Loading...
HomeMy WebLinkAboutC_Letter Requesting Overhead Dear Recipients; This letter states the reason that PSE needs to construct aerial fiber optics along Longacres Dr SW and SW Grady Way. In an effort to provide system reliability, PSE is required to monitor all substations within their service area. To monitor substations it is necessary to construct aerial fiber optics from PSE Metro substation at 1600 Longacres Dr SW to the closest Century Link interface at the corner of SW Grady Way & Longacres Dr SW. When substations are monitored within the region, it results in better service for the residents within the City of Renton as it minimizes downtime during outages as we quickly identify and resolve outages during the upcoming storm season. We appreciate the Cities assistance, as we upgrade our network reliability in the region. Thanks for your consideration in this matter. Sincerely, PSE Jeff Smith