Loading...
HomeMy WebLinkAboutP_Design_105086408_V1_1710051118 ABC319229-166186 X9531 319229-166201 50kVA 120/240V 75kVA 120/240DWFuture House DWProject Location New Riser Customer-Supplied 4' x 4' Work Pit Customer-Supplied 5'-6" x 4'-5" x 20" Deep Work Pit Customer-Supplied 3/4 Yard Sand Customer-Supplied 4' x 4' Work Pit 350 UG Tpx, ±50', in Customer-Supplied 3" Sch-40 Conduit, ±30' 2 Runs of 350 UG Tpx, ±100', in Customer-Supplied 4" Sch-80 Conduit, ±60'4/0 OH Tpx, ±155' SITE PLAN N Vicinity Map Owner / Developer Contact Info officeATTN: Aleksandra Wnek 1118 N 30th Street Renton WA 98056 Andy Wnek 425-351-8410 105086408THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) HP Svc/MSA HP Main Distribution Perm. Service OH Misc. Remove OH Trans. Superior ORDER#NOTIF# PWR PROJECT PHASE N/AN/A N/AN/A N/AN/A 101107668504958343 593188037 583057833 105086408503969742 CABLE TV PHONE GAS FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP Dave Goodale 425-495-7049 9/26/17 Leslie Regier 253-395-6928 9/26/17 N/A N/A N/A Leslie Regier 253-395-6928 9/26/17 Required City of Renton Andy Wnek Upgrade OH Transformer, Secondary OH-UG Line Ext., UG Service 1118 N 30th Street, Renton WA 98056 PSE N/A N/A N/A 105086408 As Noted 1 of 1 King N/A N/A CSPSKEIN T24N, R05E, Sec 32 SW N/A N/A 2405E127 2405E136 2405E127 HIG-15 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A E-Mail: Cell Phone: Project Manager Contact Information: Manager:Dave Goodale 425-495-7049 dave.goodale@pse.com POWER GENERAL NOTES ‒ RESIDENTIAL PROJECT 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foreman's copy. 2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. 3.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. 4.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. 5.SITE PREPARATION: The work area will be at or near finished grade and clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. 6.Roads shall be paved or have a compacted, crushed rock base in place. 7.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm, and sewer lines when paralleling them in the right of way and at least 1 foot when crossing them. 8.All work is to be done in accordance with local municipal and county permit requirements as applicable. 9.Inclement weather conditions may cause delays in construction times and dates. 10.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" SCALE: 1" = 50' SITE SPECIFIC NOTES P01 (319229-166201) - REMOVE EXISTING 50KVA 120/240V OH TRANSFORMER -INSTALL NEW 75KVA 120/240V OH TRANSFORMER AND TAP ØB -INSTALL 1 - RIGID CLEVIS P02 (319229-166186) -INSTALL 1 - RIGID CLEVIS - INSTALL 1 - 4" RISER ON S/O BRACKETS HH1 - INSTALL 17X30 F/G HANDHOLE - INSTALL 3 - 6-POS SECONDARY CONNECTORS SPAN NOTES P01-P02 -INSTALL 4/0 OH TPX, ±155' P02 - HH1 - CUSTOMER INSTALL 4" SCH-80 GREY PVC CONDUIT W/ 3/8" MIN PULL ROPE, ±60' -INSTALL 2 RUNS OF 350 UG TPX, ±100' HH1 - M01 -CUSTOMER INSTALL 3" SCH-40 GREY PVC CONDUIT W/ 3/8" MIN PULL ROPE, ±30' -INSTALL 350 UG TPX IN CUSTOMER-PROVIDED CONDUIT, ±50' ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE HIG-15 6/13/17 347 78 161 -2.63 - 347 80.63 161 OVERHEAD CIRCUIT MAP ‒ 2405E136 SCALE: 6" = 1 MILE 32" Typical 24" Min 24"-36" 24"-36" 4'Top View Electric & Joint Utility Work Pit Dimensions 36" Min Drainage Pipe 12" Minimum Clearance from Gas Service Lines Conduit Depth 24" to 36" Max Regulator Vent Gas Meter Assembly Utility Provided 48" 4'8" Service (Permanent Detail:) Not to Scale Seal Conduit Ends Closed 4'8" 24" Min 36" Typical 3' To Trench Property Line Conduit Stakes Customer Provided 3" Schedule 40 Grey PVC Power Cable Conduit Customer Provided Gas Service Line Conduit Sch 40 White PVC Customer Provided 3" Conduit Service Riser Customer Provided Elec. Mtr Base Elec Mtr utility provided Gas Meter Relief Vent Building Wall Elec. Mtr SCALE: NONE METER DETAIL @ M01 Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P01 319229-166201 50 Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: P01 319229-166201 75 6211400 LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 3,500 SQ. FT. 200 AMPS GAS 9 KW 115 AMPS 3.7% 2.9% CIRCUIT FEET ADDED: 0 SECONDARY ONE-LINE DIAGRAM SCALE: NONE CUSTOMER-SUPPLIED SERVICE TRENCH TV & TEL Electric Service Cable in Conduit 3" Schedule 80 Grey PVC in ROW Final Grade 24" Min 24" Min to 36" Max Cover Separation 12" Min 20" Min JOINT TRENCH DETAIL Electric Service Cable in Conduit (NTS) To Excavated Dirt Pile 36" MINIMUM COVER IN RIGHT OF WAY Backfill for Conduit Free of rocks larger than 8" in diameter) Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter. Excavated Dirt Pile Customer's service conductors Captive L-Bolt 27-1/4" 2" 18" Captive L-Bolt Lock Cover, 10 lbs 40-1/2" Conductors enter from beneath and shall be folded back with handhole SIDE VIEW Lock Cover 30" Approx Approx 17" Set handhole flush to final grade SINGLE PHASE SECONDARY HANDHOLE Not to scale 6050.2000 3" Schedule 40 Grey PVC in Private Property Project Location