Loading...
HomeMy WebLinkAboutP_Design_101108765_V1_171206PARCEL # 7227801915 HIG 13 HARRI N G T O N A V E N E INDEX AVE NE50kVA 120/240v 1810 1808 61' 49' 58' N Vicinity Map N/A Owner / Developer Contact Info officeATTN: VINCE MA 10441 DIXON DR S SEATTLE, WA 98178 TROY MOBLEY (253) 617-9288 101108765FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. GAS PHONE CABLE TV 504113054 "1810"104297781 PROJECT PHASE PWR NOTIF#ORDER# Superior E-Mail: Cell Phone: Project Manager Contact Information: Manager:MARC BAYLEY (253) 234-6432 marcus.bayley@pse.com PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP M. BAYLEY (253) 234-6432 11/21/17 M. BAYLEY (253) 234-6432 11/21/17 T. MYER (714) 893-2405 11/21/17 N/A RENTON HARRINGTON DUPLEX OH SVC'S Overhead Service Upgrade 1808 & 1810 HARRINGTON AVE NE SEATTLE, WA 98178 RENTON, WA 98056 N/A N/A N/A 101108765 AS NOTED 1 OF 1 KING N/A N/A CSPSKEIN SW 4-23N-05E N/A N/A 2305E015 2305E040 2305E015 HIG-13 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 101108765504769668 "1808" JOB SITE ASPLUNDH CONSTRUCTION CORP. STANDARD EASEMENT PROVISION An easement is hereby reserved for and conveyed to Puget Sound Energy, Inc., Telephone Co., Television Cable Co., and their respective successors and assigns under and upon the private street(s), if any, and the exterior ten (10) feet of all lots, tracts and spaces with in the plat lying parallel with and adjoining all street(s) in which to construct, operate, maintain, repair, replace and enlarge underground or ground-mounted appurtenances thereto for the purpose of serving this subdivision and other property with electric, gas, telephone and other utility service, together with the right to enter upon the streets, lots, tracts and spaces at all times for the purposes herein stated. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. 2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. 3.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. 4.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. 5.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. 6.Roads shall be paved or have a compacted , crushed rock base in place. 7.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. 8.All work is to be done in accordance with local municipal and county permit requirements as applicable. 9.Inclement weather conditions may cause delays in construction times and dates. 10.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE HIG-13 06/2017 88.00 136.00 113.00 2.63 0.00 0.00 90.63 136.00 113.00 OVERHEAD CIRCUIT MAP 2305E040 SCALE: 6" = 1 MILE JOB SITE MINIMUM OH SERVICE LINE VERTICAL CLEARANCES NOT TO SCALE SITE PLAN SCALE: 1" = 50' SITE SPECIFIC NOTES AT P01 GRID#318829-166670 -EXISTING POLE TO REMAIN -CONNECT 1/0 TPX SERVICE TO 1808 HARRINGTON AVE NE -CONNECT 1/0 TPX SERVICE TO 1810 HARRINGTON AVE NE SPAN SPECIFIC NOTES P01 TO 1808: -PSE/POTELCO TO STRING OH 1/0 TPLX SVC 50' ____' ACTUAL P01 TO 1810: -PSE/POTELCO TO STRING OH 1/0 TPLX SVC 50' ____' ACTUAL CIRCUIT FEET ADDED: 0' SQ. FOOTAGE: 720 SQ FT PANEL SIZE: 200A HEAT TYPE: ELECTRIC EST. DEMAND: 18kW (9kW Per Unit) LRC: 65A % V. DROP: 2.1% % FLICKER: 1.5%