Loading...
HomeMy WebLinkAboutP_Traffic_Control_Plan(TCP)_105086573_V1_1710181313 1616131313 11var.SE 192ND ST102ND AV SE101ST PL SEP01#21815SHOULDERWORKW21-5UTILITYWORKAHEADW21-7100'100'UTILITY WORK AHEAD W21-7100'UTILITYWORKAHEADW21-7100'UTILITYWORKAHEADW21-7 100'SE 192ND PLSE 190TH STCHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Job#10508657319208 102nd Ave SE, Renton, WAOctober 10, 2017Sheet 1 of 1 yuriy.bashtovoy@pse.com(425)398-6193NPSEPUGETSOUNDENERGYPuget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 008997Card Exp. 08/13/2019gregory.harwood@pse.com(425)424-6425Notes:1. All signs and spacing to conform to the MUTCDand City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.4. Sign size can be a minimum of 48" x 48" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.m.LEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWPOLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAY