Loading...
HomeMy WebLinkAboutMFP17005839DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP17005839 IVR Number: 17005839 Permit Informa!on Permit Name:Puget Sound Energy - Electric Address/Loca!on:12/05/2017Applica!on Date:1523059002Parcel Number:19244 106TH AVE SE Permit Type :12/20/2017Issue Date:Franchise Permit Work Class:12/20/2018Expira!on Date :Minor U’lity Job Number:101108299Franchise Type :Electric Descrip!on:Install OH to UG electric service from P01 to M01 to a demo/rebuild home. Trench 120' in dirt parallel to 106th ave se and bore 60' across 106th. Pothole all exis’ng u’li’es Restora’on per City of Renton standards . Contacts Name Address PhoneTypeBilling ANISH KUMAR PUGET SOUND ENERGY - ELECTRIC - BILLING 6905 S 228th St Kent, WA 98032 B: (253) 208-2183Applicant Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: BL.005109Electrical Contractor : POTELI*344O4 Construc!on Contractor : POTELI*227PL CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner ANISH KUMAR PUGET SOUND ENERGY - ELECTRIC - BILLING 6905 S 228th St Kent, WA 98032 B: (253) 208-2183Specialized Billing X General Condi!ons & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 | Published: 3/30/2017 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 3/30/2017 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street ☐ Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Puget Sound Energy - Electric 101108299 Anish Kumar 253-208-2183 anish.kumar@pse.com 19244 106th Ave SE 98055 Thompson Residence Crew to install OH to UG electric service from P01 to M01 to a Demo-Rebuild house. Builder to trench 120' in soft shoulder parallel to 106th Ave SE and bore 60' across 106th Ave SE. Restoration per City of Renton standards. 120'x3'x40" Potelco Inc.253-208-2183 BL005109 Poteli*227PL 12/05/2017 MFP17005839 Scott Warlick 12/11/2017 Pothole All existing Utilities Justin Johnson 12-19-2017 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: • Comply with all traffic regulations of the City of Renton and the State of Washington. • Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. • Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. • Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. • Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. • The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. • In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. • Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. • By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: Reset FormPrint Form Thompson Residence PSE/Potelco Inc. Dave Honeysett 253-245-0883 6905 S 228th St, Kent, WA 98032 dave.honeysett@pse.com 19244 106th Ave SE TBD 01/09/2018 Anish Kumar 12/05/2017 MFP17005839 Justin Johnson 12-19-2017 9:00 am to 3:00 pm SKETCH I -- NORTH -- I NOTES: • Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. • The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. • Approved Temporary Traffic Control Plan must be at the work site during work hours. • Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. • Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. • Total road closure lasting more than 24 hours is subject to the approval by the City Council. • Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: • Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. • Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. • The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. • Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). P01 STOP FLAGGER STOP FLAGGER 1111 #19244 CUSTOMER PROVIDED TRENCHING FROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARK NO PARK SIGNAGE WILL BE PLACED ON BOTH SIDES OF 106TH AVE SE TO SURROUND WORK ZONE RESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE STOP FLAGGER FLAGGERS WILL HOLD TRAFFIC TEMPORARILY FOR OVERHEAD WIRE REMOVAL BETWEEN P01 & #19244 1010ONE LANEROADAHEADW20-4100'100'100'ROADWORKAHEADW20-1W20-7AONE LANE ROAD AHEAD W20-4100'100'100'ROAD WORK AHEAD W20-1W20-7ABEPREPAREDTOSTOPW3-4100'100'100'ROADWORKAHEADW20-1W20-7ASE 194TH ST 106TH AVE SE106TH AVE SESE 192ND ST allow 11' minimumCHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 N PSE PUGET SOUND ENERGY JOB#101108299 19244 106th Ave SE, Renton WA November 27, 2017 ryan.honeysett@gmail.com425-457-5381 SHEET 1 OF 2 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. TRENCH 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY Puget Sound Energy