Loading...
HomeMy WebLinkAboutP_Design_105086628_V1_171107NEW "16211" 15' 4' 12' 18' 72'116TH AVE SE116TH AVE SE 316981-166570 NEW 25KVA 120/240V JOB SITE 4' X 4' WORK PIT 4' X 4' WORK PIT 3/4 YARD OF SAND -CUSTOMER TO INSTALL 1-3" SCH'L 80 CONDUIT, 150' -PSE TO INSTALL 1 RUN OF 4/0 UG TPX, 185' JOB SITE SITE PLAN POWER GENERAL NOTES - RESIDENTIAL PROJECT N Vicinity Map N/A Owner / Developer Contact Info officeATTN: Poheng Siev 320 Lynnwood Ave SE Renton, WA 98056 Laura Gloudeman 206-817-2063 OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILESCALE: NONE ONE-LINE DIAGRAM ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE ROL-16 2017 205 191 213 -1.46 - 205 192.46 213 HP Svc/MSA Distribution New Pole Perm. Service Superior ORDER#NOTIF# PWR PROJECT PHASE 104297165505057169 101108466 CABLE TV PHONE GAS FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. 10. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Inclement weather conditions may cause delays in construction times and dates. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 8. 9. E-Mail: Cell Phone: Project Manager Contact Information: Manager:RUSSELL PAGE 253-245-0192 RUSSELL.PAGE@PSE.COM PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: P01 316998-166567 25KVA 120/240V 6211250 SCALE: 1" = 50'105086628THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) Service Stubs 105086628 UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP RUSSELL PAGE 253-245-0192 10/16/17 RUSSELL PAGE 253-245-0192 10/16/17 N/A N/A N/A TIN NGUYEN 253-244-4303 10/16/17 N/A RENTON SIEV POLE REPLACEMENT & TRF INST & UG SVC 16211 116TH AVE SE, RENTON WA 98058 N/A N/A N/A 105086628 AS NOTED 1/1 KING N/A N/A CSPSKEIN NW 28-23N-05E N/A N/A 2305E110 2305E136 2305E110 ROL-16 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 504873499 LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 3,133 SQ. 200 AMPS GAS 10 KW 115 A 1.3% 4.0% CIRCUIT FEET ADDED: 0' SITE SPECIFIC NOTES: P01 GRID# 316981-166570: -REMOVE EXISTING B/O 40' POLE -INSTALL NEW 45' CLASS 2 POLE W/ GNDS PER STD 6010.1000 (PD452) -INSTALL 4-POLE TOP PIN -INSTALL 1-8 PIN 11' CROSSARM PER STD 6033.3012 (TAP313) -TRANSFER EXISTING PRIMARY AND NEUTRAL WIRES -INSTALL 1-25KVA 120/240 OH TRF PER STD 6025.1000 (6211250) -INSTALL L/B C/O FUSE @ 10T & TAP BØ (3412200) -INSTALL STIRRUP BOLT -INSTALL 1-3" CONDUIT RISER W/ STD BRKT PER STD 6042.1000 (RIS3CSS) -COMMUNICATIONS TO TRANSFER -REMOVE EXISTING GRID# 316981-166570 -INSTALL NEW GRID# 316998-166567 M01: -INSTALL 200AMP METER SPAN SPECIFIC NOTES: P01 - M01: -CUSTOMER TO INSTALL 1-3" SCH'L 80 CONDUIT, ±150' -PSE TO INSTALL 1 RUN OF 4/0 UG TPX, ±185' CUSTOMER DEVELOPMENT NOTES CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS.#6750.6500 **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** -CUSTOMER IS REQUIRED TO PROVIDE A 4' X 4' WORK PIT AT P01. -CUSTOMER IS REQUIRED TO PROVIDE MINIMUM OF 1 CUBIC YARD OF 5/8" CRUSHED ROCK AT P01. -CUSTOMER IS REQUIRED TO PROVIDE A 4' X 4' WORK PIT AND 3/4 YARD OF SAND AT M01. -CUSTOMER IS REQUIRED TO EXCAVATE & INSTALL “ OF 1-3" DISCONTINUOUS SCH'L 80 GRAY PVC CONDUIT FROM P01-M01. -CUSTOMER IS REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL CONDUITS. -CUSTOMER IS RESPONSIBLE FOR ALL TREE TRIMMING AND BRUSH CLEARING. -CUSTOMER MUST HAVE A COPY OF PSE PROVIDED PERMIT ON SITE DURING ANY DIGGING IN RIGHT OF WAY. -CUSTOMER IS REQUIRED TO HAVE EXCAVATION EQUIPMENT ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING. ALL TRENCHING WILL REQUIRE AN INSPECTION BY PSE BEFORE FINAL BACKFILL ALL TRENCHES AND L&I INSPECTION MUST BE COMPLETED 5 BUSINESS DAYS BEFORE CONSTRUCTION POLE RETIREMENT TABLE TEMP TRANSFERS ST. LIGHT TRANSFERS SITE # POLE DATA POLE TEL TV FIBER TRAN RMVD ID NUMBER GRID #HEIGHT CLASS YEAR M RMVD P01 316981-166570 40 UNK 1959 TV & TEL Electric Service Cable in Conduit 3" Schedule 80 Grey PVC Excavated Dirt Pile Final Grade 24" Min 24" Min to 36" Max Cover Separation 12" Min 20" Min JOINT TRENCH DETAIL Electric Service Cable in Conduit (NTS) To Excavated Dirt Pile 36" MINIMUM COVER IN RIGHT OF WAY Backfill for Conduit Free of rocks larger than 8" in diameter) Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter. POLE TABLE (NEW) Site # Pole Data Grid #Height Class Year Remarks / Location Ref. P01 316998-166567 45 2 2017 PSE Equip # FLOW DIRECTION LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS (MID 9995692). 6' 3' 8" TECHNIQUES FOR EROSION AND SEDIMENT CONTROL FILTER FENCE DETAIL Not to Scale 0150.3200 UTILITY POLE EROSION CONTROL DETAIL TOP VIEW FLOWING DITCH or BODY OD WATER SLOPE Secure bottom of fence with gravel bags Place straw mulch on disturbed areaExcavated or Augered Hole Pole SLOPE Not to scale Adjacent to flowing ditches or bodies of water Install silt fence around pole excavation permits.bosco@gmail.com 108103421Pole Removal CONDUIT RISER PLACEMENT DETAIL TOP VIEW Not to Scale Standoff Bracket 15" Min Length Conduit Clamp Conduit Field Face Quadrant Climbing Space Road Face Quadrant Climbing Space 5" Min CL LCDirection of Vehicular Traffic