Loading...
HomeMy WebLinkAboutP_Design_101108755_V1_171115SW 41ST ST AØAGH991 BØAGH992 CØAGH993 316514-165632 316514-165630 316501-165628 316501-165629 AØACE531 BØACE532 CØACE533316500-165631 316514-165632 316514-165630 316500-165631 316501-165628 SW 41ST ST SL1018301LIND AVE SWJOB SITE SW 41ST ST AØAGH991 BØAGH992 CØAGH993 316514-165632 316514-165630 316501-165628 316501-165629 AØACE531 BØACE532 CØACE533316500-165631 NEW AØEHU300 NEW BØEHU301 NEW CØEHU302 NEW AØEHU303 NEW BØEHU304 NEW CØEHU305 NEW AØEHU306 NEW BØEHU307 NEW CØEHU308 UNDERGROUND CONSTRUCTION Excavation -Trenching outside of the Right-of-way shall be of sufficient depth to provide a minimum of 36” of cover for primary conductors and 24” of cover for secondary conductors. -Road crossings and all trenches within the Right-of-way shall be of sufficient depth to provide a minimum of 36” of cover for all conductors or as required by the permitting Agency. -All conductors/conduits shall have a minimum of 3” of bed and 3” of clean sand cover. -No rocks larger than 6” shall be included in backfill. -Backfill in road crossings and within the Right-of-way shall be compacted to 95% density or as required by the permitting Agency. -Restore all excavated areas to original condition. - If four or more six inch conduits are installed in a trench, fluidized thermal backfill (FTB) shall be installed around the conduits to a depth of six inches above and to the sides of the conduit, and two inches underneath, per PSE Standard 6790.0140. Vaults & Handholes - Refer to PSE standard 6775.0040 “Vault and Handhole Installation” - Vaults shall be placed level and 2” above final grade in landscaped areas and flush with final grade when placed in hard surface areas. - A minimum 6” bed of 5/8” crushed rock shall be placed under all vaults. - All conduit entrances shall be grouted. Conductors & Conduit - Refer to PSE standard 6800.6000 “PVC Conduit Installation”. - Unless splices are called for, or otherwise noted or approved, conduit risers shall be plumbed directly to road crossing conduits. - Install insulating caps on all unused primary bushings. - All “spare” conduits shall be capped at each end. 10-31-17 PER LUKE NEELY CELL 253-569-2523: NOTE: RENTON PERMIT & 2 FLAGGERS REQ'D, CORE HOURS, NO OUTAGE O#1113-8 PROBLEM: APH CABLE 26074 HAS PROBE STUCK IN THE JBUS AT GRID 316514-165632 AND MULTIPLE ELBOWS ARE SPLIT. FROM V01 AT GRID 316514-165632 TO V03 AT GRID 316500-165631: -REPLACE OLD CONC 3PH 1/0 CABLES 26074-75-76 -INSTALL NEW CABLE NUMBERS; EHU300, 01, 02 FROM V01 AT GRID 316514-165632 TO V02 AT GRID 316514-165630: -REPLACE OLD YJ 1/0 CABLES 41394-95-96 -INSTALL NEW CABLE NUMBERS; EHU303, 04, 05 FROM V03 AT GRID 316500-165631 TO V04 AT GRID 316501-165628: -REPLACE OLD 1/0 CABLES 33937-38-39 -INSTALL NEW CABLE NUMBERS; EHU306, 07, 08 AT V01 AT GRID 316514-165632: -REPLACE ANY JBUSES THAT LOOK BAD AT V03 AT GRID 316500-165631: -REPLACE ANY JBUSES THAT LOOK BAD AT V04 AT GRID 316501-165628: -REPLACE ANY JBUSES AND ANY OTHER ELBOWS THAT LOOK BAD GENERAL SPECIFICATIONS Scope of Work GAS PHONE CABLE TV N/A N/A N/A N/A N/A 108103589 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A PROJECT PHASE PWR NOTIF#ORDER# Superior Perm. Service Relocation Removal Temporary Job Order Distribution HP Main HP Svc/MSA THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773)101108755N Vicinity Map NOT TO SCALE FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Correct QC Checklist(s) reviewed. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP L. NEELY 253-569-2523 11/1/17 L. NEELY 253-569-2523 11/1/17 L. ORTIZ 714-893-2405 11/1/17 N/A RENTON VIC-17 616 SW 41st ST, RENTON REPLACE 3 SECTIONS OF B/O 3PH 1/0 CABLES 616 SW 41st ST. RENTON, WA 98057 ASPLUNDH CONSTRUCTION CORP. O-1113-8 101108755 AS NOTED 1/1 KING QCSOKE NW 31-23N-05E 2305E122 2305E124 VIC-172305E122 11343055 101108755 Owner / Developer Contact Info officeATTN: E-Mail: Cell Phone: Project Manager Contact Information: Manager:LUKE NEELY 253-569-2523 LUKE.NEELY@PSE.COM THOMAS GUIDE 656-A7 UNDERGROUND CIRCUIT MAP (BEFORE) SCALE: 1" = 50' MAP#: 2305E122 SITE MAP - UNIVERSAL MAP SCALE: 1" = 50' MAP#: 2305E122 ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE MAP#: 2305E124 PSE No No No Yes Yes Yes "Flagging Required" "Outages Required" "Locates Required" PRIMARY CABLE TABLE - INSTALL LOCATION CABLE ASBUILT INFORMATION - FOREMAN COMPLETE FROM TO QT Y. BENDS PULL (LBS) PULL REV (LBS) CABLE SIZE DESIGN LENGTH (FT) PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED 90°45°22°11°A B C MANUFACTURER COMPOUND YEAR NOTES CABLE V01 V03 3 1/0 170 EHU300 EHU301 EHU302 V01 V02 3 1/0 30 EHU303 EHU304 EHU305 V03 V04 3 1/0 50 EHU306 EHU307 EHU308 TOTAL 250 PRIMARY CABLE REMOVAL TABLE LOCATION PRIMARY CABLE ASBUILT INFORMATION Cable LENGTH Design (ft) Cable Numbers Please Record Foreman - Complete FROM TO Size A B C Manufacturer Year Actual Amount Installed (Conduit & Cable) V01 V03 1/0 170 26074 26075 26076 V01 V02 1/0 30 41394 41395 41396 V03 V04 1/0 50 33937 33938 33939 UNDERGROUND CIRCUIT MAP (AFTER) SCALE: 1" = 50' MAP#: 2305E122 Luke Neely Luke Neely 253-569-2523 253-569-2523 11/2/17 11/2/17