Franchise Permit: MFP17004938
IVR Number: 17004938
Permit Informa!on
Permit Name:Puget Sound Energy - Electric
Address/Loca!on:10/20/2017Applica!on Date:3628600010Parcel Number:1201 N 37TH ST
Permit Type :11/01/2017Issue Date:Franchise
Permit Work Class:11/01/2018Expira!on Date :Minor U%lity
Job Number:105086571Franchise Type :Electric
Descrip!on:Replace pole PO1 and upgrade transformer . Remove exis%ng overhead service to 1201. Bore across street to HH 1 and
install new handhold and cable for underground service. Transfer overhead service to new pole. Restora%on per City
of Renton standards .
Contacts
Name Address PhoneTypeBilling
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC - BILLING
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Applicant
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: BL.005109Electrical Contractor : POTELI*344O4
Construc!on Contractor : POTELI*227PL
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC - BILLING
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Specialized
Billing
X
General Condi!ons & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
MFP17004938
Scott Warlick 10/20/2017
Justin Johnson 11-1-2017
Contractor shall pot hole all existing utilities prior to boring.
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
Reset FormPrint Form
MFP17004938
Justin Johnson
11-1-2017
8:00 am to 3:00 pm
Monday through Friday
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
1212N 37th STWELLS AVE N1212WELLS AVE N
111117171212P01STOPFLAGGE
RSTOPFLAGG
E
R N 37TH STONE LANEROADAHEADW20-4100'100'100'ROADWORKAHEADW20-1W20-7A100'ROADWORKAHEADW20-1ROADWORKAHEADW20-1
ONE LANE
ROAD
AHEAD W20-4X'100'X'ROADWORKAHEADW20-1W20-7A100'ROADWORKAHEADW20-1PARK AVE NPARK AVE N#1201FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PA
RKNO PARK SIGNAGE WILL BEPLACED ON ALL STREETS TOSURROUND WORK ZONERESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSUREPATH OF INSTALLATIONNCHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Job#1050865711201 N 37th ST, Renton WAOctober 13, 2017Sheet 1 of 2 ryan.honeysett@pse.com(425)457-5381PSEPUGETSOUNDENERGYNotes:1. All signs and spacing to conform to the MUTCDand City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.4. Sign size can be a minimum of 48" x 48" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.m.TRENCH28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYPuget Sound EnergyTraffic Control Supervisor:Ryan HoneysettCard No. 010760Card Exp. 06/30/2021ryan.honeysett@pse.com(425)457-5381MFP17004938
1212N 37th STWELLS AVE N1212WELLS AVE N
111117171212P01STOPFLAG
G
ERHH1 N 37TH STX'100'ROADWORKAHEADW20-1W20-7AONE LANE
ROAD
AHEAD W20-4100'100'100'ROADWORKAHEADW20-1W20-7A100'ROADWORKAHEADW20-1PARK AVE NPARK AVE N#1201FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-P
ARKNO PARK SIGNAGE WILL BEPLACED ON ALL STREETS TOSURROUND WORK ZONERESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSUREROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4ROADWORKAHEADW20-1100'100'BEPREPAREDTOSTOPW3-4100'STOPFLAGGER
PATH OF INSTALLATIONNCHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Job#1050865711201 N 37th ST, Renton WAOctober 13, 2017Sheet 2 of 2 ryan.honeysett@pse.com(425)457-5381PSEPUGETSOUNDENERGYNotes:1. All signs and spacing to conform to the MUTCDand City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.4. Sign size can be a minimum of 48" x 48" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.m.TRENCH28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYPuget Sound EnergyTraffic Control Supervisor:Ryan HoneysettCard No. 010760Card Exp. 06/30/2021ryan.honeysett@pse.com(425)457-5381
1216
37193725
3706 3713
