HomeMy WebLinkAboutP_Design_105086628_V1_171107NEW
"16211"
15'
4'
12'
18'
72'116TH AVE SE116TH AVE SE
316981-166570
NEW 25KVA 120/240V
JOB SITE
4' X 4' WORK PIT
4' X 4' WORK PIT
3/4 YARD OF SAND
-CUSTOMER TO INSTALL 1-3" SCH'L 80
CONDUIT, 150'
-PSE TO INSTALL 1 RUN OF 4/0 UG TPX,
185'
JOB SITE
SITE PLAN
POWER GENERAL NOTES - RESIDENTIAL PROJECT
N
Vicinity Map
N/A
Owner / Developer Contact Info
officeATTN:
Poheng Siev
320 Lynnwood Ave SE
Renton, WA 98056
Laura Gloudeman 206-817-2063
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILESCALE: NONE
ONE-LINE DIAGRAM
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
ROL-16
2017
205 191 213
-1.46 -
205 192.46 213
HP Svc/MSA
Distribution
New Pole
Perm. Service
Superior
ORDER#NOTIF#
PWR
PROJECT PHASE
104297165505057169
101108466
CABLE TV
PHONE
GAS
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
10.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Inclement weather conditions may cause delays in construction times and dates.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
8.
9.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:RUSSELL PAGE
253-245-0192
RUSSELL.PAGE@PSE.COM
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
Installed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER INSTALLATION
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
P01
316998-166567
25KVA 120/240V
6211250
SCALE: 1" = 50'105086628THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
Service Stubs
105086628
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
RUSSELL PAGE 253-245-0192 10/16/17
RUSSELL PAGE 253-245-0192 10/16/17
N/A N/A N/A
TIN NGUYEN 253-244-4303 10/16/17
N/A RENTON
SIEV
POLE REPLACEMENT & TRF INST & UG SVC
16211 116TH AVE SE, RENTON WA 98058
N/A N/A
N/A 105086628
AS NOTED 1/1
KING N/A N/A CSPSKEIN
NW 28-23N-05E N/A N/A
2305E110 2305E136 2305E110 ROL-16
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
504873499
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
3,133 SQ.
200 AMPS
GAS
10 KW
115 A
1.3%
4.0%
CIRCUIT FEET ADDED: 0'
SITE SPECIFIC NOTES:
P01 GRID# 316981-166570:
-REMOVE EXISTING B/O 40' POLE
-INSTALL NEW 45' CLASS 2 POLE W/ GNDS PER STD 6010.1000 (PD452)
-INSTALL 4-POLE TOP PIN
-INSTALL 1-8 PIN 11' CROSSARM PER STD 6033.3012 (TAP313)
-TRANSFER EXISTING PRIMARY AND NEUTRAL WIRES
-INSTALL 1-25KVA 120/240 OH TRF PER STD 6025.1000 (6211250)
-INSTALL L/B C/O FUSE @ 10T & TAP BØ (3412200)
-INSTALL STIRRUP BOLT
-INSTALL 1-3" CONDUIT RISER W/ STD BRKT PER STD 6042.1000 (RIS3CSS)
-COMMUNICATIONS TO TRANSFER
-REMOVE EXISTING GRID# 316981-166570
-INSTALL NEW GRID# 316998-166567
M01:
-INSTALL 200AMP METER
SPAN SPECIFIC NOTES:
P01 - M01:
-CUSTOMER TO INSTALL 1-3" SCH'L 80 CONDUIT, ±150'
-PSE TO INSTALL 1 RUN OF 4/0 UG TPX, ±185'
CUSTOMER DEVELOPMENT NOTES
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER
PUGET SOUND ENERGY STANDARDS.#6750.6500
**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL**
-CUSTOMER IS REQUIRED TO PROVIDE A 4' X 4' WORK PIT AT P01.
-CUSTOMER IS REQUIRED TO PROVIDE MINIMUM OF 1 CUBIC YARD OF 5/8" CRUSHED ROCK AT P01.
-CUSTOMER IS REQUIRED TO PROVIDE A 4' X 4' WORK PIT AND 3/4 YARD OF SAND AT M01.
-CUSTOMER IS REQUIRED TO EXCAVATE & INSTALL
OF 1-3" DISCONTINUOUS SCH'L 80 GRAY PVC CONDUIT
FROM P01-M01.
-CUSTOMER IS REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL CONDUITS.
-CUSTOMER IS RESPONSIBLE FOR ALL TREE TRIMMING AND BRUSH CLEARING.
-CUSTOMER MUST HAVE A COPY OF PSE PROVIDED PERMIT ON SITE DURING ANY DIGGING IN RIGHT OF WAY.
-CUSTOMER IS REQUIRED TO HAVE EXCAVATION EQUIPMENT ON SITE THE DAY OF CONSTRUCTION TO
COMPLETE BACKFILLING.
ALL TRENCHING WILL REQUIRE AN INSPECTION BY PSE BEFORE FINAL BACKFILL
ALL TRENCHES AND L&I INSPECTION MUST BE COMPLETED 5 BUSINESS DAYS BEFORE CONSTRUCTION
POLE RETIREMENT TABLE TEMP TRANSFERS ST. LIGHT TRANSFERS
SITE
#
POLE DATA POLE
TEL TV FIBER TRAN RMVD ID NUMBER
GRID #HEIGHT CLASS YEAR M RMVD
P01 316981-166570 40 UNK 1959
TV & TEL Electric Service Cable in Conduit
3" Schedule 80 Grey PVC
Excavated Dirt Pile
Final Grade
24" Min
24" Min
to
36" Max
Cover Separation
12" Min
20" Min
JOINT TRENCH DETAIL
Electric Service Cable in Conduit (NTS)
To Excavated Dirt Pile
36" MINIMUM COVER
IN RIGHT OF WAY
Backfill for Conduit
Free of rocks
larger than 8"
in diameter)
Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris,
glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.
POLE TABLE (NEW)
Site
#
Pole Data
Grid #Height Class Year Remarks / Location Ref.
P01 316998-166567 45 2 2017 PSE Equip #
FLOW DIRECTION
LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL,
SECURE WITH PEA GRAVEL BAGS (MID 9995692).
6'
3'
8"
TECHNIQUES FOR EROSION AND SEDIMENT CONTROL
FILTER FENCE DETAIL
Not to Scale 0150.3200
UTILITY POLE EROSION CONTROL DETAIL
TOP VIEW
FLOWING DITCH or BODY OD WATER
SLOPE
Secure bottom of fence
with gravel bags
Place straw mulch
on disturbed areaExcavated or
Augered Hole
Pole
SLOPE
Not to scale Adjacent to flowing ditches or bodies of water
Install silt fence around
pole excavation
permits.bosco@gmail.com
108103421Pole Removal
CONDUIT RISER PLACEMENT DETAIL
TOP VIEW
Not to Scale
Standoff Bracket
15" Min Length
Conduit Clamp Conduit
Field Face
Quadrant
Climbing
Space
Road Face
Quadrant
Climbing
Space
5" Min
CL LCDirection of Vehicular Traffic