HomeMy WebLinkAboutP_Design_105086971_V1_17121283.39'73.00'N01°32'53"E 299.93'73.00'70.00'S88°16'35"E 99.34'N01°32'53"E 299.01'73.00'73.00'70.00'83.01'S88°29'36"E 99.34'S88°16'35"E 99.34'S88°16'35"E 99.34'S88°16'35"E 99.34'LOT 4(6,954 SQ. FT)LOT 3(7,252 SQ. FT)LOT 2(7,252 SQ. FT)LOT 1(8,265 SQ. FT)SSSSSSWWW20' BSBL20' BSBL5' BSBL5' BSBL20' BSBL20' BSBL5' BSBL5' BSBL15' BSBL15' BSBL5' BSBL5' BSBL5' BSBL20' BSBL20' BSBL15' BSBL1+002+001142016044
11436
16204 11435
11445
11453
16220
12626
317002-166526
37.5 kVA 120/240V
316999-166523
25 kVA 120/240V (A)
ERROR - SET SWITCH ID
ERROR - SET SWITCH ID (ERROR-SET FUSE)
SLAT8154
SE 162ND ST
114TH AVE SESS SS SSWWWWWWWWWWWWWWWSS
JOB
SITE
316999-166523
25 kVA 120/240V
EXISTING 40T
SW #T______
NEW 40T
SW #T______
SITE PLAN
N
Vicinity Map
N/A
Owner / Developer Contact Info
officeATTN:
Sapphire Homes, Inc
16834 SE 43rd ST
Bellevue, WA 98006
Travis Kassebaum (206) 484-4321
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
STANDARD EASEMENT PROVISION
An easement is hereby reserved for and conveyed to Puget Sound Energy,
Inc., Telephone Co., Television Cable Co., and their respective successors
and assigns under and upon the private street(s), if any, and the exterior
ten (10) feet of all lots, tracts and spaces with in the plat lying parallel with
and adjoining all street(s) in which to construct, operate, maintain, repair,
replace and enlarge underground or ground-mounted appurtenances
thereto for the purpose of serving this subdivision and other property with
electric, gas, telephone and other utility service, together with the right to
enter upon the streets, lots, tracts and spaces at all times for the purposes
herein stated.105086971FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
GAS
PHONE
CABLE TV
N/A 101109015
N/A 108103767
N/A 593190248
N/A N/A
N/A N/A
N/A
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Perm. Service
Relocation
Removal
Temporary
Job Order
Distribution
HP Svc/MSA
SITE SPECIFIC NOTES
Phone
INTOLIGHT Contact Information:
N/A
N/A
SCHED.SQ. FT.
MAX LRC =
CIRCUIT FEET ADDED:
___ AMPS
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.THE CUSTOMER IS RESPONSIBLE FOR PROVIDING ALL TRENCHING, PER THE TRENCH
PROFILE, AND ALL EXCAVATIONS AT THE TRANSFORMER/HANDHOLE VAULT SITES
SUCH THAT PSE FACILITIES WILL MATCH FINAL GRADE. VAULT HOLES WILL HAVE
STABLE LEVEL BOTTOMS. CUSTOMER WILL PROVIDE 6" OF CRUSHED ROCK FOR
VAULT BEDDING. ALL TRENCHES WILL HAVE 6" OF WASHED SAND COVER AND 4"
BEDDING FOR ALL CONDUITS. THE CUSTOMER WILL PROVIDE SELECT BACKFILL, IF
REQUIRED, AND COMPACTION AS NECESSARY. THE CUSTOMER IS RESPONSIBLE FOR
DISPOSAL OF ALL NATIVE SPOILS NOT SUITABLE FOR USE AS BACKFILL. ALL
TRENCHES MAY BE JOINT WITH GAS, TELEPHONE AND TV CABLE.
ALL CABLES/CONDUITS TO BE INSTALLED IN CUSTOMER'S TRENCH AT THE DEPTH
INDICATED IN TRENCH DETAIL (DEPENDENT UPON SIZE OF CONDUIT BEING INSTALLED
TO MEET MIN 36" OF COVER). INSTALL CABLE ID TAGS AT EACH END OF THE PRIMARY
CABLES PER THE CIRCUIT ONE-LINE DIAGRAM.
UNLESS OTHERWISE SPECIFIED BY MUNICIPALITIES, INSTALL PVC (DB-120) ROAD
CROSSINGS AS INDICATED ON THE CROSSINGS CONDUIT TABLE & AS SHOWN ON
WORK SKETCH. CROSSINGS SHALL BE INSTALLED BY CUSTOMER/DEVELOPER PER
PUGET SOUND ENERGY STANDARDS.
AT SYMBOL: INSTALL UNDERGROUND PRIMARY CABLES IN
CONDUIT. CABLE LENGTH AND CONDUIT SIZE AS INDICATED ON PRIMARY CABLE &
CONDUIT TABLE.
AT SYMBOL: INSTALL 600 VOLT UG SECONDARY CABLES IN
CONDUIT. CABLE/CONDUIT SIZE AND LENGTH AS INDICATED ON SECONDARY CABLE &
CONDUIT TABLE.
AT SYMBOL: INSTALL MINI-PAD HANDHOLE & PADMOUNT TRANSFORMER.
ADDITIONAL EQUIPMENT AS INDICATED ON VAULT TABLE.
