Loading...
HomeMy WebLinkAboutMFP17005837DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP17005837 IVR Number: 17005837 Permit Informa!on Permit Name:Puget Sound Energy - Electric Address/Loca!on:12/04/2017Applica!on Date:1523059002Parcel Number:4815 NE 4TH ST Permit Type :12/20/2017Issue Date:Franchise Permit Work Class:12/20/2018Expira!on Date :Minor U%lity Job Number:105080428Franchise Type :Electric Descrip!on:Install 3 phase commercial primary line extension . Reframe pole and pull new UG primary in exis%ng conduit . Restora%on per City of Renton standards . Contacts Name Address PhoneTypeBilling ANISH KUMAR PUGET SOUND ENERGY - ELECTRIC - BILLING 6905 S 228th St Kent, WA 98032 B: (253) 208-2183Applicant Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: BL.005109Electrical Contractor : POTELI*344O4 Construc!on Contractor : POTELI*227PL CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner ANISH KUMAR PUGET SOUND ENERGY - ELECTRIC - BILLING 6905 S 228th St Kent, WA 98032 B: (253) 208-2183Specialized Billing X General Condi!ons & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 | Published: 3/30/2017 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 3/30/2017 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street ☐ Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Puget Sound Energy - Electric 105080428 Anish Kumar 253-208-2183 anish.kumar@pse.com 4815 NE 4th St Renton MINI LLC Install 3 phase commercial primary line extension. Crew will need to occupy W bound shoulder of NE 4th St to reframe pole and pull new UG primary in existing conduit. Restoration per City of Renton standards. Potelco Inc.253-208-2183 BL005109 Poteli*227PL 12/04/2017 MFP17005837 Scott Warlick 12/11/2017 Justin Johnson 12-19-2017 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: • Comply with all traffic regulations of the City of Renton and the State of Washington. • Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. • Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. • Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. • Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. • The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. • In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. • Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. • By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: Reset FormPrint Form Renton MINI LLC PSE/Potelco Inc. Marc Bayley 253-259-4494 6905 S 228th St, Kent, WA 98032 marcus.bayley@pse.com 4815 NE 4th St Evening (will call in or MBP) TBD Anish Kumar 12/04/2017 MFP17005837 Justin Johnson 12-19-2017Monday through Friday 9:00 am to 3:00 pm SKETCH I -- NORTH -- I NOTES: • Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. • The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. • Approved Temporary Traffic Control Plan must be at the work site during work hours. • Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. • Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. • Total road closure lasting more than 24 hours is subject to the approval by the City Council. • Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: • Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. • Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. • The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. • Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). PROJECT PROJECT LOCATION TRAFFIC FLOW PERM LANE MARKINGS TAPERS / TANGENTS PROTECTIVE VEHICLE W/BEACON TRUCK-MOUNTED ATTENTUATOR PORTABLE TRAFFIC SIGNAL SLOW VMS12 LEGEND FLAGGER OFFICER SURVEYORS WORK SPACE UTILITY WORK CONSTRUCTION DEVICES SIGNS BARRICADES ARROW BOARD ARROW MODE ARROW BOARD CAUTION MODE PCMS / VMS TEMPORARY TRAFFIC CONTROL PLAN Not Drawn to Scale This sketch not to be relied upon for exact location of utilities. CALL (800) 424-5555 TWO BUSINESS DAYS BEFORE YOU DIG PERMIT DRAWING NOT TO SCALE Drawn by: D Sandall - WA TCS Certificate # 8957, OR TCS Certificate # 5107 425-923-0010 