Loading...
HomeMy WebLinkAboutP_Design_105086418_V1_170927316644-166295 NEW 25kVA 120/240v JOB SHACK 4/0ACSRBENSON ROAD108TH AVE SE316626-166295 316664-166293 600A SOLID BLADES SWITCH # _ _ _ _ _ _ 100T SWITCH #T78401 JOB SITE JOB SITE 504972425 105086418 504972427 104296201 PROJECT PHASE PWR NOTIF#ORDER# Superior Perm. Service THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773)105086418Owner / Developer Contact Info officeATTN: AVAYA RIDGE APARTMENTS 10615 SE 172ND ST RENTON, WA 98055 JOEL HARMON 916-799-1050 OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE SITE PLAN FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. 11. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. Inclement weather conditions may cause delays in construction times and dates. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 8. POWER GENERAL NOTES - COMMERCIAL PROJECT 9. 10. E-Mail: Cell Phone: Project Manager Contact Information: Manager:VAL BUZUNOV 425-457-9938 VAL.BUZUNOV@PSE.COM N Vicinity Map N/A PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" SCALE: 1" = 50' Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: P01 316644-166295 25kVA 6211250 UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP VAL BUZUNOV 425-457-9938 09/14/17 VAL BUZUNOV 425-457-9938 09/14/17 N/A N/A N/A JUSTIN HANG 253-503-7880 09/14/17 N/A CITY OF RENTON AVAYA RIDGE APARTMENTS NEW OH TRF & OH TEMP SERVICE 10615 SE 172ND ST, RENTON, WA 98055 N/A N/A N/A 105086418 AS NOTED 1/1 KING N/A N/A CSPSKEIN T23N, R05E, SEC 29 SW N/A N/A 2305E115 2305E115 2305E136 ROL-15 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A SITE SPECIFIC NOTES P01 GRID NUMBER 316644-166295: -EXISTING DISTRIBUTION POLE TO REMAIN -INSTALL 25kVA 120/240v OH TRF W/ L/B C/O & FUSE AT 10T & TAP AØ M01: -INSTALL 1 - 200A TEMPORARY METER SPAN SPECIFIC NOTES P01 - M01: -PSE TO INSTALL ±80' OF (1) 1/0 OH TPX LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: N/A 200 ELECTRIC 17KW 65A 2.2% 2.2% CIRCUIT FEET ADDED: 0' CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE 329310307.49 --2.49 329310305 2017 ROL-15 OVERHEAD CLEARANCE DETAIL NOT TO SCALE