HomeMy WebLinkAboutMFP17005927DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP17005927
IVR Number: 17005927
Permit Informa!on
Permit Name:Puget Sound Energy - Electric
Address/Loca!on:12/13/2017Applica!on Date:1523059002Parcel Number:11427 SE 162ND ST
Permit Type :12/21/2017Issue Date:Franchise
Permit Work Class:12/21/2018Expira!on Date :Minor U&lity
Job Number:105086971Franchise Type :Electric
Descrip!on:Replace distribu&on pole at P 01 and pull cable across the street at X 01. Pavement cut an&cipated , Restora&on per
City of Renton standards .
Contacts
Name Address PhoneTypeBilling
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC - BILLING
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Applicant
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: BL.005109Electrical Contractor : POTELI*344O4
Construc!on Contractor : POTELI*227PL
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC - BILLING
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Specialized
Billing
X
General Condi!ons & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Puget Sound Energy - Electric
105086971
Anish Kumar
253-208-2183
anish.kumar@pse.com
11427 SE 162nd St 98055 105086971
One at a time occupying E & W bound shoulders of SE 162nd St for crew to
replace distribution pole at P01 and pull cable across the street at X01. Pavement cut
anticipated, restoration per City of Renton standards.
20'x4'x42"
Potelco Inc.253-208-2183
BL005109 Poteli*227PL
12/13/2017
MFP17005927
Scott Warlick 12/15/2017
Justin Johnson 12-21-2017
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
Reset FormPrint Form
Cascade Greens - 105086971
PSE/Potelco Inc.
Dave Honeysett 253-245-0883
6905 S 228th St, Kent, WA 98032
dave.honeysett@pse.com
11427 SE 162nd St
TBD
TBD
Anish Kumar 12/13/2017
MFP17005927
Justin Johnson
12-21-2017
8:00 am to 3:00 pm
Monday through Friday
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
111112121111SE 162ND ST114TH AVE SE11427STOPFLAGGERSTOP
FLAGGERFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGBEPREPAREDTOSTOPW3-4100'100'100'ROADWORKAHEADW20-1W20-7A100'ROADWORKAHEADW20-1 100'ROADWORKAHEADW20-1
FROM TO
TOW AWAY AREA
PHONE 888-9999
INFRASOURCE LLC 000 0000000
NO PARKINGP01
RESIDENT(S) WILL BEINFORMED OF POSSIBLETEMPORARY DRIVEWAYCLOSURESE 162ND ST114TH AVE SE 1111BEPREPAREDTOSTOPW3-4BEPREPAREDTOSTOPW3-4100'100'
MATCHLINE SEE BELOW
BE
PREPARED
TO
STOP W3-4100'100'100'ROAD
WORK
AHEAD W20-1W20-7A1212MATCHLINE SEE ABOVE
SE 162ND STJob#10508697111427 SE 162ND ST, RENTON, WADecember 1, 2017Sheet 1 of 2 gregory.harwood@pse.com(425) 424-6425NPSEPUGETSOUNDENERGYTRENCH28" TRAFFIC CONELEGENDTRAFFIC FLOWWORK VEHICLESIGN LOCATIONWARNING FLAGFLAGGERSTOPTRAFFIC MANAGEMENT, INC.www.trafficmanagement.comC31 # 785804800.763.3999Traffic Control Services - Sales & RentalsPermits & Consulting - Engineering - TrainingPLAN PREPARED BY:DATE: 12/1/2017-JRPLAN ORDER: 31551TMI CONTACT PERSON: Michael FlanaganTCS CERT #: 301872CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040MINIMUM TAPER LENGTH = L (feet)LANEWIDTHSPOSTED SPEED LIMITS20253035404510111255 +60/6545/5535/403025SIGN SPACING"X"800500'350'200'100'Notes:1.All signs and spacing to conform to the MUTCD and City of RENTONstandards.2.All sidewalks, driveways, exits and egresses shall be completely clearunless otherwise indicated.3.Channelizing devices are 28" traffic cones.4.Sign size can be a minimum of 48" x 48" and shall not obstruct pedestrianaccess.5.Crew is required to leave a minimum of 11' for traveling lane width.6.Alert affected residents and businesses.7.Work to take place between 9 a.m. and 4 p.m.8.Contractor shall post temp "NO PARKING" 72 hours prior to construction.9.Work area will be APPROXIMATELY 240' ECL of 114TH AVE SE & on theNORTHSIDE of SE 162ND ST.POLEMFP17005927
