Loading...
HomeMy WebLinkAboutMFP17005350DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP17005350 IVR Number: 17005350 Permit Informaton Permit Name: Puget Sound Energy - Electric Address/Locaton:11/09/2017Applicaton Date:3342101411Parcel Number: 1118 N 30TH ST Permit Type:12/27/2017Issue Date:Franchise Permit Work Class:12/27/2018Expiraton Date:Minor Utlity Job Number: 105086408Franchise Type:Electric Descripton: OVERHEAD APPROVED WITH CONDITIONS: 1. Any trafc control plan requires separate approval. 2. Any abandoned or unused electrical wire would need to be removed at the tme that constructon is taking place. 3. Any existng height violatons must be resolved at the tme of constructon. New aerial wires must have a minimum vertcal clearance of 15' 6". 4. The aerial wires will be required to be installed underground in the future when other utlites are placed underground. Upgrade O/H transformer, install secondary O/H to underground line extension and new underground service. Restoraton per City of Renton standards. Contacts Name Address PhoneTypeBilling ANISH KUMAR PUGET SOUND ENERGY - ELECTRIC - BILLING 6905 S 228th St Kent, WA 98032 B: (253) 208-2183Applicant Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: BL.005109Electrical Contractor: POTELI*344O4 Constructon Contractor: POTELI*227PL CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner ANISH KUMAR PUGET SOUND ENERGY - ELECTRIC - BILLING 6905 S 228th St Kent, WA 98032 B: (253) 208-2183Specialized Billing X General Conditons & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements . Ÿ Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way . Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 | Published: 3/30/2017 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 3/30/2017 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street ☐ Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Puget Sound Energy - Electric 105086408 Anish Kumar 253-208-2183 anish.kumar@pse.com 1118 N 30th St 98056 One at a time occupying E & W bound shoulders of N 30th St for crew to upgrade overhead transformer, install secondary overhead to underground line extension and new underground service. Pavement cuts anticipated, restoration per City of Renton standards. 52'x2'x3' Potelco Inc.253-208-2183 BL005109 Poteli*227PL 10/5/2017 MFP17005350 Scott Warlick 11/13/2017 Justin Johnson 11-27-2017 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: • Comply with all traffic regulations of the City of Renton and the State of Washington. • Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. • Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. • Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. • Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. • The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. • In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. • Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. • By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: Reset FormPrint Form Andy Wnek - 105086408 PSE/Potelco Inc. Dave Goodale 425-495-7049 6905 S 228th St, Kent, WA 98032 dave.goodale@pse.com 1118 N 30th St TBD 10/18/2017 Anish Kumar 10/5/2017 MFP17005350 Justin Johnson 11-27-2017 9:00 am to 3:00 pm Monday through Friday SKETCH I -- NORTH -- I NOTES: • Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. • The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. • Approved Temporary Traffic Control Plan must be at the work site during work hours. • Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. • Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. • Total road closure lasting more than 24 hours is subject to the approval by the City Council. • Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: • Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. • Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. • The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. • Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). STOP FLAGGER BE PREPARED TO STOP W3-4100'100'ROADWORKAHEADW20-1W20-7A1118MATCHLINE SEE BELOW 100'ROADWORKAHEADW20-1 ROAD WORK AHEAD W20-1100'100'PARK AVE N N 30TH STP02RESIDENT(S) WILL BEINFORMED OF POSSIBLETEMPORARY DRIVEWAYCLOSURE1212 22341111STOPFLAGGERBEPREPAREDTOSTOPW3-4100' 100'100'ROADWORKAHEADW20-1W20-7AMATCHLINE SEE ABOVEN 30TH STP011212Job#1050864081118 N 30TH ST, RENTON, WASeptember 29, 2017Sheet 1 of 2 gregory.harwood@pse.com(425) 424-6425NPSEPUGETSOUNDENERGYTRAFFIC MANAGEMENT, INC.www.trafficmanagement.comC31 # 785804800.763.3999Traffic Control Services - Sales & RentalsPermits & Consulting - Engineering - TrainingPLAN PREPARED BY:DATE: 9/29/2017 - JEPLAN ORDER: 30217TMI CONTACT PERSON: Michael FlanaganTCS CERT #: 301872CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040MINIMUM TAPER LENGTH = L (feet)LANEWIDTHSPOSTED SPEED LIMITS20 25 30 35 40 4510111255 +60/6545/5535/403025SIGN SPACING"X"800500'350'200'100'Notes:1. All signs and spacing to conform to the MUTCD and City of RENTONstandards.2. All sidewalks, driveways, exits and egresses shall be completely clearunless otherwise indicated.3. Channelizing devices are 28" traffic cones.4. Sign size can be a minimum of 48" x 48" and shall not obstruct pedestrianaccess.5. Crew is required to leave a minimum of 11' for traveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.m.8. Work area will be WEST of of PARK AVE N on the NORTH SIDE of of N30TH ST.28" TRAFFIC CONELEGENDTRAFFIC FLOWWORK VEHICLESIGN LOCATIONWARNING FLAGFLAGGERSTOPPOLETRENCHMFP17005350 STOP FLAGGERSTOPFLAGGER BE PREPARED TO STOP W3-4100'100'100'ROADWORKAHEADW20-1W20-7ABEPREPAREDTOSTOPW3-4100' 100'100'ROADWORKAHEADW20-1W20-7A1118PARK AVE N N 30TH ST1212 22341111100'ROADWORKAHEADW20-1 ROAD WORK AHEAD W20-1100'Job#1050864081118 N 30TH ST, RENTON, WASeptember 29, 2017Sheet 2 of 2 gregory.harwood@pse.com(425) 424-6425NPSEPUGETSOUNDENERGYTRAFFIC MANAGEMENT, INC.www.trafficmanagement.comC31 # 785804800.763.3999Traffic Control Services - Sales & RentalsPermits & Consulting - Engineering - TrainingPLAN PREPARED BY:DATE: 9/29/2017 - JEPLAN ORDER: 30217TMI CONTACT PERSON: Michael FlanaganTCS CERT #: 301872CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040MINIMUM TAPER LENGTH = L (feet)LANEWIDTHSPOSTED SPEED LIMITS20 25 30 35 40 4510111255 +60/6545/5535/403025SIGN SPACING"X"800500'350'200'100'Notes:1. All signs and spacing to conform to the MUTCD and City of RENTONstandards.2. All sidewalks, driveways, exits and egresses shall be completely clearunless otherwise indicated.3. Channelizing devices are 28" traffic cones.4. Sign size can be a minimum of 48" x 48" and shall not obstruct pedestrianaccess.5. Crew is required to leave a minimum of 11' for traveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.m.8. Work area will be WEST of of PARK AVE N on the NORTH SIDE of of N30TH ST.28" TRAFFIC CONELEGENDTRAFFIC FLOWWORK VEHICLESIGN LOCATIONWARNING FLAGFLAGGERSTOPPOLETRENCH 2121 12 1111BUSSTOP1111N 30th StN 30th StPark Ave N Park Ave N 14 ONE LANE ROAD AHEAD W20-4100'100'100'ROAD WORK AHEAD W20-1W20-7ABEPREPAREDTOSTOPW3-4100'100'100'ROADWORKAHEADW20-1W20-7ABEPREPAREDTOSTOPW3-4 