HomeMy WebLinkAboutP_Design_101108755_V1_171115SW 41ST ST
AØAGH991
BØAGH992
CØAGH993
316514-165632
316514-165630
316501-165628
316501-165629
AØACE531
BØACE532
CØACE533316500-165631
316514-165632
316514-165630
316500-165631
316501-165628
SW 41ST ST
SL1018301LIND AVE SWJOB SITE
SW 41ST ST
AØAGH991
BØAGH992
CØAGH993
316514-165632
316514-165630
316501-165628
316501-165629
AØACE531
BØACE532
CØACE533316500-165631
NEW AØEHU300
NEW BØEHU301
NEW CØEHU302
NEW AØEHU303
NEW BØEHU304
NEW CØEHU305
NEW AØEHU306
NEW BØEHU307
NEW CØEHU308
UNDERGROUND CONSTRUCTION
Excavation
-Trenching outside of the Right-of-way shall be of sufficient depth to provide a minimum of 36” of cover
for primary conductors and 24” of cover for secondary conductors.
-Road crossings and all trenches within the Right-of-way shall be of sufficient depth to provide a minimum
of 36” of cover for all conductors or as required by the permitting Agency.
-All conductors/conduits shall have a minimum of 3” of bed and 3” of clean sand cover.
-No rocks larger than 6” shall be included in backfill.
-Backfill in road crossings and within the Right-of-way shall be compacted to 95% density or as required
by the permitting Agency.
-Restore all excavated areas to original condition.
- If four or more six inch conduits are installed in a trench, fluidized thermal backfill (FTB) shall be
installed around the conduits to a depth of six inches above and to the sides of the conduit, and two
inches underneath, per PSE Standard 6790.0140.
Vaults & Handholes
- Refer to PSE standard 6775.0040 “Vault and Handhole Installation”
- Vaults shall be placed level and 2” above final grade in landscaped areas and flush with final grade when
placed in hard surface areas.
- A minimum 6” bed of 5/8” crushed rock shall be placed under all vaults.
- All conduit entrances shall be grouted.
Conductors & Conduit
- Refer to PSE standard 6800.6000 “PVC Conduit Installation”.
- Unless splices are called for, or otherwise noted or approved, conduit risers shall be plumbed directly to
road crossing conduits.
- Install insulating caps on all unused primary bushings.
- All “spare” conduits shall be capped at each end.
10-31-17 PER LUKE NEELY CELL 253-569-2523:
NOTE: RENTON PERMIT & 2 FLAGGERS REQ'D, CORE HOURS, NO OUTAGE
O#1113-8
PROBLEM: APH CABLE 26074 HAS PROBE STUCK IN THE JBUS AT GRID 316514-165632 AND
MULTIPLE ELBOWS ARE SPLIT.
FROM V01 AT GRID 316514-165632 TO V03 AT GRID 316500-165631:
-REPLACE OLD CONC 3PH 1/0 CABLES 26074-75-76
-INSTALL NEW CABLE NUMBERS; EHU300, 01, 02
FROM V01 AT GRID 316514-165632 TO V02 AT GRID 316514-165630:
-REPLACE OLD YJ 1/0 CABLES 41394-95-96
-INSTALL NEW CABLE NUMBERS; EHU303, 04, 05
FROM V03 AT GRID 316500-165631 TO V04 AT GRID 316501-165628:
-REPLACE OLD 1/0 CABLES 33937-38-39
-INSTALL NEW CABLE NUMBERS; EHU306, 07, 08
AT V01 AT GRID 316514-165632:
-REPLACE ANY JBUSES THAT LOOK BAD
AT V03 AT GRID 316500-165631:
-REPLACE ANY JBUSES THAT LOOK BAD
AT V04 AT GRID 316501-165628:
-REPLACE ANY JBUSES AND ANY OTHER ELBOWS THAT LOOK BAD
GENERAL SPECIFICATIONS
Scope of Work
GAS
PHONE
CABLE TV
N/A N/A
N/A N/A
N/A 108103589
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Perm. Service
Relocation
Removal
Temporary
Job Order
Distribution
HP Main
HP Svc/MSA
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)101108755N
Vicinity Map
NOT TO SCALE
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Correct QC Checklist(s) reviewed.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
L. NEELY 253-569-2523 11/1/17
L. NEELY 253-569-2523 11/1/17
L. ORTIZ 714-893-2405 11/1/17
N/A RENTON
VIC-17 616 SW 41st ST, RENTON
REPLACE 3 SECTIONS OF B/O 3PH 1/0 CABLES
616 SW 41st ST. RENTON, WA 98057
ASPLUNDH CONSTRUCTION CORP.
O-1113-8
101108755
AS NOTED 1/1
KING QCSOKE
NW 31-23N-05E
2305E122 2305E124 VIC-172305E122
11343055 101108755
Owner / Developer Contact Info
officeATTN:
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:LUKE NEELY
253-569-2523
LUKE.NEELY@PSE.COM
THOMAS GUIDE
656-A7
UNDERGROUND CIRCUIT MAP (BEFORE)
SCALE: 1" = 50' MAP#: 2305E122
SITE MAP - UNIVERSAL MAP
SCALE: 1" = 50' MAP#: 2305E122
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE MAP#: 2305E124
PSE
No
No
No
Yes
Yes
Yes
"Flagging Required"
"Outages Required"
"Locates Required"
PRIMARY CABLE TABLE - INSTALL
LOCATION CABLE ASBUILT INFORMATION - FOREMAN COMPLETE
FROM TO QT
Y.
BENDS
PULL
(LBS)
PULL
REV
(LBS)
CABLE
SIZE
DESIGN
LENGTH
(FT)
PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED
90°45°22°11°A B C MANUFACTURER COMPOUND YEAR NOTES CABLE
V01 V03 3 1/0 170 EHU300 EHU301 EHU302
V01 V02 3 1/0 30 EHU303 EHU304 EHU305
V03 V04 3 1/0 50 EHU306 EHU307 EHU308
TOTAL 250
PRIMARY CABLE REMOVAL TABLE
LOCATION PRIMARY CABLE
ASBUILT INFORMATION
Cable LENGTH
Design
(ft)
Cable Numbers Please Record Foreman - Complete
FROM TO Size A B C Manufacturer Year Actual Amount Installed (Conduit & Cable)
V01 V03 1/0 170 26074 26075 26076
V01 V02 1/0 30 41394 41395 41396
V03 V04 1/0 50 33937 33938 33939
UNDERGROUND CIRCUIT MAP (AFTER)
SCALE: 1" = 50' MAP#: 2305E122
Luke Neely
Luke Neely
253-569-2523
253-569-2523
11/2/17