111112121111SE 162ND ST114TH AVE SE11427STOPFLAGGERSTOP
FLAGGERRESIDENT(S) WILL BEINFORMED OF POSSIBLETEMPORARY DRIVEWAYCLOSUREFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGBEPREPAREDTOSTOPW3-4100'100'100'ROADWORKAHEADW20-1W20-7ABE
PREPARED
TO
STOP W3-4100'100'100'ROAD
WORK
AHEAD W20-1W20-7A100'ROADWORKAHEADW20-1 100'ROADWORKAHEADW20-1
FROM TO
TOW AWAY AREA
PHONE 888-9999
INFRASOURCE LLC 000 0000000
NO PARKING
1212SE 162ND ST114TH AVE SE 1111Job#10508697111427 SE 162ND ST, RENTON, WADecember 1, 2017Sheet 2 of 2 gregory.harwood@pse.com(425) 424-6425NPSEPUGETSOUNDENERGYTRAFFIC MANAGEMENT, INC.www.trafficmanagement.comC31 # 785804800.763.3999Traffic Control Services - Sales & RentalsPermits & Consulting - Engineering - TrainingPLAN PREPARED BY:DATE: 12/1/2017-JRPLAN ORDER: 31551TMI CONTACT PERSON: Michael FlanaganTCS CERT #: 301872CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040MINIMUM TAPER LENGTH = L (feet)LANEWIDTHSPOSTED SPEED LIMITS20253035404510111255 +60/6545/5535/403025SIGN SPACING"X"800500'350'200'100'Notes:1.All signs and spacing to conform to the MUTCD and City of RENTONstandards.2.All sidewalks, driveways, exits and egresses shall be completely clearunless otherwise indicated.3.Channelizing devices are 28" traffic cones.4.Sign size can be a minimum of 48" x 48" and shall not obstruct pedestrianaccess.5.Crew is required to leave a minimum of 11' for traveling lane width.6.Alert affected residents and businesses.7.Work to take place between 9 a.m. and 4 p.m.8.Contractor shall post temp "NO PARKING" 72 hours prior to construction.9.Work area will be APPROXIMATELY 300' ECL of 114TH AVE SE & on theSOUTHSIDE of SE 162ND ST.TRENCH28" TRAFFIC CONELEGENDTRAFFIC FLOWWORK VEHICLESIGN LOCATIONWARNING FLAGFLAGGERSTOPPOLEMFP17005927
83.39'73.00'N01°32'53"E 299.93'73.00'70.00'S88°16'35"E 99.34'N01°32'53"E 299.01'73.00'73.00'70.00'83.01'S88°29'36"E 99.34'S88°16'35"E 99.34'S88°16'35"E 99.34'S88°16'35"E 99.34'LOT 4(6,954 SQ. FT)LOT 3(7,252 SQ. FT)LOT 2(7,252 SQ. FT)LOT 1(8,265 SQ. FT)SSSSSSWWW20' BSBL20' BSBL5' BSBL5' BSBL20' BSBL20' BSBL5' BSBL5' BSBL15' BSBL15' BSBL5' BSBL5' BSBL5' BSBL20' BSBL20' BSBL15' BSBL1+002+001142016044
11436
16204 11435
11445
11453
16220
12626
317002-166526
37.5 kVA 120/240V
316999-166523
25 kVA 120/240V (A)
ERROR - SET SWITCH ID
ERROR - SET SWITCH ID (ERROR-SET FUSE)
SLAT8154
SE 162ND ST
114TH AVE SESS SS SSWWWWWWWWWWWWWWWSS
JOB
SITE
316999-166523
25 kVA 120/240V
EXISTING 40T
SW #T______
NEW 40T
SW #T______
SITE PLAN
N
Vicinity Map
N/A
Owner / Developer Contact Info
officeATTN:
Sapphire Homes, Inc
16834 SE 43rd ST
Bellevue, WA 98006
Travis Kassebaum (206) 484-4321
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
STANDARD EASEMENT PROVISION
An easement is hereby reserved for and conveyed to Puget Sound Energy,
Inc., Telephone Co., Television Cable Co., and their respective successors
and assigns under and upon the private street(s), if any, and the exterior
ten (10) feet of all lots, tracts and spaces with in the plat lying parallel with
and adjoining all street(s) in which to construct, operate, maintain, repair,
replace and enlarge underground or ground-mounted appurtenances
thereto for the purpose of serving this subdivision and other property with
electric, gas, telephone and other utility service, together with the right to
enter upon the streets, lots, tracts and spaces at all times for the purposes
herein stated.105086971FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
GAS
PHONE
CABLE TV
N/A 101109015
N/A 108103767
N/A 593190248
N/A N/A
N/A N/A
N/A
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Perm. Service
Relocation
Removal
Temporary
Job Order
Distribution
HP Svc/MSA
SITE SPECIFIC NOTES
Phone
INTOLIGHT Contact Information:
N/A
N/A
SCHED.SQ. FT.