Traffic Control Supervisor: Ryan Honeysett Card No. 010760 Card Exp. 06/30/2021 ryan.honeysett@pse.com (425)457-5381 PRINT ON 11 X 17 SHEETS ONLY MFP17005839 P01 STOP FLAGGER 1111 #19244 FROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARK NO PARK SIGNAGE WILL BE PLACED ON BOTH SIDES OF 106TH AVE SE TO SURROUND WORK ZONE RESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE STOP FLAGGER 1010ONE LANEROADAHEADW20-4100'100'100'ROADWORKAHEADW20-1W20-7AONE LANE ROAD AHEAD W20-4100'100'100'ROAD WORK AHEAD W20-1W20-7ABEPREPAREDTOSTOPW3-4100'100'100'ROADWORKAHEADW20-1W20-7ASE 194TH ST 106TH AVE SE106TH AVE SESE 192ND ST CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 N PSE PUGET SOUND ENERGY JOB#101108299 19244 106th Ave SE, Renton WA November 27, 2017 ryan.honeysett@gmail.com425-457-5381 SHEET 2 OF 2 BORE PIT 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY Puget Sound Energy Traffic Control Supervisor: Ryan Honeysett Card No. 010760 Card Exp. 06/30/2021 ryan.honeysett@pse.com (425)457-5381 PRINT ON 11 X 17 SHEETS ONLY Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. MFP17005839 PARCEL #1789100010NOP26SE 194TH ST33'63'1924425kVA 120/240v62'CUSTOMER SUPPLIED4' X 4' WORK PITCUSTOMER SUPPLIED1 CUBIC YARD 5/8" CRUSHED ROCKCUSTOMER SUPPLIED4' X 4' WORK PIT3/4" CUBIC YARD SANDCUSTOMER SUPPLIED1-3" SCHED'L 80 PVC CONDUIT ± 30'INST. 1-RUN 350 UG TPX ± 190'CUSTOMER SUPPLIED1-3" SCHED'L 80 PVC CONDUIT ± 100'CUSTOMER SUPPLIED1-3" RED POLY PIPE ± 60'CUSTOMER INSTALLEDPSE SUPPLIEDSITE PLANNVicinity MapN/AOwner / Developer Contact InfoofficeATTN:DAWN THOMPSON12933 SE 46TH LNRENTON, WA 98006DAWN THOMPSON(425) 785-5379ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSIONSTRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)EROSION & SEDIMENT CONTROL REQUIREMENTSNOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROLEROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.STANDARD EASEMENT PROVISIONAn easement is hereby reserved for and conveyed to Puget Sound Energy,Inc., Telephone Co., Television Cable Co., and their respective successorsand assigns under and upon the private street(s), if any, and the exteriorten (10) feet of all lots, tracts and spaces with in the plat lying parallel withand adjoining all street(s) in which to construct, operate, maintain, repair,replace and enlarge underground or ground-mounted appurtenancesthereto for the purpose of serving this subdivision and other property withelectric, gas, telephone and other utility service, together with the right toenter upon the streets, lots, tracts and spaces at all times for the purposesherein stated.101108299FOREMAN (CHECK BOX WHEN COMPLETED)PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.Grid, Cable, and Switch numbers INSTALLED & VERIFIED.Field Changes RED-LINED on As-built.Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.Foreman's Signature _______________________________________________Print Name ___________________________________ Date ______________Material VERIFIED and CHANGES noted on Paperwork.Total PRIMARY Cable noted on As-built.Company ID#'s RECORDED in correct location on As-built.Deviations noted on the As-built and their reason.I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met.GASPHONECABLE TV108103272PROJECT PHASEPWRNOTIF#ORDER#SuperiorE-Mail:Cell Phone:Project Manager Contact Information:Manager:DAVE HONEYSETT253-245-0883DAVE.HONEYSETT@PSE.COMPSENoNoNoYesYesYesNoYesDeveloper"Flagging Required""Outages Required""Locates Required"SCALE: 1" = 50'THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL 811 TWO BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)UTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPD. HONEYSETT253-245-088311/14/17D. HONEYSETT253-245-088311/14/17T. MYER(714) 893-240511/14/17N/ARENTONTHOMPSON RESIDENCESIMPLE SERVICE W/ PERMITS19244 106TH AVE SE, RENTON, WA 98055N/AN/AN/A101108299AS NOTED1 OF 1KINGN/AN/ACSPSKEINNW 5-22N-05EN/AN/A2205E0182205E0362205E018NOP-26N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A101108299505009269SITE SPECIFIC NOTESAT P01: 315938-166204-EXISTING POLE TO REMAIN-EXISTING 25kVA XFMR TO REMAIN-REPLACE EX. GRASSHOPPER CUTOUT W/ NEW CUTOUT (4899000) PER STD 6025.1000-REPLACE EX. FUSE W/ NEW 10T FUSE (3412200) PER STD 6025.1000-INSTALL 3" SEC RISER (RIS3CSS) PER STD 6042.1000-REMOVE EX. OH SVC TO "19244" (TEMP METER)AT M01: NEW METER BASE-INSTALL 200A METERCUSTOMER & DEVELOPER NOTESTHE CUSTOMER IS RESPONSIBLE TO PROVIDE ALL TRENCHING, SELECT BACKFILL, COMPACTION &RESTORATION PER PUGET SOUND ENERGY STANDARDS 6750.65005(48,5('723529,'( ,167$//´6&+('8/(39&&21'8,7)52030 5(48,5('72,167$//5('32/<3,3(3(536(63(&,),&$7,216“ 5(48,5('723529,'( ,167$//´12132/<38//523(,1$//&21'8,76-REQUIRED TO PROVIDE 4' X 4' WORK PIT & 1 CUBIC YARD 5/8" CRUSHED ROCK AT P015(48,5('723529,'(¶;¶:25.3,7 &8%,&<$5'2)6$1'$7M01-REQUIRED TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL-REQUIRED TO PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS & TRENCH AT ALL TIMES-REQUIRED TO EXCAVATE & EXPOSE EXISTING PSE UG FACILITIES 48 HOURS PRIOR TO CONSTRUCTION-PSE INSPECTION IS REQUIRED PRIOR TO FINAL BACKFILL-PSE WILL NOT ENERGIZE FACILITIES UNTIL BACKFILL IS COMPLETE-RENTON INSPECTION & APPROVAL IS REQUIRED 5 BUSINESS DAYS PRIOR TO CONNECTIONSPAN SPECIFIC NOTESP01 TO X01:&86720(572,167$//6&+(' /39&&21'8,7“ X01:36(726833/<&86720(572,167$//5('32/<3,3(“ X01 TO M01:&86720(572,167$//6&+(' /39&&21'8,7“ P01 TO M01:,167$//5818*73;&$%/(“  7$,/“ 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketchmust be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) workingdays in advance.3.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get theunderground facilities located.4.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketchand details for locations. Equipment locations must be approved by the Project Manager.5.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials whichwould restrict construction and/or equipment access, before work can begin.6.Roads shall be paved or have a compacted , crushed rock base in place.7.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls,overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSEstandards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them inthe right of way, and at least 1 foot when crossing them.8.All work is to be done in accordance with local municipal and county permit requirements as applicable.9.Inclement weather conditions may cause delays in construction times and dates.10.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per thissketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slopethe trench to 1:1.POWER GENERAL NOTES - RESIDENTIAL PROJECTCIRCUIT LOADING TABLEAS OFEXIST. PEAK LOADEST. NEW LOADTOTALCIRCUIT:A PHASE B PHASE C PHASENOP-2606/2017211.00208.00287.001.170.000.00212.17208.00287.00OVERHEAD CIRCUIT MAP 2205E036SCALE: 6" = 1 MILECIRCUIT FEET ADDED: 0'SQ. FOOTAGE: 1767 SQ FTPANEL SIZE: 200AHEAT TYPE: ELECTRICEST. DEMAND: 8kWLRC: 80A% V. DROP: 2.7%% FLICKER: 2.6%NEW CABLE & CONDUIT DIAGRAMNOT TO SCALEJOB SITEJOB SITEASPLUNDH CONSTRUCTION CORP.PLACE PEA GRAVELBAGS (MID 9995892)FOR SEDIMENT TRAPPLACE STRAW MULCH ONDISTURBED AREAAUGERED HOLEPOLETYPICAL AUGERED WORK SITE - 0150.3200TECHNIQUES FOR EROSION AND SEDIMENT CONTROLDITCH OR SENSITIVE AREAStandoff Bracket15" Min LengthConduit ClampConduitField FaceQuadrantClimbingSpaceRoad FaceQuadrantClimbingSpace5" MinCLLCDirection of Vehicular TrafficUNDERGROUNDCABLE CONDUITSTO THIS QUADRANTCONDUIT RISER PLACEMENT DETAILSCALE: NONETOP VIEW106TH AVE SE32"Typical24"Min24"-36"24"-36"4'Top ViewElectric & Joint UtilityWork Pit Dimensions36"MinDrainage Pipe12" Minimum Clearancefrom Gas Service LinesConduit Depth24" to 36" MaxRegulator VentGas Meter AssemblyUtility Provided48"4'8"Service (Permanent Detail:)Not to ScaleSealConduitEndsClosed4'8"24" Min36" Typical3'To TrenchProperty LineConduit StakesCustomer Provided3" Schedule 40 Grey PVCPower Cable ConduitCustomer ProvidedGas Service Line ConduitSch 40 White PVCCustomer Provided3" Conduit Service RiserCustomer ProvidedElec. Mtr BaseElec Mtrutility providedGas MeterRelief VentBuilding WallElec. MtrSCALE: NONEMETER DETAIL @ M01TV & TELElectric Service Cable in Conduit3" Schedule 80 Grey PVCExcavated Dirt PileFinal Grade24" Min24" Minto36" MaxCoverSeparation12" Min20" Min JOINT TRENCH DETAILElectric Service Cable in Conduit (NTS)To Excavated Dirt Pile36" MINIMUM COVERIN RIGHT OF WAYBackfill for Conduit Free of rocks larger than 8" in diameter)Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris,glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.depth as mainline trench conduit.36" Min Cover(38" Max)6"Road crossing must be at samePavementCurbSidewalkR/WROAD CROSSING ELEVATIONNot to scale6790.0075OH TEMP SERVICE / REMOVALMFP17005839Pothole all existingUtilities