INDEX AVE NE50kVA 120/240v
1810
1808 61'
49'
58'
N
Vicinity Map
N/A
Owner / Developer Contact Info
officeATTN:
VINCE MA
10441 DIXON DR S
SEATTLE, WA 98178
TROY MOBLEY (253) 617-9288 101108765FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
GAS
PHONE
CABLE TV
504113054 "1810"104297781
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:MARC BAYLEY
(253) 234-6432
marcus.bayley@pse.com
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
M. BAYLEY (253) 234-6432 11/21/17
M. BAYLEY (253) 234-6432 11/21/17
T. MYER (714) 893-2405 11/21/17
N/A RENTON
HARRINGTON DUPLEX OH SVC'S
Overhead Service Upgrade
1808 & 1810 HARRINGTON AVE NE SEATTLE, WA 98178 RENTON, WA 98056
N/A N/A
N/A 101108765
AS NOTED 1 OF 1
KING N/A N/A CSPSKEIN
SW 4-23N-05E N/A N/A
2305E015 2305E040 2305E015 HIG-13
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
101108765504769668 "1808"
JOB SITE
ASPLUNDH CONSTRUCTION CORP.
STANDARD EASEMENT PROVISION
An easement is hereby reserved for and conveyed to Puget Sound Energy,
Inc., Telephone Co., Television Cable Co., and their respective successors
and assigns under and upon the private street(s), if any, and the exterior
ten (10) feet of all lots, tracts and spaces with in the plat lying parallel with
and adjoining all street(s) in which to construct, operate, maintain, repair,
replace and enlarge underground or ground-mounted appurtenances
thereto for the purpose of serving this subdivision and other property with
electric, gas, telephone and other utility service, together with the right to
enter upon the streets, lots, tracts and spaces at all times for the purposes
herein stated.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch
must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working
days in advance.
3.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the
underground facilities located.
4.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch
and details for locations. Equipment locations must be approved by the Project Manager.
5.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which
would restrict construction and/or equipment access, before work can begin.
6.Roads shall be paved or have a compacted , crushed rock base in place.
7.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls,
overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE
standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in
the right of way, and at least 1 foot when crossing them.
8.All work is to be done in accordance with local municipal and county permit requirements as applicable.
9.Inclement weather conditions may cause delays in construction times and dates.
10.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this
sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and
24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope
the trench to 1:1.
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
HIG-13
06/2017
88.00 136.00 113.00
2.63 0.00 0.00
90.63 136.00 113.00
OVERHEAD CIRCUIT MAP 2305E040
SCALE: 6" = 1 MILE
JOB SITE
MINIMUM OH SERVICE LINE VERTICAL CLEARANCES
NOT TO SCALE
SITE PLAN
SCALE: 1" = 50'
SITE SPECIFIC NOTES
AT P01 GRID#318829-166670
-EXISTING POLE TO REMAIN
-CONNECT 1/0 TPX SERVICE TO 1808 HARRINGTON AVE NE
-CONNECT 1/0 TPX SERVICE TO 1810 HARRINGTON AVE NE
SPAN SPECIFIC NOTES
P01 TO 1808:
-PSE/POTELCO TO STRING OH 1/0 TPLX SVC 50' ____' ACTUAL
P01 TO 1810:
-PSE/POTELCO TO STRING OH 1/0 TPLX SVC 50' ____' ACTUAL
CIRCUIT FEET ADDED: 0'
SQ. FOOTAGE: 720 SQ FT
PANEL SIZE: 200A
HEAT TYPE: ELECTRIC
EST. DEMAND: 18kW (9kW Per Unit)
LRC: 65A
% V. DROP: 2.1%
% FLICKER: 1.5%