HomeMy WebLinkAboutMFP17005239DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP17005239
IVR Number: 17005239
Permit Informa!on
Permit Name:Puget Sound Energy - Electric
Address/Loca!on:11/06/2017Applica!on Date:3342101525Parcel Number:915 N 32ND ST
Permit Type :11/08/2017Issue Date:Franchise
Permit Work Class:11/08/2018Expira!on Date :Minor U&lity
Job Number:101108434Franchise Type :Electric
Descrip!on:Remove exis&ng service wire from PO 1 to '915' and install transformer on PO 3. Trench across N 32nd ST and install
conduit. OH to UG 320A service to extend to lot '915'. Pavement cuts an&cipated. Restora&on per City of Renton
standards.
Contacts
Name Address PhoneTypeBilling
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC - BILLING
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Applicant
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: BL.005109Electrical Contractor : POTELI*344O4
Construc!on Contractor : POTELI*227PL
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC - BILLING
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Specialized
Billing
X
General Condi!ons & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
MFP17005239
Scott Warlick 11/7/2017
Justin Johnson 11-7-2017
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
Reset FormPrint Form
MFP17005239
Justin Johnson
11-7-2017
8:00 am to 3:00 pm
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
915N 32ND STBURNETT AVE NP03P01P02STOPFLAGGERSTOPFLAGGERONE LANEROADAHEADW20-4ROADWORKAHEADW20-1W20-7AX'X'X'ONE LANE
ROAD
AHEAD W20-4ROAD
WORK
AHEAD W20-1W20-7AX'X'X'BEPREPAREDTOSTOPW3-4ROADWORKAHEADW20-1 W20-7A X'X'X'BEPREPAREDTOSTOPW3-4ROADWORKAHEADW20-1W20-7AX'X'X'FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PAR
K PLACE SIGNS ONBOTH SIDES OFWORKING AREARESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSURE1010CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGYJOB#101108434915 N 32nd St Renton, WAOctober 28th, 2017mitchell.peterson@pse.com425-398-6071Sheet 1 of 2Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.Puget Sound EnergyTraffic Control Supervisor:Mitch PetersonCard No. 010804Card Exp. 08/30/2021mitchell.peterson@pse.com(425)398-607128" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPPOLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'MFP17005239
915N 32ND STBURNETT AVE NSTOPFLAGG
E
RSTOPFLAGG
ERONE LANEROADAHEADW20-4ROADWORKAHEADW20-1W20-7AX'X'X'ONE LANE
ROAD
AHEAD W20-4ROAD
WORK
AHEAD W20-1W20-7AX'X'X'BEPREPAREDTOSTOPW3-4ROADWORKAHEADW20-1 W20-7A X'X'X'BEPREPAREDTOSTOPW3-4ROADWORKAHEADW20-1W20-7AX'X'X'FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PAR
K PLACE SIGNS ONBOTH SIDES OFWORKING AREARESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSUREM011010CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGYJOB#101108434915 N 32nd St Renton, WAOctober 28th, 2017mitchell.peterson@pse.com425-398-6071Sheet 2 of 2Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.Puget Sound EnergyTraffic Control Supervisor:Mitch PetersonCard No. 010804Card Exp. 08/30/2021mitchell.peterson@pse.com(425)398-607128" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPPOLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'MFP17005239
P01BE
PREPARED
TO
STOP W3-4100'100'100'ROAD
WORK
AHEAD W20-1W20-7ABEPREPAREDTOSTOPW3-4100'100'100'ROADWORKAHEADW20-1W20-7ABURNETT AVE N
N 32ST ST1111 1111915STOP
FLAGGERSTOPFLAGGER BEPREPAREDTOSTOPW3-4100'100'100'ROADWORKAHEADW20-1W20-7ABEPREPAREDTOSTOPW3-4 100'100'100'ROADWORKAHEADW20-1 W20-7A
P03P02RESIDENT(S) WILL BEINFORMED OF POSSIBLETEMPORARY DRIVEWAYCLOSURE11111111
Job#101108434915 N 32ND ST, RENTON, WAOctober 30, 2017Sheet 1 of 1 gregory.harwood@pse.com(425) 424-6425NPSEPUGETSOUNDENERGYBORE PIT28" TRAFFIC CONELEGENDTRAFFIC FLOWWORK VEHICLESIGN LOCATIONWARNING FLAGFLAGGERTraffic Control Services - Sales & RentalsPermits & Consulting - Engineering - TrainingPLAN ORDER: 30812TMI CONTACT PERSON: Michael FlanaganNotes:1. All signs and spacing to conform to the MUTCD and City of RENTONstandards.2. All sidewalks, driveways, exits and egresses shall be completely clearunless otherwise indicated.3. Channelizing devices are 28" traffic cones.4. Sign size can be a minimum of 48" x 48" and shall not obstruct pedestrianaccess.5. Crew is required to leave a minimum of 11' for traveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.m.8. Work area will be 176' ECL of BURNETT AVE N & 19' NCL of N 32ND ST.TRAFFIC MANAGEMENT, INC.www.trafficmanagement.comC31 # 785804800.763.3999PLAN PREPARED BY:DATE: 10/30/2017 - JETCS CERT #: 301872CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040MINIMUM TAPER LENGTH = L (feet)LANEWIDTHSPOSTED SPEED LIMITS20 25 30 35 40 4510111255 +60/6545/5535/403025SIGN SPACING"X"800500'350'200'100'POLESTOPMFP17005239
