Loading...
HomeMy WebLinkAboutMFP17005724DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP17005724 IVR Number: 17005724 Permit Informa!on Permit Name:Puget Sound Energy - Electric Address/Loca!on:11/30/2017Applica!on Date:1742800450Parcel Number:411 SENECA CT NW Permit Type :12/14/2017Issue Date:Franchise Permit Work Class:12/14/2018Expira!on Date :Minor U&lity Job Number:101108843Franchise Type :Electric Descrip!on:Replace bad order pole and install transformer at PO 1. Install transformer at PO 2 and remove the open wire sec&on between PO1&PO2. No pavements cuts an&cipated . Restora&on per City of Renton standards . Contacts Name Address PhoneTypeBilling ANISH KUMAR PUGET SOUND ENERGY - ELECTRIC - BILLING 6905 S 228th St Kent, WA 98032 B: (253) 208-2183Applicant Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: BL.005109Electrical Contractor : POTELI*344O4 Construc!on Contractor : POTELI*227PL CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner ANISH KUMAR PUGET SOUND ENERGY - ELECTRIC - BILLING 6905 S 228th St Kent, WA 98032 B: (253) 208-2183Specialized Billing X General Condi!ons & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 | Published: 3/30/2017 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 3/30/2017 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street ☐ Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date MFP17005724 Scott Warlick 12/4/2017 Justin Johnson 12-14-2017 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: • Comply with all traffic regulations of the City of Renton and the State of Washington. • Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. • Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. • Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. • Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. • The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. • In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. • Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. • By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: Reset FormPrint Form MFP17005724 8:00 am to 3:00 pm Monday through Friday Justin Johnson 12-14-2017 SKETCH I -- NORTH -- I NOTES: • Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. • The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. • Approved Temporary Traffic Control Plan must be at the work site during work hours. • Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. • Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. • Total road closure lasting more than 24 hours is subject to the approval by the City Council. • Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: • Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. • Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. • The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. • Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). 15151515 151514 14 1111 STOP FLAGGER STOP FLAGGER BEPREPAREDTOSTOPW3-4100'100'100'ROADWORKAHEADW20-1W20-7ABEPREPAREDTOSTOPW3-4100'100'100'ROADWORKAHEADW20-1W20-7AP01 P02 FLAGGERS TO ASSIST LOCAL RESIDENTIAL ACCESS RESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE USE MAXIMUM AVAILABLE SPACE FOR SIGNS 411 SENECA CT NWSENECA AVE NWNW 4TH PLSTEVENS AVE NWFRO M TO TOW A W A Y A R E A PHO N E 8 8 8-9 99 9 INFRA S O U R C E LL C 00 0 00 0 0 0 00 NO PAR KI N G NO-PARK FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-P A R K FR O M T O T O W A W A Y A R E A PH O N E 8 8 8 - 9 9 9 9 INF R A S O U R C E L L C 0 0 0 0 0 0 0 0 0 0 N O P A R K I N G NO-PAR KFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKCHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Job#101108843 411 Seneca Ct NW, Renton, WA November 14, 2017 Sheet 1 of 1 brent.pogson@pse.com (425)398-6158 N PSE PUGET SOUND ENERGY BORE PIT 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 008997 Card Exp. 08/13/2019 gregory.harwood@pse.com (425)424-6425 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. 