Loading...
HomeMy WebLinkAboutMFP17005289DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP17005289 IVR Number: 17005289 Permit Informa!on Permit Name:Puget Sound Energy - Electric Address/Loca!on:11/07/2017Applica!on Date:0088000244Parcel Number:16211 116TH AVE SE Permit Type :12/06/2017Issue Date:Franchise Permit Work Class:12/06/2018Expira!on Date :Minor U&lity Job Number:105086628Franchise Type :Electric Descrip!on:Replace bad order pole, install new transformer and riser at P 01. trenching and conduit will be installed from P 01 to M01 at '16211'. Hard surface cut at P 01. Restora&on per City of Renton standards . Contacts Name Address PhoneTypeBilling ANISH KUMAR PUGET SOUND ENERGY - ELECTRIC - BILLING 6905 S 228th St Kent, WA 98032 B: (253) 208-2183Applicant Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: BL.005109Electrical Contractor : POTELI*344O4 Construc!on Contractor : POTELI*227PL CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner ANISH KUMAR PUGET SOUND ENERGY - ELECTRIC - BILLING 6905 S 228th St Kent, WA 98032 B: (253) 208-2183Specialized Billing X General Condi!ons & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 | Published: 3/30/2017 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 3/30/2017 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street ☐ Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date MFP17005289 Scott Warlick 11/9/2017 Justin Johnson 11-27-2017 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: • Comply with all traffic regulations of the City of Renton and the State of Washington. • Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. • Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. • Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. • Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. • The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. • In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. • Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. • By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: Reset FormPrint Form MFP17005289 Justin Johnson 11-27-2017 9:00 am to 3:00 pm Monday through Friday SKETCH I -- NORTH -- I NOTES: • Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. • The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. • Approved Temporary Traffic Control Plan must be at the work site during work hours. • Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. • Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. • Total road closure lasting more than 24 hours is subject to the approval by the City Council. • Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: • Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. • Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. • The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. • Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). 141410 18 CASCADE ELEMENTARY SCHOOL STOP FLAGGER ONE LANE ROAD AHEAD W20-4100'100'100'ROAD WORK AHEAD W20-1W20-7AONE LANEROADAHEADW20-4100'100'100'ROADWORKAHEADW20-1W20-7A#16211 116TH AVE SE116TH AVE SESE 162ND ST P01 1515SE 163RD ST FROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARKFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKSTOP FLAGGER BEPREPAREDTOSTOPW3-4 100'100'100'ROADWORKAHEADW20-1 W20-7A 100'ROADWORKAHEADW20-1CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 N PSE PUGET SOUND ENERGY JOB#105086628 16211 116th Ave SE, Renton WA October 28, 2017 ryan.honeysett@pse.com425-457-5381 SHEET 1 OF 1 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. 28" TRAFFIC CONE LEGEND TRAFFIC FLOW WORK VEHICLE SIGN LOCATION WARNING FLAG FLAGGER STOP POLE Puget Sound Energy Traffic Control Supervisor: Ryan Honeysett Card No. 010760 Card Exp. 06/30/2021 ryan.honeysett@pse.com (425)457-5381 PRINT ON 11 X 17 SHEETS ONLY MFP17005289 NEW "16211" 15' 4' 12' 18' 72'116TH AVE SE116TH AVE SE 316981-166570 NEW 25KVA 120/240V JOB SITE 4' X 4' WORK PIT 4' X 4' WORK PIT 3/4 YARD OF SAND -CUSTOMER TO INSTALL 1-3" SCH'L 80 CONDUIT, 150' -PSE TO INSTALL 1 RUN OF 4/0 UG TPX, 185' JOB SITE SITE PLAN POWER GENERAL NOTES - RESIDENTIAL PROJECT N Vicinity Map N/A Owner / Developer Contact Info officeATTN: Poheng Siev 320 Lynnwood Ave SE Renton, WA 98056 Laura Gloudeman 206-817-2063 OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILESCALE: NONE ONE-LINE DIAGRAM ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE ROL-16 2017 205 191 213 -1.46 - 205 192.46 213 HP Svc/MSA Distribution New Pole Perm. Service Superior ORDER#NOTIF# PWR PROJECT PHASE 104297165505057169 101108466 CABLE TV PHONE GAS FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. 10. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Inclement weather conditions may cause delays in construction times and dates. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 8. 9. E-Mail: Cell Phone: Project Manager Contact Information: Manager:RUSSELL PAGE 253-245-0192 RUSSELL.PAGE@PSE.COM PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: P01 316998-166567 25KVA 120/240V 6211250 SCALE: 1" = 50'105086628THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) Service Stubs 105086628 UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP RUSSELL PAGE 253-245-0192 10/16/17 RUSSELL PAGE 253-245-0192 10/16/17 N/A N/A N/A TIN NGUYEN 253-244-4303 10/16/17 N/A RENTON SIEV POLE REPLACEMENT & TRF INST & UG SVC 16211 116TH AVE SE, RENTON WA 98058 N/A N/A N/A 105086628 AS NOTED 1/1 KING N/A N/A CSPSKEIN NW 28-23N-05E N/A N/A 2305E110 2305E136 2305E110 ROL-16 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 504873499 LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 3,133 SQ. 200 AMPS GAS 10 KW 115 A 1.3% 4.0% CIRCUIT FEET ADDED: 0' SITE SPECIFIC NOTES: P01 GRID# 316981-166570: -REMOVE EXISTING B/O 40' POLE -INSTALL NEW 45' CLASS 2 POLE W/ GNDS PER STD 6010.1000 (PD452) -INSTALL 4-POLE TOP PIN -INSTALL 1-8 PIN 11' CROSSARM PER STD 6033.3012 (TAP313) -TRANSFER EXISTING PRIMARY AND NEUTRAL WIRES -INSTALL 1-25KVA 120/240 OH TRF PER STD 6025.1000 (6211250) -INSTALL L/B C/O FUSE @ 10T & TAP BØ (3412200) -INSTALL STIRRUP BOLT -INSTALL 1-3" CONDUIT RISER W/ STD BRKT PER STD 6042.1000 (RIS3CSS) -COMMUNICATIONS TO TRANSFER -REMOVE EXISTING GRID# 316981-166570 -INSTALL NEW GRID# 316998-166567 M01: -INSTALL 200AMP METER SPAN SPECIFIC NOTES: P01 - M01: -CUSTOMER TO INSTALL 1-3" SCH'L 80 CONDUIT, ±150' -PSE TO INSTALL 1 RUN OF 4/0 UG TPX, ±185' CUSTOMER DEVELOPMENT NOTES CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS.#6750.6500 **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** -CUSTOMER IS REQUIRED TO PROVIDE A 4' X 4' WORK PIT AT P01. -CUSTOMER IS REQUIRED TO PROVIDE MINIMUM OF 1 CUBIC YARD OF 5/8" CRUSHED ROCK AT P01. -CUSTOMER IS REQUIRED TO PROVIDE A 4' X 4' WORK PIT AND 3/4 YARD OF SAND AT M01. -CUSTOMER IS REQUIRED TO EXCAVATE & INSTALL “ OF 1-3" DISCONTINUOUS SCH'L 80 GRAY PVC CONDUIT FROM P01-M01. -CUSTOMER IS REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL CONDUITS. -CUSTOMER IS RESPONSIBLE FOR ALL TREE TRIMMING AND BRUSH CLEARING. -CUSTOMER MUST HAVE A COPY OF PSE PROVIDED PERMIT ON SITE DURING ANY DIGGING IN RIGHT OF WAY. -CUSTOMER IS REQUIRED TO HAVE EXCAVATION EQUIPMENT ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING. ALL TRENCHING WILL REQUIRE AN INSPECTION BY PSE BEFORE FINAL BACKFILL ALL TRENCHES AND L&I INSPECTION MUST BE COMPLETED 5 BUSINESS DAYS BEFORE CONSTRUCTION POLE RETIREMENT TABLE TEMP TRANSFERS ST. LIGHT TRANSFERS SITE # POLE DATA POLE TEL TV FIBER TRAN RMVD ID NUMBER GRID #HEIGHT CLASS YEAR M RMVD P01 316981-166570 40 UNK 1959 TV & TEL Electric Service Cable in Conduit 3" Schedule 80 Grey PVC Excavated Dirt Pile Final Grade 24" Min 24" Min to 36" Max Cover Separation 12" Min 20" Min JOINT TRENCH DETAIL Electric Service Cable in Conduit (NTS) To Excavated Dirt Pile 36" MINIMUM COVER IN RIGHT OF WAY Backfill for Conduit Free of rocks larger than 8" in diameter) Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter. POLE TABLE (NEW) Site # Pole Data Grid #Height Class Year Remarks / Location Ref. P01 316998-166567 45 2 2017 PSE Equip # FLOW DIRECTION LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS (MID 9995692). 6' 3' 8" TECHNIQUES FOR EROSION AND SEDIMENT CONTROL FILTER FENCE DETAIL Not to Scale 0150.3200 UTILITY POLE EROSION CONTROL DETAIL TOP VIEW FLOWING DITCH or BODY OD WATER SLOPE Secure bottom of fence with gravel bags Place straw mulch on disturbed areaExcavated or Augered Hole Pole SLOPE Not to scale Adjacent to flowing ditches or bodies of water Install silt fence around pole excavation permits.bosco@gmail.com 108103421Pole Removal CONDUIT RISER PLACEMENT DETAIL TOP VIEW Not to Scale Standoff Bracket 15" Min Length Conduit Clamp Conduit Field Face Quadrant Climbing Space Road Face Quadrant Climbing Space 5" Min CL LCDirection of Vehicular Traffic MFP17005289