PARCEL #3342101525BURNETT AVE N50'50'HAZ15N 32ND ST50'91550kVA 120/240v25kVA 120/240v50'CUSTOMER SUPPLIED4' X 4' WORK PITCUSTOMER SUPPLIED4' X 4' WORK PIT1-3" SCHED'L 80 PVC CONDUIT ± 125'INST. 1-RUN 4/0 UG TPX ± 160'CUSTOMER SUPPLIEDSCHED'L 80 PVC CONDUIT ± 45'CUSTOMER TO CUT & INSTALL 3/4" CUBIC YARD SANDCUSTOMER SUPPLIEDCUSTOMER SUPPLIED1 CUBIC YARD 5/8" CRUSHED ROCK90°90°HAZ15N 32ND ST50'91550kVA 120/240v25kVA 120/240v50'SITE PLANNVicinity MapN/AOwner / Developer Contact InfoofficeATTN:VAWTER CONSTRUCTION COMPANY INC.21036 98TH AVE SKENT, WA 98031GARY VAWTER(206) 849-6376ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSIONSTRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)EROSION & SEDIMENT CONTROL REQUIREMENTSNOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROLEROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.STANDARD EASEMENT PROVISIONAn easement is hereby reserved for and conveyed to Puget Sound Energy,Inc., Telephone Co., Television Cable Co., and their respective successorsand assigns under and upon the private street(s), if any, and the exteriorten (10) feet of all lots, tracts and spaces with in the plat lying parallel withand adjoining all street(s) in which to construct, operate, maintain, repair,replace and enlarge underground or ground-mounted appurtenancesthereto for the purpose of serving this subdivision and other property withelectric, gas, telephone and other utility service, together with the right toenter upon the streets, lots, tracts and spaces at all times for the purposesherein stated.101108434FOREMAN (CHECK BOX WHEN COMPLETED)PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.Grid, Cable, and Switch numbers INSTALLED & VERIFIED.Field Changes RED-LINED on As-built.Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.Foreman's Signature _______________________________________________Print Name ___________________________________ Date ______________Material VERIFIED and CHANGES noted on Paperwork.Total PRIMARY Cable noted on As-built.Company ID#'s RECORDED in correct location on As-built.Deviations noted on the As-built and their reason.I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met.GASPHONECABLE TVPROJECT PHASEPWRNOTIF#ORDER#SuperiorE-Mail:Cell Phone:Project Manager Contact Information:Manager:RUSSELL PAGE(253) 234-6444RUSSELL.PAGE@PSE.COMPSENoNoNoYesYesYesNoYesDeveloper"Flagging Required""Outages Required""Locates Required"SCALE: 1" = 50'THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL 811 TWO BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)UTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPR. PAGE(253) 234-644410/12/17R. PAGE(253) 234-644410/12/17T. MYER(714) 893-240510/12/17REQ'DRENTONOH TO UG FOR DEMO REBUILDNEW TRANSFORMER, SVC CONVERSION915 N 32ND ST, RENTON, WA 98056N/AN/AN/A101108434AS NOTED1 OF 1KINGN/AN/ACSPSKEINSW 32-24N-05EN/AN/A2405E1272405E1242405E127HAZ-15N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A10110843450485845132"Typical24"Min24"-36"24"-36"4'Top ViewElectric & Joint UtilityWork Pit Dimensions36"MinDrainage Pipe12" Minimum Clearancefrom Gas Service LinesConduit Depth24" to 36" MaxRegulator VentGas Meter AssemblyUtility Provided48"4'8"Service (Permanent Detail:)Not to ScaleSealConduitEndsClosed4'8"24" Min36" Typical3'To TrenchProperty LineConduit StakesCustomer Provided3" Schedule 40 Grey PVCPower Cable ConduitCustomer ProvidedGas Service Line ConduitSch 40 White PVCCustomer Provided3" Conduit Service RiserCustomer ProvidedElec. Mtr BaseElec Mtrutility providedGas MeterRelief VentBuilding WallElec. MtrSCALE: NONEMETER DETAIL @ M01SITE SPECIFIC NOTESP01: 319288-166104-EXISTING POLE TO REMAIN-INSTALL 25kVA 120/240v (FUSE @ 10T) (TRFNXF) PER STD 6025.1000-INSTALL 3" SEC RISER (RIS3CSS) PER STD 6042.1000-REMOVE SEC SPAN TO 319287-166114-REMOVE EXISTING OH SVC TO "915"P02: 319287-166114-EXISTING POLE TO