2" 6" CRUSHED ROCK VAULT & EXCAVATION DETAIL Not to scale 6775.0030 TOP VIEW 7' 7' PRIMARY CABLE & CONDUIT TABLE LOCATION CONDUIT PRIMARY CABLE ASBUILT INFORMATION SIZE Qty LENGTH Design (ft) BENDS PULL PULL Cable LENGTH Design (ft) Cable Numbers Please Record Foreman - Complete FROM TO (in)90°45°22°11°(lbs) Rev (lbs)Size A B C Manufacturer Compound Year Actual Amount Installed (Conduit & Cable) P01 V01 2 1 95 1 105 103 1/0 135 EHI840 J01 V02 4 1 45 1 72 65 1/0 55 EHI841 *EXISTING 4" CROSSING AT J01 V02 V03 2 1 145 2 153 160 1/0 155 EHI842 Total : 285' = 2" SCH-80 Grey PVC Total : 90° Bends = 4 Total Lube = 6 quarts Total : 345' 1/0 JKT AL INSTALLED ONE-LINE DIAGRAM - J01 TO V02 TO V03 (HIG-13) NOT TO SCALE CONDUIT DIAGRAM - J01 TO V02 TO V03 (HIG-13) NOT TO SCALE CONDUIT DIAGRAM - P01 TO V01 (PRE-11) NOT TO SCALE ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. UNDERGROUND MAP - BEFORE NOT TO SCALE FLOW DIRECTION LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS (MID 9995692). 6' 3' 8" TECHNIQUES FOR EROSION AND SEDIMENT CONTROL FILTER FENCE DETAIL Not to Scale 0150.3200 UTILITY POLE EROSION CONTROL DETAIL TOP VIEW DRY DRAINAGE DITCH or DRY VEGETATED SITE SLOPE Place gravel bags for Sediment Trap Place straw mulch on disturbed areaExcavated or Augered Hole Pole SLOPE Not to scale Drainage ditches or Dry vegetated sites 105084051