MAX LRC =
CIRCUIT FEET ADDED:
___ AMPS
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.THE CUSTOMER IS RESPONSIBLE FOR PROVIDING ALL TRENCHING, PER THE TRENCH
PROFILE, AND ALL EXCAVATIONS AT THE TRANSFORMER/HANDHOLE VAULT SITES
SUCH THAT PSE FACILITIES WILL MATCH FINAL GRADE. VAULT HOLES WILL HAVE
STABLE LEVEL BOTTOMS. CUSTOMER WILL PROVIDE 6" OF CRUSHED ROCK FOR
VAULT BEDDING. ALL TRENCHES WILL HAVE 6" OF WASHED SAND COVER AND 4"
BEDDING FOR ALL CONDUITS. THE CUSTOMER WILL PROVIDE SELECT BACKFILL, IF
REQUIRED, AND COMPACTION AS NECESSARY. THE CUSTOMER IS RESPONSIBLE FOR
DISPOSAL OF ALL NATIVE SPOILS NOT SUITABLE FOR USE AS BACKFILL. ALL
TRENCHES MAY BE JOINT WITH GAS, TELEPHONE AND TV CABLE.
ALL CABLES/CONDUITS TO BE INSTALLED IN CUSTOMER'S TRENCH AT THE DEPTH
INDICATED IN TRENCH DETAIL (DEPENDENT UPON SIZE OF CONDUIT BEING INSTALLED
TO MEET MIN 36" OF COVER). INSTALL CABLE ID TAGS AT EACH END OF THE PRIMARY
CABLES PER THE CIRCUIT ONE-LINE DIAGRAM.
UNLESS OTHERWISE SPECIFIED BY MUNICIPALITIES, INSTALL PVC (DB-120) ROAD
CROSSINGS AS INDICATED ON THE CROSSINGS CONDUIT TABLE & AS SHOWN ON
WORK SKETCH. CROSSINGS SHALL BE INSTALLED BY CUSTOMER/DEVELOPER PER
PUGET SOUND ENERGY STANDARDS.
AT SYMBOL: INSTALL UNDERGROUND PRIMARY CABLES IN
CONDUIT. CABLE LENGTH AND CONDUIT SIZE AS INDICATED ON PRIMARY CABLE &
CONDUIT TABLE.
AT SYMBOL: INSTALL 600 VOLT UG SECONDARY CABLES IN
CONDUIT. CABLE/CONDUIT SIZE AND LENGTH AS INDICATED ON SECONDARY CABLE &
CONDUIT TABLE.
AT SYMBOL: INSTALL MINI-PAD HANDHOLE & PADMOUNT TRANSFORMER.
ADDITIONAL EQUIPMENT AS INDICATED ON VAULT TABLE.
AT SYMBOL: INSTALL SECONDARY PEDESTAL/HANDHOLE W/ (3)
MULTI-CONNECTORS. SIZE AS INDICATED ON SECONDARY HH/PEDESTAL TABLE.
(EXCAVATION: 3' SQ.)
AT SYMBOL: INSTALL JUNCTION BOX HANDHOLE. ADDITIONAL EQUIPMENT AS
INDICATED ON VAULT TABLE.
AT SYMBOL: INSTALL SECONDARY CABLE & CONDUIT STUB-OUT.