REMAIN-REMOVE SEC. SPAN TO 319288-166104P03: 319288-166099-EXISTING POLE TO REMAIN-TRANSFER SEC SPAN TO NEW XFMR ON 319288-166104M01: NEW METER BASE-INSTALL 200A METERCUSTOMER & DEVELOPER NOTESTHE CUSTOMER IS RESPONSIBLE TO PROVIDE ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATIONPER PUGET SOUND ENERGY STANDARDS 6750.65005(48,5('723529,'( ,167$//´',6&217,1828639&&21'8,7)520P01-M01 +/-170'5(48,5('723529,'( ,167$//´12132/<38//523(,1$//&21'8,76-REQUIRED TO PROVIDE 4' X 4' WORK PIT & 1 CUBIC YARD 5/8" CRUSHED ROCK & 3/4 CUBIC YARD OF SAND AT P015(48,5('723529,'(¶;¶:25.3,7 &8%,&<$5'2)6$1'$7M01-REQUIRED TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL-REQUIRED TO PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS & TRENCH AT ALL TIMES-REQUIRED TO EXCAVATE & EXPOSE EXISTING PSE UG FACILITIES 48 HOURS PRIOR TO CONSTRUCTION-PSE INSPECTION IS REQUIRED PRIOR TO FINAL BACKFILL-PSE WILL NOT ENERGIZE FACILITIES UNTIL BACKFILL IS COMPLETE-RENTON INSPECTION & APPROVAL IS REQUIRED 5 BUSINESS DAYS PRIOR TO CONNECTIONSPAN SPECIFIC NOTESX01:&86720(572&87 ,167$//6&+
/3,3(
3(536(63(&,),&$7,216-CUSTOMER TO RESTORE ROAD SURFACE PER CITY OF RENTON STANDARDSX01 TO M01:&86720(572,167$//6&+
/&21'8,7
P01 TO M01:,167$//5818*73;¶CONDUIT RISER PLACEMENT DETAILSCALE: NONEConduitField FaceQuadrantClimbingSpaceRoad FaceQuadrantClimbingSpace5" MinCLLCDirection of Vehicular TrafficStandoff Bracket15" Min LengthConduit ClampUNDERGROUNDCABLE CONDUITSTO THIS QUADRANTTV & TELElectric Service Cable in Conduit3" Schedule 80 Grey PVCExcavated Dirt PileFinal Grade24" Min24" Minto36" MaxCoverSeparation12" Min20" Min JOINT TRENCH DETAILElectric Service Cable in Conduit (NTS)To Excavated Dirt Pile36" MINIMUM COVERIN RIGHT OF WAYBackfill for ConduitFree of rockslarger than 8"in diameter)Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris,glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketchmust be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) workingdays in advance.3.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get theunderground facilities located.4.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketchand details for locations. Equipment locations must be approved by the Project Manager.5.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials whichwould restrict construction and/or equipment access, before work can begin.6.Roads shall be paved or have a compacted , crushed rock base in place.7.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls,overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSEstandards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them inthe right of way, and at least 1 foot when crossing them.8.All work is to be done in accordance with local municipal and county permit requirements as applicable.9.Inclement weather conditions may cause delays in construction times and dates.10.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per thissketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slopethe trench to 1:1.POWER GENERAL NOTES - RESIDENTIAL PROJECTCIRCUIT LOADING TABLEAS OFEXIST. PEAK LOADEST. NEW LOADTOTALCIRCUIT:A PHASE B PHASE C PHASEHAZ-1506/2017201.00261.00240.000.000.001.46201.00261.00241.46OVERHEAD CIRCUIT MAP 2405E124SCALE: 6" = 1 MILECIRCUIT FEET ADDED: 0'SQ. FOOTAGE: 3000 SQ FTPANEL SIZE: 320AHEAT TYPE: ELECTRICEST. DEMAND: 10KWLRC: 115A% V. DROP: 2.6%% FLICKER: 3.7%NEW CABLE & CONDUIT DIAGRAMNOT TO SCALEJOB SITEJOB SITEASPLUNDH CONSTRUCTION CORP.TOP VIEW108103426593189543101108471108103427Installed at site:Grid Number:kVA Rating:Foreman to redline the following informationTRANSFORMER INSTALLATIONCompany ID#:Primary phase connected to:Tested Secondary VoltageMaterial ID#:P01319288-16610425kVA6211250Removal505117748depth as mainline trench conduit.3" of Sand Bedding3" of Sand Shading36" Min Cover(38" Max)6"Road crossing must be at samePavementCurbSidewalkR/WROAD CROSSING ELEVATIONNot to scale6790.0075OUTAGE LIST915 N 32ND ST, RENTON, WA 98056 - BEATRICE PAVLIK909 N 32ND ST, RENTON, WA 98056 - KENNETH HUEBNER910 N 32ND ST, RENTON, WA 98056 - CHRISTOPHER BARRYPLACE PEA GRAVELBAGS (MID 9995892)FOR SEDIMENT TRAPPLACE STRAW MULCH ONDISTURBED AREAAUGERED HOLEPOLETYPICAL AUGERED WORK SITE - 0150.3200TECHNIQUES FOR EROSION AND SEDIMENT CONTROLDITCH OR SENSITIVE AREALOCATES DETAILSCALE: 1" = 50'SvcMFP17005239