4. Sign size can be a minimum of 48" x 48" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m. MFP17005724 318141-165633 50kVA 120/240v 37.5kVA 120/240v 405 318154-165642 37.5kVA 120/240v SENECA CT NWJOB SITE General -All work is to be completed per PSE Standards & Practices. Copies of all PSE Standards are available upon request. -Work sites shall be kept clear of debris and all construction materials; equipment and packing shall be removed daily. -Return all unused and removed poles, transformers and hardware to PSE, storeroom. All copper shall be coiled and returned the day it is removed from the poles. Remove all unused pins and insulators. -Return all streetlights, area lights and floodlights to Sumner yard. Preconstruction - Notify appropriate city, County or DOT authorities 48 to 72 hours, or as required by permitting agency, in advance of starting work in Right-of-way involving a Permit. - All system switching shall be approved by System Operations (425-882-4652) a minimum of 48 hours in advance. - Notify customers of all outages 48 hours in advance. Work Drawings & Documents - Field design changes shall be approved by PSE Project Manager or Engineer. - Mark all field changes, equipment ID numbers and Underground cable information in red on Foreman's copy of worksketch. - Return one Foreman's copy of worksketch to Project Manager at completion of job. - When permits are required, a copy shall be available on work site at all times. Safety - Refer to PSE standards 6275.3000 and 6275.6000 for system ground requirements. - Refer to PSE standards 6275.9050 for personal protective grounding requirements. - Refer to PSE standards 6275.9150 for vehicle grounding and barricading requirements. - Proper line clearances shall be taken at the beginning, and released at the end, of each work day, or as otherwise instructed by the System Operator. - Provide signs, barricades, and traffic control in conformance with permit regulations. - Utilize flagging and other vehicle traffic control as necessary and in conformance with local traffic regulations. - Maintain traffic flow as required by permitting agency. Erosion & Sediment Control - Refer to PSE standards 0150.3200 for minimum requirements. - Comply with all requirements of permitting agency. - Installed erosion & sediment devices shall be maintained until vegetation has been re-established or disturbed soil has been otherwise permanently stabilized. Joint Facilities - Coordinate with Communication Companies for transfers. 11-03-17 PER LUKE NEELY CELL 253-569-2523: NOTE: RENTON PERMIT & 2 FLAGGERS REQ'D, CORE HOURS, LOCATES, OUTAGE ON 7 RESIDENTIAL CUSTOMERS O#387434-1 PROBLEM: SERVICEMAN STATED POLE HAS SPLIT AT THE TOP AND NEEDS TO BE REPLACED. AT P01 AT GRID 318141-165633: -REPLACE OLD 40' CL 5 POLE WITH A NEW 40' CL 1 POLE & GND PL -INST NEW 3/8" PRI & COM NEUT DOWN GUYS TO EXIST ANCH L = 7' WEST -INST 1PH DE EAST PER STD 6031.1040 FIG 1 DE0115 -TRANSF 1PH #4ACSR PRIMARY EAST -INST R/C FOR COM NEUT EAST -TRANSF THE NEUT ONLY OF THE OPEN-WIRE-SEC & REMOVE THE OPEN-WIRE-SEC ONE SPAN EAST 158 FEET -INST NEW 37.5KVA XFMR & LBC/O -TRANSF 2 OH SVCS, 3" RISER ON SO BKTS, & ST LT -TOP POLE ABOVE TV -TV TO TRANSF AT P02 AT GRID 318154-165642: -INST 37.5KVA XFMR & LBC/O -INST R/C FOR COM NEUT WEST USING THE NEUT OF THE OPEN-WIRE-SEC -REMOVE THE OPEN-WIRE-SEC ONE SPAN WEST 158 FEET -CONNECT THE 3 EXIST OH SVCS & ST LT TO THE XFMR GENERAL SPECIFICATIONS Scope of Work GAS PHONE CABLE TV N/A 583058145 N/A N/A N/A 108103616 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A PROJECT PHASE PWR NOTIF#ORDER# Superior OH Operations Relocation Removal Temporary Job Order Distribution HP Main HP Svc/MSA THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773)101108843N Vicinity Map NOT TO SCALE FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Correct QC Checklist(s) reviewed. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP L. NEELY 253-569-2523 11/7/17 L. NEELY 253-569-2523 11/7/17 L. ORTIZ 714-893-2405 11/7/17 N/A RENTON PCR-13 411 SENECA CT NW, RENTON REPLACE B/O POLE 411 SENECA CT NW, RENTON WA 98057 ASPLUNDH CONSTRUCTION CORP. O-387434-1 101108843 AS NOTED 1/1 KING QCSOKE SW 7-23N-05E 2305E027 2305E028 PCR-132305E027 11343942 101108843 Owner / Developer Contact Info officeATTN: E-Mail: Cell Phone: Project Manager Contact Information: Manager:LUKE NEELY 253-569-2523 LUKE.NEELY@PSE.COM THOMAS GUIDE 656-A1 SITE MAP - UNIVERSAL MAP SCALE: 1" = 50' MAP#: 2305E027 ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE MAP#: 2305E028 Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage P01 318141-165633 37.5 Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P01 318141-165633 50 POLE TABLE (NEW) Site # Pole Data Grid #Height Class Year Remarks / Location Ref. P01 318141-165633 40 1 POLE TABLE (REMOVAL) Site # Pole Data Grid #Height Class Year Remarks / Location Ref. P01 318141-165633 40 5 UNK PSE No No No Yes Yes Yes "Flagging Required" "Outages Required" "Locates Required" OVERHEAD CONSTRUCTION Poles & Structures -Poles are to be installed or relocated as staked. Unless otherwise noted, all pole location measurements are from the center of the pole. -All new poles set shall be the class indicated on the sketch, or better. Do not set a lower class pole than specified. -Install ground plate assembly on all new poles. Install Switch Ground Assembly per standard specification 6014.1000 at new gang operated switch locations. -Install grid numbers on all new and existing poles as shown on sketch. -Straighten existing poles as indicated or as necessary. -Treat all field-drilled poles with copper napthenate wood preservative. -Remove old poles after communication companies have transferred off and return to PSE storeroom. Fill and crown pole holes and restore the area similar to adjacent landscaping. Conductors & Equipment -Transfer all overhead and underground primary, secondary and service conductors and guys to new poles set, unless otherwise indicated on this sketch. -Transfer existing transformers to new poles unless otherwise indicated on this sketch. -Use stirrups to connect all overhead and underground primary taps, and transformers above 25 kVA. Install at all sites being worked within the scope of the project where they are currently missing. - For 12vK construction, install avian protection with #4 CU-covered jumpers (MID#9998076) and #4 SD Aluminum covered tie-wire (MID#8309760). For 34vK construction use bare wire primary jumpers with pre-formed helical-grip ties and avian protection devices when required per Std. 6015.2000. Jumpers for poles that are double dead ended with tree wire can be either the same size tree wire conductor or covered CU. -Apply grit inhibitor on all Ampact, stirrup, and dead-end connections. -Connect primary taps and transformers to same phase as existing unless otherwise shown on the drawing. -All neutral connections to be made with solid compression connectors. Connect all pole grounds to common neutral. -Use Load-interrupter cutouts (with arc shields) on all primary overheads and underground taps with fused protection above 40T. -Install Wildlife Protectors on all transformers. Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage P02 318154-165642 37.5 SINGLE-PHASE DEADEND NOT TO SCALE STD. 6031.1040 -1 Luke Neely Luke Neely 253-569-2523 253-569-2523 11/8/17 11/8/17 MFP17005724 TO: City of Renton RE: PSE Job Number 101108843 TYPE OF WORK: Replace bad order pole serving existing overhead services at 402 and 406 Seneca CT NW, Renton LOCATION OF WORK: 402 and 406 Seneca CT NW, Renton SCOPE OF WORK: At location P01 as shown on the attached copy of the worksketch, PSE is requesting exemption from the underground ordinance in order to replace the bad condition pole serving the existing overhead services to 402 and 406 Seneca CT NW in Renton. The approximate time for the work on the pole is 8 hours using the attached traffic control plan. Give me a call if there are any questions on the work to be done. Sincerely, Luke Neely Regional System Engineer, South King County Puget Sound Energy Cell 253-569-2523 Cc: file MFP17005724