AT SYMBOL: INSTALL STREET LIGHTING STANDARD. SIZE AND TYPE OF
STANDARD/LUMINARIE AS INDICATED ON STREET LIGHTING TABLE. (CUSTOMER TO
EXCAVATE & INSTALL CORRUGATED STREET LIGHT TUBES FOR PLACEMENT OF THE
STREET LIGHT STANDARDS. )
INCLEMENT WEATHER CONDITIONS MAY CAUSE DELAYS IN CONSTRUCTION TIMES
AND DATES.
POWER GENERAL NOTES - PLAT PROJECT
11.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:Dave Honeysett
(253) 245-0883
DAVID.HONEYSETT@PSE.COM
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
SCALE: 1" = 50'
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
Dave Honeysett (253) 245-0883 11/27/17
Nate Linville (253) 970-7284 11/27/17
N/A N/A N/A
Nate Linville (253) 970-7281
Required City of Renton
Cascade Greens 4 Lot Plat
1Ø PRIMARY LE, SET PM TRF, INST 2 - STUBS
11427 SE 162ND ST, RENTON, WA 98055
N/A N/A
N/A 105086971
AS NOTED 1 OF 2
KING N/A N/A CSPSKEPM
NE-29-23N-05E N/A N/A
2305E113 2305E136 2305E113 ROL-16
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
Service Stubs
105086971
N/A
N/A
505052286
N/A
AT P01: REPLACE
REMOVE EXISTING B/O 1981 40' DISTRIBUTION POLE
TRANSFER EXISTING 25kVA 1B TO NEW POLE
TRANSFER EXISTING LUMINAIRE TO NEW POLE (SLAT8154)
TRANSFER EXISTING 1Ø 1/0 TERMINATION TO NEW POLE
-INST. 1 - 45' CL2 DISTRIBUTION POLE PER STD 6010.1000 (PD452)
-INST. 1 - 9' 8P XARM
-INST. 1 PTP & INSULATOR
-INST. 2 - STEEL ARM PINS & INSULATORS
-INST. 1 - BOLTED STIRRUP & HOT CLAMP ON BØ
-INST. 1 - L/B C/O ON NEW FG ARM, FUSE AT 40T PER STD 6043.1000 (TSU1C1)
-INST. 1 - 12kV 1/0 SOL CS PIN TERMINATION PER STD 6041.3000 (TER10JC)
-INST. CABLE # BØ-EHO831
-INST. NEW SW #T______
-INST. 1 - 2" PRIMARY RISER ON EXISTING S/O BRKTS PER STD 6042.1000 (RIS2CSS)
EXISTING GRID 316999-166523
COMMUNICATIONS TO TRANSFER
AT V01: NEW
-INST. 1 - 36" X 42" X 38" UNI-STRUT MP HH W/21" X 24" ACCESS HOLE PER STD 6045.1010 (MINI1SR)
-INST .1 - 37.5kVA 120/240V PM TRANSFORMER
-INST. 1 - L/B ELBOW & 1 DUST CAP PER STD 6041.1000 (ELB10J)
-INST. 3 - #6-350KCMIL 6POS SEC CONNECTION BLOCKS W/5/8" STUD ADAPTER (MID: 4842002)
-INST. GRID 317002-166526
SPAN NOTES
SEE CABLE TABLE ON P2 FOR CABLE AND CONDUIT INFORMATION
DEVELOPER & CUSTOMER NOTES:
THE CUSTOMER IS RESPONSIBLE FOR PROVIDING ALL TRENCHING, SELECT BACKFILL,
COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS 6750.6500
-REQUIRED TO PROVIDE 6' X 6' WORK PIT & 1 CUBIC YARD OF 5/8" MINUS AT V01
-REQUIRED TO PROVIDE 4' X 4' WORK PIT & 1 CUBIC YARD OF 5/8" MINUS AT P01
-REQUIRED TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL
-REQUIRED TO PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS & TRENCH AT
ALL TIMES
-EXCAVATE & EXPOSE EXISTING PSE UG FACILITIES 48 HOURS PRIOR TO CONSTRUCTION
-PSE INSPECTION IS REQUIRED PRIOR TO FINAL BACKFILL
-PSE WILL NOT ENERGIZE FACILITIES UNTIL BACKFILL IS COMPLETE
-L&I INSPECTION & APPROVAL IS REQUIRED 72 HOURS PRIOR TO CONNECTION
-RESPONSIBLE FOR ALL TREE TRIMMING AND BRUSH CLEARING
OVERHEAD CIRCUIT MAP (2305E136)
SCALE: 6" = 1 MILE
UNDERGROUND CIRCUIT MAP (2305E136)
SCALE: 6" = 1 MILE
