HomeMy WebLinkAboutP_Design_101106030_V1_1711011011
76 8
9
SE 138TH PL.
SE 139TH PL.156TH AVE. SEW'13908'
13922
'6505'
'13833'
DEMO
OH SRVC. TO BE
REMOVED BY OTHERS
TRANSFER
REMOVE +/-80'
INSTALL +/-95'
SLACK-SPAN
36'43'
30'30'
(A.K.A. SE 139TH PL.)
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT
Elect Order
SCALE PAGE
ENGR - POWER
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
SITE PLAN
SCALE:1"=50'
CIRCUIT FT. ADDED: 15'
CIRCUIT FT. REMOVED: 0'
L. J. Brown (425) 417-8620 10/2/17
L. J. Brown (425) 417-8620 10/2/17
J. Singleton (253) 395-6967 10/2/17
N/A City of Renton
MeadowVue
Pole Relocate / Pole Removal
13833 156th Ave. SE - Renton, WA 98059
PSE PLATS DEPT.
N/A
101106030
1" = 50'1 of 1
KING N/A N/A QCSPLAT
SW14 - T23 - R05E N/A N/A
2305E055/ 056 2306E076 2305E055/ 056 MAP-13
Comcast
Jim Brooke
(253) 261-2895
Century-Link
Dena Overaa
(206) 733-5262
MCI PSE Project Manager
Lee J. Brown
(425) 417-8620
POWER GENERAL NOTES - RELOCATION PROJECT
11.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits
and crossings from the individual unit's meter base to the designated connection point.
Inclement weather conditions may cause delays in construction times and dates.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
8.
9.
10.
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
Construction Notes:
P01 - (317714-167897) PSE Dist. Secondary Pole
Remove Exist. PSE Equipment and Top to Communications
P02 - (317716-167906) New PSE Dist. Feeder Pole (Ang:<1°)
Install 45ft. CL-2 Pole w/grounds as staked (PD452) - 6010.1000
Install 11ft. 8P Single Feeder Wing-Arm (TASW313) - 6033.4012
Replace Exist. 10kVA OH Transformer w/ New 15kVA (TRFLXF) - 6025.1000
-Fuse at 6T & Tap BØ
Transfer Exist. Feeder & Neutral Conductors
Transfer Exist. St.Light Secondary Conductor from P03
Transfer Exist. OH Service to address '13908'
P2A - (317715-167904) Exist. PSE Dist. Feeder Pole
Remove Exist. PSE Equipment and Top to Communications
P03 - (317703-167906) New PSE Dist. Feeder Pole (Ang:1.16°)
Install 45ft. CL-2 Pole w/grounds as staked (PD452) - 6010.1000
Install 11ft. 8P Single Feeder Wing-Arm (TASW313) - 6033.4012
Install 1Ø Arm-Mounted Tap as Slack-Span, Bolted DE (FR13RDE) - 6031.5060
-Fuse at 40T (3412500) & Tap CØ
-Install SW#:X-79318
Transfer Exist. Feeder & Neutral Conductors
Transfer Exist. St.Light Secondary Conductor from P02
Transfer Exist. St.Light
P3A - (317706-167904) Exist. PSE Dist. Feeder Pole
Remove Exist. PSE Equipment and Top to Communications
P04 - (317705-167915) New PSE Dist. Double-DE Pole
Install 45ft. CL-3 Pole w/grounds as staked (PD453) - 6010.1000
Install 1Ø Dead-End East under Full Tension, Auto-DE (DE2115) - 6031.1040
Install 1Ø Dead-End West as Slack-Span, Bolted DE (SSDD112) - 6031.5010
Install 10" Single-Helix Anchor West, Lead=8ft. (ANDH1) - 6012.1000
Install 3/8" Primary & Neutral Down-Guys (GYD3SA / GYD3SAN) - 6013.0100
Transfer Exist. #2ACSR Primary & Neutral Conductors
RETIREMENT POLE TABLE TEMP TRANSFERS REMARKS
SITE
#
POLE DATA POLE
TEL FIBER FIBER ST. LIGHT
GRID #HEIGHT CL.YR.TOPPED RMVD
P01 317714-167897 40'2 1969 Comcast-Auburn / Century-Link
P2A 317715-167904 40'1 1960 Comcast-Auburn / Century-Link / MCI
P3A 317706-167904 40'1 1966 Comcast-Auburn / Century-Link / MCI
Installed at site: P02
Grid Number: 317716-167906
kVA Rating: 25kVA
Foreman to redline the following
information
TRANSFORMER INSTALLATION
Company ID#:
Primary phase connected to: BØ
Tested Secondary Voltage 120 240
Installed at site: P2A
Grid Number: 317715-167904
kVA Rating: 10kVA
Foreman to redline the following
information
TRANSFORMER REMOVAL
Company ID#:
Primary phase connected to: BØ
Tested Secondary Voltage 120 240
PLACE PEA GRAVEL
BAGS (MID 9995892)
FOR SEDIMENT TRAP
PLACE STRAW MULCH ON
DISTURBED AREA
AUGERED HOLE
POLE
TYPICAL AUGERED WORK SITE - 0150.3200
TECHNIQUES FOR EROSION AND SEDIMENT CONTROL
DITCH OR SENSITIVE AREA
POLE TABLE (NEW)
Site
#
Pole Data
Grid #Height Class Year Remarks / Location Ref.
P02 317716-167906 45'CL-2 2017 Install in New Planter
P03 317703-167906 45'CL-2 2017 Install in New Planter
P04 317705-167915 45'CL-3 2017 Install in Existing Drainage Ditch
N
Vicinity Map
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
X
X
X
X
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
504727675 101106030
593188719
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Retirement
OH Wire Expense
Misc.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:101106030Lee J. Brown
(425) 417-8620
lee.brown@pse.com
Owner / Developer Contact Info
officeATTN:
SSHI, LLC (dba D.R. Horton)
12910 Totem Lake Blvd. NE Suite:220
Kirkland, WA 98034
Patrick Danner (425) 821-3400 ext.5118
e-mailpdanner@drhorton.com
108101434
UG Wire Expense
583057890OH Tfmr. Expense
FOREMAN #3
Job
Site
Job
Site
Job
Site
OVERHEAD CIRCUIT MAP - 2306E076
SCALE:1"= 6 MILES
UNDERGROUND CIRCUIT MAP - 2305E055 / 056
SCALE:1"= 100'