4/8/2016 1 of City of Renton WORK HOURS LANE WIDTH POSTED SPEED MERGE TAPER (L) BUFFER SIGN SPACING DEVICES TAPERS DEVICES TANGENT 10-20 ft X 60FT 8am to 5pm !Work from P01 to V01 11ft 4815 NE 4th St Yes No Traffic Control Supervisor(TCS) X Flaggers/Spotters X Uniformed Officer X 225ft 1 35mph Dana M Smith dana.smith@pse.com 101097081 Boris Sidorov-PSE Boris.Sidorov@pse.com 105080869 David Goodale david.goodale@pse.com 105080428 Dianne Alexander Dianne.Alexander@pse.com 101098429 250ft 350ft MFP17005837 SSSSSAASSTTTSSSSSSSSSUP UPUP318090-167369300kVA 277/480v100TXT76888210'55'35'MAP17FEEDJOB SITE210'55'35'4'x4'WORK PIT8'x8'WORK PITPOTELCO TO INSTALL 1-4" SCH'L 80 CONDUIT, ±300'INSTALL 1 RUN OF 3Ø 1/0 AL JKT PRI CABLE, ±355'(EHC802-AØ, EHC803-BØ, EHC804-CØ)SITE PLANOwner / Developer Contact InfoofficeATTN:RENTON MINI LLC.918 S HORTON ST. #1000SEATTLE, WA 98134TRAVIS AMECHE(425)213-4000105080428THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL (800) 424-55552 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)OVERHEAD CIRCUIT MAPSCALE: 6" = 1 MILEARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSIONSTRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)EROSION & SEDIMENT CONTROL REQUIREMENTSNOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROLEROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.FOREMAN (CHECK BOX WHEN COMPLETED)PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.Grid, Cable, and Switch numbers INSTALLED & VERIFIED.Field Changes RED-LINED on As-built.Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.Foreman's Signature _______________________________________________Print Name ___________________________________ Date ______________Material VERIFIED and CHANGES noted on Paperwork.Total PRIMARY Cable noted on As-built.Company ID#'s RECORDED in correct location on As-built.Deviations noted on the As-built and their reason.I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met.CIRCUIT LOADING TABLEAS OFEXIST. PEAK LOADEST. NEW LOADTOTALCIRCUIT:A PHASE B PHASE C PHASEMAP-172015186196186+9+9+9195205195GASPHONECABLE TV501272328105080428N/AN/AN/AN/AN/AN/APROJECT PHASEPWRNOTIF#ORDER#SuperiorDistributionHP MainHP Svc/MSADESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPVIC IBARRA425-429-457402/05/16VIC IBARRA425-429-457402/05/16N/AN/AN/AJ. REIBMAN253-437-679802/05/16REQUIREDCITY OF RENTONRENTON MINI LLC.INSTALL 3Ø PRIMARY LINE EXTENSION4815 NE 4TH ST, RENTON WA 98059PSEN/AN/AN/A105080428AS NOTED1/1KINGN/AN/ACSPSKEINT23N, R05E, NW SEC 15N/AN/A2305E0582305E0882305E058MAP-17N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/APOWER GENERAL NOTES - COMMERCIAL PROJECT8.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation fromthis work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.All switching arrangements and/or outage arrangements are to be made with the Project Manager at leastthree (3) working days in advance.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencingwork to get the underground facilities located.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or constructionmaterials which would restrict construction and/or equipment access, before work can begin.Roads shall be paved or have a compacted , crushed rock base in place.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet fromcombustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guardposts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.All work is to be done in accordance with local municipal and county permit requirements as applicable.Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduitsand crossings from the individual unit's meter base to the designated connection point.Inclement weather conditions may cause delays in construction times and dates.1.2.3.4.5.6.7.9.10.PSENoNoNoYesYesYesNoYesDeveloper"Flagging Required""Outages Required""Locates Required"E-Mail:Cell Phone:Project Manager Contact Information:Manager:VIC IBARRA425-429-4574victor.ibarra@pse.comNVicinity MapSCALE: 1"=50'SITE SPECIFIC NOTESAT P01: GRID#218112-167360- EXISTING POLE AND EQUIPMENT TO REMAIN,167$//$/80‘35,0$5<7(5021)*75,81,7- INSTALL (3) L/B C/O's & SURGE ARRESTERS, FUSE @ 100T- INSTALL SW #T76888- INSTALL (3) STIRRUPS- INSTALL 4" PRIMARY RISER ON EXISTING S/O BRKTSAT V01: GRID#218090-167369- INSTALL 4'-8" SQ VAULT w/ 4'-8" x 5'-6" COVER- INSTALL 300KVA THREE-PHASE PM TRF 277/480v- INSTALL (3) L/B ELBOWS- INSTALL (3) 4POS SECONDARY CONNECTORS- CONNECT & TAG CUSTOMER RAN UG SVC LINES (2 RUNS OF 250MCM AL)- INSTALL GRID #218090-167369SPAN NOTESP01 TO V0136(72,167$//“   6&+ /*5$<39&&21'8,736(72,167$//“ 2)5812)$/-.7‘35,0$5<&$%/( (+&$(+&%(+&& CIRCUIT FEET ADDED: 300'@ TRANSFORMER% V. Drop (240v): 2.4%% Flicker (120v): 0.5%% Flicker (240v): 2.8%SQ. FOOTAGE: 63,740 SQPANEL SIZE: 400 AMPEXISTING LOAD: 0 KWNEW LOAD: 165 KWTOTAL LOAD: 165 KWLRC: 205 AMPTOP VIEWExcavation - 10-1/3 cubic yardsSIDE VIEWRockCrushed6"4'-4"2"8'8'4'-8"3'-6"4'-8"6"20"4'-8"5'-6"44"Not to scale6045.5000-13,600 lbs1,657 lbsVAULT & EXCAVATION DETAILCommunicationsPrimary PowerCables or ConduitExcavated Dirt PileROADSIDEFinal Grade24" Min4" MinSeparation36"MinCover48"MaxBackfill(No rocks over 10" diameter)Separation12" MinGas4" Sand Bedding32" Typical(Power, Gas, andCommunications)JOINT TRENCH DETAILPrimary-Mainline Gas & Communications (NTS)Separation12" Min6" or 12" Min Sand Shading after Compaction- A 6" layer of sand is allowed when excavated native material contains rocks no larger than 8" in diameter.Trench and backfill requirements for primary electric line extension trenches (No PSE gas)- A 12" layer of sand is required when excavated native material contains rocks up to 10" in diameter.Standoff Bracket15" Min LengthConduit ClampConduitField FaceQuadrantClimbingSpaceRoad FaceQuadrantClimbingSpace5" MinCLLCDirection of Vehicular TrafficCONDUIT RISER PLACEMENT DETAILTOP VIEWNot to ScaleInstalled at site:Grid Number:kVA Rating:Foreman to redline the following informationTRANSFORMER INSTALLATIONCompany ID#:Primary phase connected to:Tested Secondary VoltageV01318090-167369300kVAPRIMARY CABLE & CONDUIT TABLELOCATIONCONDUITPRIMARY CABLEASBUILT INFORMATIONSIZEQtyLENGTHDesign(ft)BENDSPULLPULLCableLENGTHDesign(ft)Cable NumbersPlease RecordForeman - CompleteFROMTO(in)90°45°22°11°(lbs)Rev(lbs)SizeABCManufacturerCompoundYearActual Amount Installed (Conduit & Cable)P01V01412952353.6527.71/0 AL JKT350EHC802353.6527.71/0 AL JKT350EHC803353.6527.71/0 AL JKT350EHC804JOB SITECABLE & CONDUIT ONE-LINE DIAGRAMSCALE: NOT TO SCALEDEVELOPER CIVIL CONTRACTOR NOTES:- REQUIRED TO PROVIDE AN 8' x 8' WORK PIT AT THE 3 PHASE TRANSFORMER VAULT (V01).- REQUIRED TO PROVIDE A 4' x 4' WORK PIT AT EXISTING POLE (P01).- REQUIRED TO PROVIDE 6" OF CRUSHED ROCK FOR 3 PHASE VAULTS- REQUIRED TO PROVIDE AND HAVE EQUIPMENT TO PUMP OUT WATER FOR METER BASE PITS &TRENCH AT ALL TIMES.CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION &RESTORATION PER PUGET SOUND ENERGY STANDARDS #6750.6500.**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL**PSE TO PROVIDE CONDUITS:- PSE TO PROVIDE 3/8" POLY RATED 1,800LBS PULL ROPE IN ALL CONDUITS.DEVELOPER EXCAVATION SPLICE NOTES:- REQUIRED TO EXCAVATE & EXPOSED EXISTING PSE UG FACILITIES 48 HOURS BEFORECONSTRUCTION.- ALL EQUIPMENT MUST BE PROTECTED FROM VANDALS WITH STEEL PLATES 48 HOURS BEFORECONSTRUCTION.- EXCAVATION MUST BE COMPLETED 48 HOURS PRIOR TO CONSTRUCTION.- REQUIRED TO HAVE EXCAVATION EQUIPMENT ON SITE THE DAY OF CONSTRUCTION TO COMPLETE%$&.),//,1*)257+(8*35,0$5<63/,&(6 ,167$//$7,212)7+(‘25‘9$8/7- BACKFILL / COVER REQUIRED ON PRIMARY.CONTRACTOR TRENCHING IN CITY OR COUNTY OR W.S. DOT RIGHTOF WAY NOTES:- PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT.IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILLSET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION ORINSTALLATION BEGINS.ALL INSPECTIONS ARE REQUIRED BY POTELCO INC:- IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.MFP17005837