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
ROL-16
6/13/17
205 191 213
-3.36 -
205 194.36 213
MFP17005927
9
0
°
60'150'140'150'PSE PROVIDED
1 - 2" SCH80 PVC CONDUIT
IN CUSTOMER TRENCH
PSE PROVIDED
2 - 3" DB120 CONDUIT
IN CUSTOMER TRENCH
316999-166523
25 kVA 120/240V
EXISTING 40T
SW #T______
NEW 40T
SW #T______
JOB
SITE
316999-166523
25 kVA 120/240V
EXISTING 40T
SW #T______
NEW 40T
SW #T______
397.5KCMIL ACSR
1 - 350KCMIL SEC TPLX
NEW
1 - 1/0 AL SOL PRIMARY
CABLE #BØ-EHO831
1 - 350KCMIL SEC TPLX
PRIMARY & SECONDARY CONDUIT DIAGRAM
N
Vicinity Map
N/A
Owner / Developer Contact Info
officeATTN:
Sapphire Homes, Inc
16834 SE 43rd ST
Bellevue, WA 98006
Travis Kassebaum (206) 484-4321 105086971FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
GAS
PHONE
CABLE TV
N/A 101109015
N/A 108103767
N/A 593190248
N/A N/A
N/A N/A
N/A
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Perm. Service
Relocation
Removal
Temporary
Job Order
Distribution
HP Svc/MSA
Phone
INTOLIGHT Contact Information:
N/A
N/A
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:Dave Honeysett
(253) 245-0883
DAVID.HONEYSETT@PSE.COM
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
SCALE: NONE
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
Dave Honeysett (253) 245-0883 11/27/17
Nate Linville (253) 970-7284 11/27/17
N/A N/A N/A
Nate Linville (253) 970-7281
Required City of Renton
Cascade Greens 4 Lot Plat
1Ø PRIMARY LE, SET PM TRF, INST 2 - STUBS
11427 SE 162ND ST, RENTON, WA 98055
N/A N/A
N/A 105086971
AS NOTED 1 OF 2
KING N/A N/A CSPSKEPM
NE-29-23N-05E N/A N/A
2305E113 2305E136 2305E113 ROL-16
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
Service Stubs
105086971
N/A
N/A
505052286
N/A
PRIMARY & SECONDARY CABLE DIAGRAM
SCALE: NONE
MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
OIL-FILLED EQUIPMENT
TRANSFORMER
APPROVED
AREA
COMBUSTIBLE BUILDING WALLS & ROOF10'
10'
10'
JOINT TRENCH DETAIL
Primary
Dirt Pile
Final Grade
24" Min
36"
Min Cover
Over Power
48"
Max
Depth
Final Backfill
Gas
4" Sand Bedding
Property Line
intercept (depth varies).
SidewalkCurb
Location of roof drain
48" Typical
Width may vary per
Number of Utilities
and Conduits
6" or 12" Min Sand Shading
Over Gas after Compaction
12" Min
R/W or
Excavated
12" Typical
Power
Secondary
Power
TV & TEL
NOTES:
1. If the final backfill contains rocks greater than 8 inches in diameter , install 12 inches compacted sand shading across the full width of the trench. *
If the final backfill contains rocks 8 inches in diameter or smaller , install 6 inches compacted sand shading across the full width of the trench. *
2. Rocks greater than 10 inches diameter are not permitted in the final backfill.
3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the
side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line.
4. Utilities shall not be stacked over the gas line in the trench.
5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements.
6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies.
* Alternatives to full-width trench shading require PSE approval.
