Loading...
HomeMy WebLinkAboutP_Design_105086573_V1_171018(1) RUN #1/0 UG TPX, ±253' 1-3" SCH'L 80 CONDUIT, ±213' 90° R=36" 4'x4' WORK PIT 3/4 CU. YD. OF SAND 3/4 CU. YD. OF SAND 4'x4' WORK PIT 90° R=36" 77'100'36'102RD AVE SESE 192ND ST D/W NEW HOME 21815 77'100'36' SITE PLAN N Vicinity Map N/A Owner / Developer Contact Info officeATTN: SERGE AFANASIEV 330 SW 43RD ST, K181 RENTON, WA 98055 SERGE AFANASIEV 206-227-1075 105086573THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) Perm. Service OH TRF Removal Superior ORDER#NOTIF# PWR PROJECT PHASE 104296643505017711 583057919 105086573505017658 FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" SCALE: 1" = 50' ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE NOP-26 2017 211 208 284 -1.61 - 211 209.61 287 SCALE: NONE CIRCUIT ONE-LINE DIAGRAM OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP D. HONEYSETT 253-245-0883 9/14/17 D. HONEYSETT 253-245-0883 9/14/17 N/A N/A N/A D. BRINKMANN 206-794-8599 9/14/17 RIGHTS REVIEW CITY OF RENTON BELKA TRUCKING INC UPGRADE TRF & INSTALL NEW UG PERM SVC 19208 102ND AVE SE, RENTON, WA 98055 N/A N/A N/A 105086573 AS NOTED 1/1 KING COUNTY N/A N/A CSPCKEIN T22N,R05E,NW SEC 5 N/A N/A 2205E018 2205E036 2205E018 NOP-26 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A E-Mail: Cell Phone: Project Manager Contact Information: Manager:D. HONEYSETT 253-245-0883 DAVID.HONEYSETT@PSE.COM TV & TEL Electric Service Cable in Conduit 3" Sch'l 80 Grey PVC Excavated Dirt Pile Final Grade 24" Min 24" Min to 36" Max Cover Backfill for Conduit Free of rocks larger than 8" in diameter Separation 6" Min in Conduit Sch'l 40 White PVC Gas Service Line 32" Typical (Power, Gas, Phone & Cable) Separation 4" Min 12" Min Separation 36" MINIMUM COVER IN RIGHT OF WAY JOINT TRENCH DETAIL Joint Service Line in Conduit (NTS) To Excavated Dirt Pile Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter. OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE SITE PLAN SCALE: 1" = 50' SITE SPECIFIC NOTES: P01 -EXISTING POLE AND EQUIPMENT TO REMAIN -REMOVE OH TEMP SVC -REMOVE EXISTING OH 25kVA TRF -INSTALL NEW OH 37.5kVA TRF -INSTALL NEW 1-3" RISER ON NEW S/O BRACKETS M01 -TRANSFER 200 AMP TO PERMANENT SVC WHEN CUSTOMER IS READY FOR PERMANENT SVC -REMOVE OH TEMP SERVICE SPAN NOTE: P01 TO M01 -CUSTOMER TO INSTALL NEW 1-3" SCH'L 80 CONDUIT, ±213' -CUSTOMER TO INSTALL (2) 36" - LONG SWEEP 90° SCH'L 80 BENDS -PSE TO INSTALL 1 RUN #350 UG TPX, ± 253' DEVELOPER & CUSTOMER NOTES: -CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING , SELECT BACKFILL, RESTORATION AND COMPACTION PER PSE STANDARDS #6750.6500. -CUSTOMER NEEDS TO PROVIDE PROOF OF L&I INSPECTION 72 HOURS PRIOR TO CONSTRUCTION -CUSTOMER TO PROVIDE 4'x4'WORK PIT & 3/4 CU. YD. OF SAND @ P01 & M01 -&86720(5723529,'($1',167$//',6&217,182866&+ /*5$<&21'8,7“ -CUSTOMER TO PROVIDE & INSTALL 3/8" NON POLY PULL ROPE ALL TRENCHING WILL REQUIRE AN INSPECTION BY PSE & CITY OF RENTON BEFORE FINAL BACKFILL. ALL TRENCHING AND L&I INSPECTION MUST BE COMPLETED 72HRS BEFORE CONSTRUCTION. LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 3675 SQ. 200 AMPS GAS 11 KW 140A 2.3% 3.8% CIRCUIT FEED ADDED: 0' 32" Typical 24" Min 24"-36" 24"-36" 4'Top View Electric & Joint Utility Work Pit Dimensions 36" Min Drainage Pipe 12" Minimum Clearance from Gas Service Lines Conduit Depth 24" to 36" Max Regulator Vent Gas Meter Assembly Utility Provided 48" 4'8" Service (Permanent Detail:) Not to Scale Seal Conduit Ends Closed 4'8" 24" Min 36" Typical 3' To Trench Property Line Conduit StakesGas Service Line Conduit 3" Conduit Service Riser Customer Provided Elec. Mtr Base Elec Mtr utility provided Gas Meter Relief Vent Building Wall Elec. Mtr PERMANENT METER DETAIL AT M02 NOT TO SCALE JOB SITE JOB SITE POWER GENERAL NOTES - RESIDENTIAL PROJECT 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. 2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. 3.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. 4.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. 5.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. 6.Roads shall be paved or have a compacted , crushed rock base in place. 7.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. 8.All work is to be done in accordance with local municipal and county permit requirements as applicable. 9.Inclement weather conditions may cause delays in construction times and dates. 10.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. OUTAGE LIST 10204 SE 192ND ST, RENTON, WA 98055 10215 SE 192ND ST, RENTON, WA 98055 10220 SE 192ND ST, RENTON, WA 98055 Standoff Bracket 15" Min Length Conduit Clamp Conduit Field Face Quadrant Road Face Quadrant 5" Min Direction of Vehicular Traffic (Eastbound) CONDUIT RISER PLACEMENT DETAIL TOP VIEW NOT TO SCALE Climbing Space Climbing Space ℄ ℄ Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P01 315996-166087 25kVA Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: P01 315996-166087 37.5kVA 6211300