Loading...
HomeMy WebLinkAboutP_Traffic_Control_Plan(TCP)_101109064_V1_17113013131818SE 165TH ST126TH AVE SESTOPFLAG GE RSTOPFLAGGERBEPREPAREDTOSTOPW3-4 100'X'100'ROADWORKAHEADW20-1 W20-7ABEPREPAREDTOSTOPW3-4100'100'ROADWORKAHEADW20-1ONE L A N E ROAD AHEA D W20-4100'100'100'ROAD WORK AHEA D W20-1W20-7A#12612FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PA RKNO PARK SIGNAGE WILL BEPLACED ON BOTH SIDES OF SE165TH ST TO SURROUND WORKZONE164TH PL SE1 2 6 T H P L S E X'X'PLACE W20-1 SIGNS ON ALLADJACENT STREETS WITHIN FEET OF WORK AREAROADWORKAHEADW20-1 ROADWORKAHEADW20-1300FLAGGERS WILL ASSISTPEDESTRIANSHH1HH2HH3CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGYJOB#10110906412612 SE 165th ST, King County WANovember 29, 2017ryan.honeysett@pse.com425-457-5381SHEET 1 OF 1Notes:1. All signs and spacing to conform to theMUTCD and King County standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwiseindicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.BORE PIT28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYPuget Sound EnergyTraffic Control Supervisor:Ryan HoneysettCard No. 010760Card Exp. 06/30/2021ryan.honeysett@pse.com(425)457-5381PRINT ON 11 X 17SHEETS ONLY