Loading...
HomeMy WebLinkAboutP_Design_101106030_V1_1711011011 76 8 9 SE 138TH PL. SE 139TH PL.156TH AVE. SEW'13908' 13922 '6505' '13833' DEMO OH SRVC. TO BE REMOVED BY OTHERS TRANSFER REMOVE +/-80' INSTALL +/-95' SLACK-SPAN 36'43' 30'30' (A.K.A. SE 139TH PL.) DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT Elect Order SCALE PAGE ENGR - POWER FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) SITE PLAN SCALE:1"=50' CIRCUIT FT. ADDED: 15' CIRCUIT FT. REMOVED: 0' L. J. Brown (425) 417-8620 10/2/17 L. J. Brown (425) 417-8620 10/2/17 J. Singleton (253) 395-6967 10/2/17 N/A City of Renton MeadowVue Pole Relocate / Pole Removal 13833 156th Ave. SE - Renton, WA 98059 PSE PLATS DEPT. N/A 101106030 1" = 50'1 of 1 KING N/A N/A QCSPLAT SW14 - T23 - R05E N/A N/A 2305E055/ 056 2306E076 2305E055/ 056 MAP-13 Comcast Jim Brooke (253) 261-2895 Century-Link Dena Overaa (206) 733-5262 MCI PSE Project Manager Lee J. Brown (425) 417-8620 POWER GENERAL NOTES - RELOCATION PROJECT 11. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. Inclement weather conditions may cause delays in construction times and dates. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 8. 9. 10. ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. Construction Notes: P01 - (317714-167897) PSE Dist. Secondary Pole Remove Exist. PSE Equipment and Top to Communications P02 - (317716-167906) New PSE Dist. Feeder Pole (Ang:<1°) Install 45ft. CL-2 Pole w/grounds as staked (PD452) - 6010.1000 Install 11ft. 8P Single Feeder Wing-Arm (TASW313) - 6033.4012 Replace Exist. 10kVA OH Transformer w/ New 15kVA (TRFLXF) - 6025.1000 -Fuse at 6T & Tap BØ Transfer Exist. Feeder & Neutral Conductors Transfer Exist. St.Light Secondary Conductor from P03 Transfer Exist. OH Service to address '13908' P2A - (317715-167904) Exist. PSE Dist. Feeder Pole Remove Exist. PSE Equipment and Top to Communications P03 - (317703-167906) New PSE Dist. Feeder Pole (Ang:1.16°) Install 45ft. CL-2 Pole w/grounds as staked (PD452) - 6010.1000 Install 11ft. 8P Single Feeder Wing-Arm (TASW313) - 6033.4012 Install 1Ø Arm-Mounted Tap as Slack-Span, Bolted DE (FR13RDE) - 6031.5060 -Fuse at 40T (3412500) & Tap CØ -Install SW#:X-79318 Transfer Exist. Feeder & Neutral Conductors Transfer Exist. St.Light Secondary Conductor from P02 Transfer Exist. St.Light P3A - (317706-167904) Exist. PSE Dist. Feeder Pole Remove Exist. PSE Equipment and Top to Communications P04 - (317705-167915) New PSE Dist. Double-DE Pole Install 45ft. CL-3 Pole w/grounds as staked (PD453) - 6010.1000 Install 1Ø Dead-End East under Full Tension, Auto-DE (DE2115) - 6031.1040 Install 1Ø Dead-End West as Slack-Span, Bolted DE (SSDD112) - 6031.5010 Install 10" Single-Helix Anchor West, Lead=8ft. (ANDH1) - 6012.1000 Install 3/8" Primary & Neutral Down-Guys (GYD3SA / GYD3SAN) - 6013.0100 Transfer Exist. #2ACSR Primary & Neutral Conductors RETIREMENT POLE TABLE TEMP TRANSFERS REMARKS SITE # POLE DATA POLE TEL FIBER FIBER ST. LIGHT GRID #HEIGHT CL.YR.TOPPED RMVD P01 317714-167897 40'2 1969 Comcast-Auburn / Century-Link P2A 317715-167904 40'1 1960 Comcast-Auburn / Century-Link / MCI P3A 317706-167904 40'1 1966 Comcast-Auburn / Century-Link / MCI Installed at site: P02 Grid Number: 317716-167906 kVA Rating: 25kVA Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: BØ Tested Secondary Voltage 120 240 Installed at site: P2A Grid Number: 317715-167904 kVA Rating: 10kVA Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: BØ Tested Secondary Voltage 120 240 PLACE PEA GRAVEL BAGS (MID 9995892) FOR SEDIMENT TRAP PLACE STRAW MULCH ON DISTURBED AREA AUGERED HOLE POLE TYPICAL AUGERED WORK SITE - 0150.3200 TECHNIQUES FOR EROSION AND SEDIMENT CONTROL DITCH OR SENSITIVE AREA POLE TABLE (NEW) Site # Pole Data Grid #Height Class Year Remarks / Location Ref. P02 317716-167906 45'CL-2 2017 Install in New Planter P03 317703-167906 45'CL-2 2017 Install in New Planter P04 317705-167915 45'CL-3 2017 Install in Existing Drainage Ditch N Vicinity Map PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" X X X X FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. 504727675 101106030 593188719 PROJECT PHASE PWR NOTIF#ORDER# Superior Retirement OH Wire Expense Misc. E-Mail: Cell Phone: Project Manager Contact Information: Manager:101106030Lee J. Brown (425) 417-8620 lee.brown@pse.com Owner / Developer Contact Info officeATTN: SSHI, LLC (dba D.R. Horton) 12910 Totem Lake Blvd. NE Suite:220 Kirkland, WA 98034 Patrick Danner (425) 821-3400 ext.5118 e-mailpdanner@drhorton.com 108101434 UG Wire Expense 583057890OH Tfmr. Expense FOREMAN #3 Job Site Job Site Job Site OVERHEAD CIRCUIT MAP - 2306E076 SCALE:1"= 6 MILES UNDERGROUND CIRCUIT MAP - 2305E055 / 056 SCALE:1"= 100'