3711
3619
3613
36073604
1213
1205
120111151109
3701
1208120211141108
D/R
"1201"DRIVEWAYN 37TH STN 37TH ST 60'
319450-166172
STORM DRAIN
WHITE LINE
HAZ
15
ADU
319451-166208
319449-166190
15 KVA 120/240V
37.5 KVA 120/240V
JOB SITE
ASPHALT
SHOULDER
STORM DRAIN
4' X 4'
WORK PIT
3/4 YARD
OF SAND
N 37TH STN 37TH ST
3'
10'
15'
BORE
±60'
4' X 4'
WORK PIT
4 'X 4'
WORK PIT
5' X 6'
WORK PIT
4' X 6'
BORE PIT
DRIVEWAY-CUSTOMER TO INSTALL 1-3"SCH'L
80 CONDUIT, ±145'
-PSE TO INSTALL 1-RUN 350KCMIL
UG TPX, ±145'
-PSE TO INSTALL 1-RUN OF 4/0
KCMIL UG TPX TAIL, ±10'
-CUSTOMER TO INSTALL 1-3"SCH'L
80 CONDUIT, ±210'
-PSE TO INSTALL 1-RUN 350KCMIL
UG TPX, ±210'
-PSE TO INSTALL 1-RUN OF 4/0
KCMIL UG TPX TAIL, ±10'
WHITE LINE
JOB SITE
SITE PLAN
POWER GENERAL NOTES - RESIDENTIAL PROJECT
N
Vicinity Map
N/A
Owner / Developer Contact Info
officeATTN:
ALI KIMIAI
1201 N 37TH ST
RENTON, WA 98056
ALI KIMIAI 425-919-1809
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILESCALE: NONE
CIRCUIT ONE-LINE DIAGRAM
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
HAZ-15
2017
201 261 240
-3.95 -
201 264.95 240
OH TRF Removal
Perm. Service
Superior
ORDER#NOTIF#
PWR
PROJECT PHASE
104296642505017596
108103039
101108129505017544
108103038
101108127
CABLE TV
PHONE
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
10.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Inclement weather conditions may cause delays in construction times and dates.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
8.
9.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:RUSSELL PAGE
253-245-0192
RUSSELL.PAGE@PSE.COM
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
Installed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER INSTALLATION
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
P01
319449-166190
37.5 KVA 120/240V
6211300
SCALE: 1" = 50'105086571THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
105086571
593188626
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
RUSSELL PAGE 253-245-0192 10/2/17
RUSSELL PAGE 253-245-0192 10/2/17
N/A N/A N/A
TIN NGUYEN 253-244-4303 10/2/17
EASEMENT RENTON
ALI KIMIAI
OH TO UG CONVERSION /W POLE REM & OH TRF UPGRADE
1201 N 37TH ST, RENTON WA 98056
N/A N/A
N/A 105086571
N/A 1/2
KING N/A N/A CSPSKEIN
NW32-24N-05E N/A N/A
2405E126 2405E136 2405E126 HAZ-15
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
504858529
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
2780 SQ.
200 AMPS
ELECTRIC
14 KW
115 A
3.3 %
3.3 %
SITE SPECIFIC NOTES
P01 GRID# 319449-166190:
-REMOVE EXISTING B/O 40' POLE
-INSTALL 1-45' CL-3 DISTRIBUTION POLE W/GNDS
-INSTALL 1-POLE TOP PIN
-REMOVE EXISTING 15KVA 120/240 OH TRF
-INSTALL 37.5KVA 120/240 OH TRF
-INSTALL LB C/O FUSE @15T & TAP BØ
-INSTALL 1-STIRRUP BOLT
-INSTALL 2-RIGID CLEVIS (NORTH & SOUTH)
-TRANSFER OH SERVICE "1114", "1202", "1115"
-COMMUNICATIONS TO TRANSFER
-INSTALL NEW GRID# 319437-166190
HH1:
-INSTALL 17"X30" SECONDARY HANDHOLE
-INSTALL 3-6 POSITION FARGO BARS
M01:
-INSTALL 1-200AMP METER
M02:
-INSTALL 1-200AMP METER
SPAN SPECIFIC NOTES
P01/X01-HH1:
-BORE AND INSTALL 1-3" RED POLY CONDUIT, ±75'
-INSTALL 1-RUN OF 350KCMIL UG TPX, ±110'
P01-"1201":
-REMOVE EXISTING OH SEC CONDUCTOR & EXISTING METER
HH1 - M01:
-CUSTOMER TO INSTALL 1-3" SCH'L 80 CONDUIT, ±145'
-PSE TO INSTALL 1-RUN OF 350KCMIL UG TPX, ±155'
-PSE TO INTERCEPT & INSTALL 1-RUN OF 4/0KCMIL UG TPX TAIL, ±10'
HH1 - M02:
-CUSTOMER TO INSTALL 1-3" SCH'L 80 CONDUIT, ±210'
-PSE TO INSTALL 1-RUN OF 350KCMIL UG TPX, ±220'
-PSE TO INTERCEPT & INSTALL 1-RUN OF 40/KCMIL UG PTX TAIL, ±10'
CUSTOMER DEVELOPMENT NOTES
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL,
COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS.
