HomeMy WebLinkAboutA_Permit application 10-16-17DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
CITY OF
Renton 1
Planning Division 1 1055 South Grady Way, 6" Floor I Renton, WA 98057 1 425-430-7200
Email: franchisepermits(cDrentonwa.gov Website: _•ntonwa.gov
FRANCHISE PERMIT APPLICATION
Published• 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to ranchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency: Puget Sound Energy
Franchise Job Number: 141003505
Contact Name: Jeff Smith
Phone: 206-947-6785
Email: turnkeytelecom@gmail.com
Job Site Address: 1600 LOngacres Dr SW Project Name: PSE Metro Renton Substation
Description of work: PSE to construct aerial and underground fiber optics to improve system
reliability within the region. Please see attached plans
Please bill Redmond PSE office for this permit. 9515 Willows Rd NE, Redmond, WA, 98052
Please check all that apply:
® New Construction ❑ Repair/Relocate A Underground ® Overhead ❑ Sidewalk ❑ Street
N Open Trench ❑ Bore # of feet: 531
Contractor Name: NW utilities
Phone: 206-396-8304
State Contractors License #: NWUTISL972JN City of Renton Business License #:
"I certify that I am the owner or applicant's authorized agent and do hereby agree to abide to the terms and conditions set forth
under this permit and shall comply with the City of Renton's Trench Restoration and Street Overlay Requirements. "
Signature
Date 10-16-17
INSPECTIONS SHAn BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION L/NEAT 425-430-7203 OR BY GOING TO MYBUILDINGPERM/T.COM
Jobs are required to be called in for job start, re -inspection and project final. Re -inspection fees are billed at $75/hour.
rill r I C-L.V/ IJ LIULII VI I II I CCL III y.) 0I GII LJC.)Ll/CUU ICU UL U III UAIt[I UIII V) 14 UUy_N JJIIUI CV CIICJUU DIUI L UU(C.
Plan Review/Development Engineering Date
Approved as submitted
Pre -Construction Meeting required
Site Construction Inspector Date
Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Page 1 Published: 3/30/2017