100'100'100'ROADWORKAHEADW20-1 W20-7A P01P02STOPFLAGG ERSTOPFLAGGERR9-9SIDEWALKCLOSEDR9-9SIDEWALK CLOSED DETOURM4-9bONE LANEROADAHEADW20-4100'100'100'ROADWORKAHEADW20-1W20-7AR9-11SIDEWALKCLOSEDAHEADFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-P AR KNO PARK SIGNAGE WILL BEPLACED ON ALL STREETS TOSURROUND WORK ZONEOH WIRE WORK BETWEEN POLE 1 & 2DRIVEWAYS TO BE CLOSED DURING WIRECONSTRUCTIONFLAGGERS WILL ASSIST PEDESTRIANS WITHSIDEWALK CLOSURE#1118FUTUREHOMENCHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Job#1050864081118 N 30th ST, Renton WAOctober 3, 2017Sheet 1 of 2 ryan.honeysett@pse.com(425)457-5381PSEPUGETSOUNDENERGYNotes:1. All signs and spacing to conform to the MUTCDand City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.4. Sign size can be a minimum of 48" x 48" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.m.28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPPOLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYPuget Sound EnergyTraffic Control Supervisor:Ryan HoneysettCard No. 010760Card Exp. 06/30/2021ryan.honeysett@pse.com(425)457-5381MFP17005350 2121 12 1111BUSSTOP1111N 30th StN 30th StPark Ave N Park Ave N 14 BEPREPAREDTOSTOPW3-4 100'100'ROADWORKAHEADW20-1 ONE LANE ROAD AHEAD W20-4100'100'100'ROAD WORK AHEAD W20-1W20-7ABEPREPAREDTOSTOPW3-4100'100'ROADWORKAHEADW20-1STOPFLAGG E RSTOPFLAGGER R9-9SIDEWALKCLOSEDR9-9SIDEWALKCLOSED DETOUR M4-9bONE LANEROADAHEADW20-4100'100'100'ROADWORKAHEADW20-1W20-7AR9-11SIDEWALKCLOSEDAHEADFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKNO PARK SIGNAGE WILL BEPLACED ON ALL STREETS TOSURROUND WORK ZONE#1118FUTUREHOMEHH1RESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSUREFLAGGERS WILL ASSIST PEDESTRIANS WITHSIDEWALK CLOSURENCHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Job#1050864081118 N 30th ST, Renton WAOctober 3, 2017Sheet 2 of 2 ryan.honeysett@pse.com(425)457-5381PSEPUGETSOUNDENERGYNotes:1. All signs and spacing to conform to the MUTCDand City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.4. Sign size can be a minimum of 48" x 48" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.m.28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPPOLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYPuget Sound EnergyTraffic Control Supervisor:Ryan HoneysettCard No. 010760Card Exp. 06/30/2021ryan.honeysett@pse.com(425)457-5381 1118 ABC319229-166186 X9531 319229-166201 50kVA 120/240V 75kVA 120/240DWFuture House DWProject Location New Riser Customer-Supplied 4' x 4' Work Pit Customer-Supplied 5'-6" x 4'-5" x 20" Deep Work Pit Customer-Supplied 3/4 Yard Sand Customer-Supplied 4' x 4' Work Pit 350 UG Tpx, ±50', in Customer-Supplied 3" Sch-40 Conduit, ±30' 2 Runs of 350 UG Tpx, ±100', in Customer-Supplied 4" Sch-80 Conduit, ±60'4/0 OH Tpx, ±155' SITE PLAN N Vicinity Map Owner / Developer Contact Info officeATTN: Aleksandra Wnek 1118 N 30th Street Renton WA 98056 Andy Wnek 425-351-8410 105086408THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) HP Svc/MSA HP Main Distribution Perm. Service OH Misc. Remove OH Trans. Superior ORDER#NOTIF# PWR PROJECT PHASE N/AN/A N/AN/A N/AN/A 101107668504958343 593188037 583057833 105086408503969742 CABLE TV PHONE GAS FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP Dave Goodale 425-495-7049 9/26/17 Leslie Regier 253-395-6928 9/26/17 N/A N/A N/A Leslie Regier 253-395-6928 9/26/17 Required City of Renton Andy Wnek Upgrade OH Transformer, Secondary OH-UG Line Ext., UG Service 1118 N 30th Street, Renton WA 98056 PSE N/A N/A N/A 105086408 As Noted 1 of 1 King N/A N/A CSPSKEIN T24N, R05E, Sec 32 SW N/A N/A 2405E127 2405E136 2405E127 HIG-15 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A E-Mail: Cell Phone: Project Manager Contact Information: Manager:Dave Goodale 425-495-7049 dave.goodale@pse.com POWER GENERAL NOTES ‒ RESIDENTIAL PROJECT 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foreman's copy. 2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. 