HomeMy WebLinkAboutP_Design_105086573_V1_171018(1) RUN #1/0 UG TPX, ±253'
1-3" SCH'L 80 CONDUIT, ±213'
90°
R=36"
4'x4' WORK PIT
3/4 CU. YD.
OF SAND
3/4 CU. YD.
OF SAND
4'x4' WORK PIT
90°
R=36"
77'100'36'102RD AVE SESE 192ND ST
D/W
NEW
HOME
21815
77'100'36'
SITE PLAN
N
Vicinity Map
N/A
Owner / Developer Contact Info
officeATTN:
SERGE AFANASIEV
330 SW 43RD ST, K181
RENTON, WA 98055
SERGE AFANASIEV 206-227-1075 105086573THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
Perm. Service
OH TRF Removal
Superior
ORDER#NOTIF#
PWR
PROJECT PHASE
104296643505017711
583057919
105086573505017658
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
SCALE: 1" = 50'
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
NOP-26
2017
211 208 284
-1.61 -
211 209.61 287
SCALE: NONE
CIRCUIT ONE-LINE DIAGRAM
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
D. HONEYSETT 253-245-0883 9/14/17
D. HONEYSETT 253-245-0883 9/14/17
N/A N/A N/A
D. BRINKMANN 206-794-8599 9/14/17
RIGHTS REVIEW CITY OF RENTON
BELKA TRUCKING INC
UPGRADE TRF & INSTALL NEW UG PERM SVC
19208 102ND AVE SE, RENTON, WA 98055
N/A N/A
N/A 105086573
AS NOTED 1/1
KING COUNTY N/A N/A CSPCKEIN
T22N,R05E,NW SEC 5 N/A N/A
2205E018 2205E036 2205E018 NOP-26
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:D. HONEYSETT
253-245-0883
DAVID.HONEYSETT@PSE.COM
TV & TEL Electric Service Cable in Conduit
3" Sch'l 80 Grey PVC
Excavated Dirt Pile
Final Grade
24" Min
24" Min
to
36" Max
Cover
Backfill for Conduit
Free of rocks
larger than 8"
in diameter
Separation
6" Min
in Conduit
Sch'l 40 White PVC
Gas Service Line
32" Typical
(Power, Gas,
Phone & Cable)
Separation
4" Min
12" Min
Separation
36" MINIMUM COVER
IN RIGHT OF WAY
JOINT TRENCH DETAIL
Joint Service Line in Conduit (NTS)
To Excavated Dirt Pile
Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris,
glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE
SITE PLAN
SCALE: 1" = 50'
SITE SPECIFIC NOTES:
P01
-EXISTING POLE AND EQUIPMENT TO REMAIN
-REMOVE OH TEMP SVC
-REMOVE EXISTING OH 25kVA TRF
-INSTALL NEW OH 37.5kVA TRF
-INSTALL NEW 1-3" RISER ON NEW S/O BRACKETS
M01
-TRANSFER 200 AMP TO PERMANENT SVC WHEN CUSTOMER IS READY FOR PERMANENT SVC
-REMOVE OH TEMP SERVICE
SPAN NOTE:
P01 TO M01
-CUSTOMER TO INSTALL NEW 1-3" SCH'L 80 CONDUIT, ±213'
-CUSTOMER TO INSTALL (2) 36" - LONG SWEEP 90° SCH'L 80 BENDS
-PSE TO INSTALL 1 RUN #350 UG TPX, ± 253'
DEVELOPER & CUSTOMER NOTES:
-CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING , SELECT BACKFILL, RESTORATION AND COMPACTION PER
PSE STANDARDS #6750.6500.
-CUSTOMER NEEDS TO PROVIDE PROOF OF L&I INSPECTION 72 HOURS PRIOR TO CONSTRUCTION
-CUSTOMER TO PROVIDE 4'x4'WORK PIT & 3/4 CU. YD. OF SAND @ P01 & M01
-&86720(5723529,'($1',167$//',6&217,182866&+
/*5$<&21'8,7
-CUSTOMER TO PROVIDE & INSTALL 3/8" NON POLY PULL ROPE
ALL TRENCHING WILL REQUIRE AN INSPECTION BY PSE & CITY OF RENTON BEFORE FINAL BACKFILL.
ALL TRENCHING AND L&I INSPECTION MUST BE COMPLETED 72HRS BEFORE CONSTRUCTION.
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
3675 SQ.
200 AMPS
GAS
11 KW
140A
2.3%
3.8%
CIRCUIT FEED ADDED: 0'
32"
Typical
24"
Min
24"-36"
24"-36"
4'Top View
Electric & Joint Utility
Work Pit Dimensions
36"
Min
Drainage Pipe
12" Minimum Clearance
from Gas Service Lines
Conduit Depth
24" to 36" Max
Regulator Vent
Gas Meter Assembly
Utility Provided
48"
4'8"
Service (Permanent Detail:)
Not to Scale
Seal
Conduit
Ends
Closed
4'8"
24" Min
36" Typical
3'
To Trench
Property Line
Conduit StakesGas Service Line Conduit
3" Conduit Service Riser
Customer Provided
Elec. Mtr Base
Elec Mtr
utility provided
Gas Meter
Relief Vent
Building Wall
Elec. Mtr
PERMANENT METER DETAIL AT M02
NOT TO SCALE
JOB SITE
JOB SITE
POWER GENERAL NOTES - RESIDENTIAL PROJECT
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch
must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3)
working days in advance.
3.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the
underground facilities located.
4.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch
and details for locations. Equipment locations must be approved by the Project Manager.
5.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
6.Roads shall be paved or have a compacted , crushed rock base in place.
7.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls,
overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE
standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in
the right of way, and at least 1 foot when crossing them.
8.All work is to be done in accordance with local municipal and county permit requirements as applicable.
9.Inclement weather conditions may cause delays in construction times and dates.
10.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per
this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage
equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all
shoring or they will side slope the trench to 1:1.
OUTAGE LIST
10204 SE 192ND ST, RENTON, WA 98055
10215 SE 192ND ST, RENTON, WA 98055
10220 SE 192ND ST, RENTON, WA 98055
Standoff Bracket
15" Min Length
Conduit Clamp
Conduit
Field Face
Quadrant
Road Face
Quadrant
5" Min
Direction of Vehicular Traffic (Eastbound)
CONDUIT RISER PLACEMENT DETAIL
TOP VIEW
NOT TO SCALE
Climbing
Space
Climbing
Space
℄
℄
Removed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER REMOVAL
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
P01
315996-166087
25kVA
Installed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER INSTALLATION
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
P01
315996-166087
37.5kVA
6211300