#6750.6500
**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT
BACKFILL**
-CUSTOMER IS REQUIRED TO PROVIDE A 4' X 4' WORK PIT AT P01.
-CUSTOMER IS REQUIRED TO PROVED A 4' x 6' BORE PIT ON P01 SIDE.
-CUSTOMER IS REQUIRED TO PROVIDE A 5' X 6' WORK PIT AT HH1.
-CUSTOMER IS REQUIRED TO PROVIDE A 4' X 4' WORK PIT & 3/4 YARD OF
SAND AT M01.
-CUSTOMER IS REQUIRED TO PROVIDE A 4' X 4' WORK PIT & 3/4 YARD OF
SAND AT M02.
-CUSTOMER TO BORE & INSTALL
OF 1-3" DISCONTINUOUS RED POLY
CONDUIT FROM P01-HH1.
-CUSTOMER TO EXCAVATE & INSTALL
OF 1-3" DISCONTINUOUS SCH'L
80 GRAY PVC CONDUIT FROM HH1-M01.
--CUSTOMER TO EXCAVATE & INSTALL
OF 1-3" DISCONTINUOUS SCH'L
80 GRAY PVC CONDUIT FROM HH1-M02.
-CUSTOMER IS REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL
ROPE IN CONDUIT.
-CUSTOMER MUST HAVE A COPY OF PSE PROVIDED PERMIT ON SITE
DURING ANY DIGGING IN RIGHT OF WAY.
-CUSTOMER IS REQUIRED TO INSTALL METER BASE ON FRONT 1/3 OF
BUILDING.
ALL TRENCHING WILL REQUIRE AN INSPECTION BY PSE BEFORE FINAL
BACKFILL
ALL TRENCH AND L&I INSPECTION MUST BE COMPLETED 72HRS BEFORE
CONSTRUCTION
583057918
OUTAGE LIST
1115 N 37TH ST, RENTON WA 98056
1201 N 37TH ST, RENTON WA 98056
1114 N 37TH ST, RENTON WA 98056
1202 N 37TH ST, RENTON WA 98056
CIRCUIT FEET ADDED: 0'
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
1600 SQ.
200 AMPS
ELECTRIC
13 KW
80 A
3.5 %
2.6 %
HH1-M02
Removed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER REMOVAL
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
P01
319449-166190
15KVA 120/240V
Standoff Bracket
15" Min Length
Conduit Clamp
Conduit Field Face
Quadrant
Climbing
Space
Road Face
Quadrant
Climbing
Space
5" Min
CL LCDirection of Vehicular Traffic
CONDUIT RISER PLACEMENT DETAIL
TOP VIEW
Not to Scale
186050040
P01-HH1 HH1-M01
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
SQ.