3.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. 4.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. 5.SITE PREPARATION: The work area will be at or near finished grade and clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. 6.Roads shall be paved or have a compacted, crushed rock base in place. 7.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm, and sewer lines when paralleling them in the right of way and at least 1 foot when crossing them. 8.All work is to be done in accordance with local municipal and county permit requirements as applicable. 9.Inclement weather conditions may cause delays in construction times and dates. 10.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" SCALE: 1" = 50' SITE SPECIFIC NOTES P01 (319229-166201) - REMOVE EXISTING 50KVA 120/240V OH TRANSFORMER -INSTALL NEW 75KVA 120/240V OH TRANSFORMER AND TAP ØB -INSTALL 1 - RIGID CLEVIS P02 (319229-166186) -INSTALL 1 - RIGID CLEVIS - INSTALL 1 - 4" RISER ON S/O BRACKETS HH1 - INSTALL 17X30 F/G HANDHOLE - INSTALL 3 - 6-POS SECONDARY CONNECTORS SPAN NOTES P01-P02 -INSTALL 4/0 OH TPX, ±155' P02 - HH1 - CUSTOMER INSTALL 4" SCH-80 GREY PVC CONDUIT W/ 3/8" MIN PULL ROPE, ±60' -INSTALL 2 RUNS OF 350 UG TPX, ±100' HH1 - M01 -CUSTOMER INSTALL 3" SCH-40 GREY PVC CONDUIT W/ 3/8" MIN PULL ROPE, ±30' -INSTALL 350 UG TPX IN CUSTOMER-PROVIDED CONDUIT, ±50' ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE HIG-15 6/13/17 347 78 161 -2.63 - 347 80.63 161 OVERHEAD CIRCUIT MAP ‒ 2405E136 SCALE: 6" = 1 MILE 32" Typical 24" Min 24"-36" 24"-36" 4'Top View Electric & Joint Utility Work Pit Dimensions 36" Min Drainage Pipe 12" Minimum Clearance from Gas Service Lines Conduit Depth 24" to 36" Max Regulator Vent Gas Meter Assembly Utility Provided 48" 4'8" Service (Permanent Detail:) Not to Scale Seal Conduit Ends Closed 4'8" 24" Min 36" Typical 3' To Trench Property Line Conduit Stakes Customer Provided 3" Schedule 40 Grey PVC Power Cable Conduit Customer Provided Gas Service Line Conduit Sch 40 White PVC Customer Provided 3" Conduit Service Riser Customer Provided Elec. Mtr Base Elec Mtr utility provided Gas Meter Relief Vent Building Wall Elec. Mtr SCALE: NONE METER DETAIL @ M01 Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P01 319229-166201 50 Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: P01 319229-166201 75 6211400 LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 3,500 SQ. FT. 200 AMPS GAS 9 KW 115 AMPS 3.7% 2.9% CIRCUIT FEET ADDED: 0 SECONDARY ONE-LINE DIAGRAM SCALE: NONE CUSTOMER-SUPPLIED SERVICE TRENCH TV & TEL Electric Service Cable in Conduit 3" Schedule 80 Grey PVC in ROW Final Grade 24" Min 24" Min to 36" Max Cover Separation 12" Min 20" Min JOINT TRENCH DETAIL Electric Service Cable in Conduit (NTS) To Excavated Dirt Pile 36" MINIMUM COVER IN RIGHT OF WAY Backfill for Conduit Free of rocks larger than 8" in diameter) Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter. Excavated Dirt Pile Customer's service conductors Captive L-Bolt 27-1/4" 2" 18" Captive L-Bolt Lock Cover, 10 lbs 40-1/2" Conductors enter from beneath and shall be folded back with handhole SIDE VIEW Lock Cover 30" Approx Approx 17" Set handhole flush to final grade SINGLE PHASE SECONDARY HANDHOLE Not to scale 6050.2000 3" Schedule 40 Grey PVC in Private Property Project Location MFP17005350 MFP17005350 DenisLawMayorCommunity&EconomicDevelopmentC.E.