12" Min
12" Min
Separation
4,5
1,2
1
3
6
6" or 12" Min Sand Shading
Over Power after Compaction1
Primary & Secondary-Mainline Gas & Communications (NTS)
TOP VIEW
SIDE
VIEW
EXCAVATION:
4-2/3 CUBIC YARDS
Rock
Crushed
6"
3'-6"
2"
6'
6'
48"42"
36"
38"
42"
Struts
FRONT
FRONTTRANSFORMER EXCAVATION DETAIL AT V01
SCALE: 6" = 1 MILE
MINIMUM CLEARANCES FROM OIL-FILLED EQUIP. TO BLDG. FEATURES
NOT TO SCALE
FIRE ESCAPE
SERVICE
GAS
RELIEF
DOOR, WINDOW, VENT,
OR OTHER OPENING
TANK
FUEL VENT OIL-FILLED
ELECTRICAL
EQUIPMENT
SPRINKLER VALVE,
STANDPIPE, OR
HYDRANT
20'
3'
10'
6'
10'
(TRANSFORMER)
PRIMARY CABLE & CONDUIT TABLE
LOCATION CONDUIT PRIMARY CABLE
ASBUILT INFORMATION
SIZE Qty LENGTH
Design
(ft)
BENDS PULL PULL Cable LENGTH
Design
(ft)
Cable Numbers Please Record Foreman - Complete
FROM TO (in)90°45°22°11°(lbs)
Rev
(lbs)Size A B C Manufacturer Compound Year Actual Amount Installed (Conduit & Cable)
P01 V01 1 2 210 2 0 0 0
PRI 12KV
1/0 UG 250 -EHO831 -
SECONDARY CABLE & CONDUIT TABLE
LOCATION CABLE Assumed
Lot Corner
CONDUIT VOLTAGE
DROP
VOLTAGE
FLICKER ASBUILT INFORMATION
SIZE LENGTH
Design
(ft)
SIZE LENGTH
Design
(ft)
BENDS
Foreman - Complete
FROM TO (1/0,4/0,350)to Meter(ft)(in)90°45°22°11°(Percent)(Percent)Actual Amount Installed (Conduit & Cable)
V01 LOT 3 4/0 UG TPX 160 40 3 140 1 0 0 0 1.6%3.7%
V01 LOT 4
350KCMIL UG
TPX 170 40 3 150 1 0 0 0 1.5%3.2%
CROSSINGS CONDUIT TABLE
X-ING
NO.
LOCATION GAS POWER Length
Remarks (type of crossing)
SIZE Type Qty Location SIZE Type Qty
(Primary, Feeder, Secondary, St.
FROM TO (in)sched each N-S-E-W (in)sched each (ft)Light, Gas Only, etc.)
X01 P01 V01 2 DB120 2 60 PRIMARY
60'= 2" SCH80 GREY PVC (ft)
0 = 3" DB120 GREY PVC (ft)
0 = Total 2" PVC Plug / Caps
0 = Total 3" PVC Plug / Caps
Total Glue = 0.5 Qts Total E 60'
COOLING
5' MIN
5' MIN
10' MIN
5'
MIN
FINS
ACCESS
CONCRETE PAD
MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
CURB OR EDGE OF PAVEMENT
CURB OR EDGE OF PAVEMENT
5' MIN
ROAD OR
PARKING AREA
TYP. PAD
& TRANS-
FORMER
3'
MIN
3' MIN
3' MIN
DOOR
ACCESS
DOOR
REQUIRED
WORK SPACE
AREA
MFP17005927
TO: City of Renton
RE: PSE Job Number 105086971
TYPE OF WORK: Changing out BO pole grid # 316999-166523 installing new class 2
45’pole approx. same location transfer all hardware, re-connect existing services, install
New risers, install OH to UG primary L/E for new 4 lot plat south of existing OH service.
LOCATION OF WORK: 11427 SE 162nd ST, RENTON, WA. 98055
SCOPE OF WORK:
At location P01 as shown on the attached copy of the worksketch, PSE is
requesting exemption to change out old pole and install new pole so we can extend
primary from P01 to V01 OH to UG service. We have submitted along with this the
design for approval and traffic control plans for this work.
Give me a call if there are any questions on the work to be done.
Sincerely,
David Honeysett
Puget Sound Energy
Project Manager
Customer & System Projects
Cell: (253) 254-0883
David.Honeysett@PSE.com
MFP17005927