AMPS
27 KW
A
2.8 %
2.3 %
New Handhole/Pole
Pole Removal
OH Misc
Purchase Conduit
Perm. Service
Ex. Svc Removal
POLE RETIREMENT TABLE TEMP TRANSFERS ST. LIGHT TRANSFERS
SITE
#
POLE DATA POLE
TEL TV FIBER TRAN RMVD ID NUMBER
GRID #HEIGHT CLASS YEAR TOPPED RMVD
P01 319449-166190 40 1956
POLE TABLE (NEW)
Site
#
Pole Data
Grid #Height Class Year Remarks / Location Ref.
P01 319449-166190 45 3 2017 PSE Equip #8974503
WIRE REMOVAL TABLE
Location
Wire Size & Type Quantity
Length
(per
conductor)RemarksFromTo
P01 M01 UNK 1 85 FT MFP17004938
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
RUSSELL PAGE 253-245-0192 10/2/17
RUSSELL PAGE 253-245-0192 10/2/17
N/A N/A N/A
TIN NGUYEN 253-244-4303 10/2/17
EASEMENT RENTON
ALI KIMIAI
OH TO UG CONVERSION /W POLE REM & OH TRF UPGRADE
1201 N 37TH ST, RENTON WA 98056
N/A N/A
N/A 105086571
N/A 2/2
KING N/A N/A CSPSKEIN
NW32-24N-05E N/A N/A
2405E126 2405E136 2405E126 HAZ-15
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
TV & TEL Electric Service Cable in Conduit
3" Schedule 80 Grey PVC
Excavated Dirt Pile
Final Grade
24" Min
24" Min
to
36" Max
Cover Separation
12" Min
20" Min
JOINT TRENCH DETAIL
Electric Service Cable in Conduit (NTS)
To Excavated Dirt Pile
36" MINIMUM COVER
IN RIGHT OF WAY
Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris,
glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.
Backfill for Conduit
Free of rocks
larger than 8"
in diameter)
FLOW DIRECTION
LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL,
SECURE WITH PEA GRAVEL BAGS (MID 9995692).
6'
3'
8"
TECHNIQUES FOR EROSION AND SEDIMENT CONTROL
FILTER FENCE DETAIL
Not to Scale 0150.3200
UTILITY POLE EROSION CONTROL DETAIL
TOP VIEW
DRY DRAINAGE DITCH or DRY VEGETATED SITE
SLOPE
Place gravel bags for
Sediment Trap
Place straw mulch
on disturbed areaExcavated or
Augered Hole
Pole
SLOPE
Not to scale Drainage ditches or Dry vegetated sites
32"
Typical
24"
Min
24"-36"
24"-36"
4'Top View
Electric & Joint Utility
Work Pit Dimensions
36"
Min
Drainage Pipe
12" Minimum Clearance
from Gas Service Lines
Conduit Depth
24" to 36" Max
Regulator Vent
Gas Meter Assembly
Utility Provided
48"
4'8"
Service (Permanent Detail:)
Not to Scale
Seal
Conduit
Ends
Closed
4'8"
24" Min
36" Typical
3'
To Trench
Property Line
Conduit Stakes
Customer Provided
3" Schedule 80 Grey PVC
Power Cable Conduit
Customer Provided
Gas Service Line Conduit
Sch 40 White PVC
Customer Provided
3" Conduit Service Riser
Customer Provided
Elec. Mtr Base
Elec Mtr
utility provided
Gas Meter
Relief Vent
Building Wall
Elec. Mtr
PERMANENT METER DETAIL AT M01 & M02
SCALE: NONE
BORE PIT DETAIL
Electric Service Cable in Conduit
Final Grade
24" Min
24" Min
to
36" Max
Cover
12" Typical
(6" Min)
36" MINIMUM COVER
IN RIGHT OF WAY
To Excavated Dirt Pile
3" Red Polyethelene
SCALE: NONE
Customer's
service
conductors27-1/4"
18"
Captive L-Bolt
Lock Cover, 10 lbs
40-1/2"
Conductors enter from
beneath and shall be
folded back with handhole
SIDE VIEW
2"
30"
Approx
Approx
17"
TOP VIEW
6'
5'
SINGLE PHASE SECONDARY HANDHOLE AT HH1
SCALE: NONE 6050.2000
MFP17004938