“Chip”Vincent,AdministratorDecember22,2017PugetSoundEnergyattn:DaveGoodaleProjectManagerP.O.Box98009-9734Bellevue,WA98009-9734VIAEmail:david.goodale@pse.comSUBJECT:RequestforUndergroundExemption,1118N30thSt(MFP1700S3SO)DearMr.Goodale:TheCityofRentonhasreviewedyourrequestinordertopermitPotelcotoupgradeanexistingoverheadtransformeronanexistingPugetSoundEnergy(PSE)pole.One(1)spanofsecondaryoverheadwirewouldalsobereplacedwithalargersizeofsecondaryoverheadwire(P01toP02asreferencedondrawingssubmitted).Ariserwouldbeinstalledonthesecondpole(P02)andthentheelectricalservicewouldgoundergroundacrossthestreettothecustomer’spropertyandplacingafiberglasshandhole(RH1onthedesign).Eachservicewillbeconnectedtothehandholeandwouldbeanundergroundservice.ANALYSIS:TheCityhasconsideredtherequestforanexemptionfromRMC4-6-090(D)(1)(g)iandii.Ordinance5834grantsPugetSoundEnergy,therighttoconstruct,operate,set,erect,support,attach,connect,maintain,repair,replace,enlargeandusefacilitiesforpurposesoftransmission,distributionandsaleofelectricalenergyandgas,in,upon,over,under,along,acrossandthroughthefranchisearea.Therefore,theCityisgrantinganexemptionwithconditions,perRMC4-6-090(D)(1)(g)iandiiwhichallowsforextensionsofexistingoverheadelectricalandcommunicationfacilitieswhentherearecontinuingrequirementsforpolesanditisnotlikelythattherewillbeundergroundingintheforeseeablefuture;and,whenthereareexistingoverheadelectricalorcommunicationfacilitiesthatwillnotberemovedandthefacilitiesthatwouldhavebeenrequiredtoberemovedareparalleltothefacilitiesthatwillnotberemoved.1055SouthGradyWay,Renton,wA98057.rentonwa.qov DaveGoodalePage2of2December22,2017DECISION:Therequestedexemptionfromundergroundutilityinstallationrequirements(RMC4-6-090(C)asrequestedbytheapplicantisapprovedsubjecttotheconditionsbelowastherequestcomplieswithexemptioncriteriaofRMC4-6-090(D)(1)(g)iandH.ConditionsofApproval:1.Thetrafficcontrolplanrequiresseparateapproval.2.Anyabandonedorunusedelectricalwirewouldneedtoberemovedatthetimethatconstructionistakingplace.3.Anyexistingheightviolationsmustberesolvedatthetimeofconstruction.Newaerialwiresmusthaveaminimumverticalclearanceof15’-6”.4.Theaerialwireswillberequiredtobeinstalledundergroundinthefuturewhenotherutilitiesareplacedunderground.Thisdecisiontogranttheexemptionwithconditionsissubjecttoafourteen(14)dayappealperiodfromthedateofthisletterperRMC4-8-110.AnyappealsoftheadministrativedecisionmustbefiledwiththeCityClerk,alongwiththerequiredappealfee,by5:00pm,January5,2018.DECISION:TheproposaltoupgradeanexistingoverheadtransformeronanexistingPugetSoundEnergy(PSE)pole;replaceonespanofsecondaryoverheadwirewithalargersizeofsecondaryoverheadwire,andinstallariserisexemptperRMC4-4-140E.1.Aright-of-wayusepermitmaybeneededandapprovalofthetrafficcontrolplanisstillneededfromtheCity.PleasecoordinatewithHollyPowers.Shecanbereachedviaemailathpowers@rentonwa.govorviaphoneat:425-430-7266.Sincerely,JenniferT.Henning,AICPPlanningDirectorcc:Chipvincent,cEDAdministratorGreggZimmerman,PWAdministratorcraigBurnell,BuildingOfficialBrianneBannwarth,DevelopmentEngineeringManagerJustinJohnson,EngineeringSpecialistvanessaDolbee,CurrentPlanningManagerAmandaAskren,PlanningandTechnicalServicesManagerHollyPowers,DevelopmentServicesRepresentativeScottwarlick,EngineeringSpecialistPatMiller,constructionInspectionSupervisor1055SouthGradyWay,Renton,WA98057rentonwa.gov