AT SYMBOL: INSTALL SECONDARY PEDESTAL/HANDHOLE W/ (3)
MULTI-CONNECTORS. SIZE AS INDICATED ON SECONDARY HH/PEDESTAL TABLE.
(EXCAVATION: 3' SQ.)
AT SYMBOL: INSTALL JUNCTION BOX HANDHOLE. ADDITIONAL EQUIPMENT AS
INDICATED ON VAULT TABLE.
AT SYMBOL: INSTALL SECONDARY CABLE & CONDUIT STUB-OUT.
AT SYMBOL: INSTALL STREET LIGHTING STANDARD. SIZE AND TYPE OF
STANDARD/LUMINARIE AS INDICATED ON STREET LIGHTING TABLE. (CUSTOMER TO
EXCAVATE & INSTALL CORRUGATED STREET LIGHT TUBES FOR PLACEMENT OF THE
STREET LIGHT STANDARDS. )
INCLEMENT WEATHER CONDITIONS MAY CAUSE DELAYS IN CONSTRUCTION TIMES
AND DATES.
POWER GENERAL NOTES - PLAT PROJECT
11.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:Dave Honeysett
(253) 245-0883
DAVID.HONEYSETT@PSE.COM
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
SCALE: 1" = 50'
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
Dave Honeysett (253) 245-0883 11/27/17
Nate Linville (253) 970-7284 11/27/17
N/A N/A N/A
Nate Linville (253) 970-7281
Required City of Renton
Cascade Greens 4 Lot Plat
1Ø PRIMARY LE, SET PM TRF, INST 2 - STUBS
11427 SE 162ND ST, RENTON, WA 98055
N/A N/A
N/A 105086971
AS NOTED 1 OF 2
KING N/A N/A CSPSKEPM
NE-29-23N-05E N/A N/A
2305E113 2305E136 2305E113 ROL-16
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
Service Stubs
105086971
N/A
N/A
505052286
N/A
AT P01: REPLACE
REMOVE EXISTING B/O 1981 40' DISTRIBUTION POLE
TRANSFER EXISTING 25kVA 1B TO NEW POLE
TRANSFER EXISTING LUMINAIRE TO NEW POLE (SLAT8154)
TRANSFER EXISTING 1Ø 1/0 TERMINATION TO NEW POLE
-INST. 1 - 45' CL2 DISTRIBUTION POLE PER STD 6010.1000 (PD452)
-INST. 1 - 9' 8P XARM
-INST. 1 PTP & INSULATOR
-INST. 2 - STEEL ARM PINS & INSULATORS
-INST. 1 - BOLTED STIRRUP & HOT CLAMP ON BØ
-INST. 1 - L/B C/O ON NEW FG ARM, FUSE AT 40T PER STD 6043.1000 (TSU1C1)
-INST. 1 - 12kV 1/0 SOL CS PIN TERMINATION PER STD 6041.3000 (TER10JC)
-INST. CABLE # BØ-EHO831
-INST. NEW SW #T______
-INST. 1 - 2" PRIMARY RISER ON EXISTING S/O BRKTS PER STD 6042.1000 (RIS2CSS)
EXISTING GRID 316999-166523
COMMUNICATIONS TO TRANSFER
AT V01: NEW
-INST. 1 - 36" X 42" X 38" UNI-STRUT MP HH W/21" X 24" ACCESS HOLE PER STD 6045.1010 (MINI1SR)
-INST .1 - 37.5kVA 120/240V PM TRANSFORMER
-INST. 1 - L/B ELBOW & 1 DUST CAP PER STD 6041.1000 (ELB10J)
-INST. 3 - #6-350KCMIL 6POS SEC CONNECTION BLOCKS W/5/8" STUD ADAPTER (MID: 4842002)
-INST. GRID 317002-166526
SPAN NOTES
SEE CABLE TABLE ON P2 FOR CABLE AND CONDUIT INFORMATION
DEVELOPER & CUSTOMER NOTES:
THE CUSTOMER IS RESPONSIBLE FOR PROVIDING ALL TRENCHING, SELECT BACKFILL,
COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS 6750.6500
-REQUIRED TO PROVIDE 6' X 6' WORK PIT & 1 CUBIC YARD OF 5/8" MINUS AT V01
-REQUIRED TO PROVIDE 4' X 4' WORK PIT & 1 CUBIC YARD OF 5/8" MINUS AT P01
-REQUIRED TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL
-REQUIRED TO PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS & TRENCH AT
ALL TIMES
-EXCAVATE & EXPOSE EXISTING PSE UG FACILITIES 48 HOURS PRIOR TO CONSTRUCTION
-PSE INSPECTION IS REQUIRED PRIOR TO FINAL BACKFILL
-PSE WILL NOT ENERGIZE FACILITIES UNTIL BACKFILL IS COMPLETE
-L&I INSPECTION & APPROVAL IS REQUIRED 72 HOURS PRIOR TO CONNECTION
-RESPONSIBLE FOR ALL TREE TRIMMING AND BRUSH CLEARING
OVERHEAD CIRCUIT MAP (2305E136)
SCALE: 6" = 1 MILE
UNDERGROUND CIRCUIT MAP (2305E136)
SCALE: 6" = 1 MILE
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
ROL-16
6/13/17
205 191 213
-3.36 -
205 194.36 213
9
0
°
60'150'140'150'PSE PROVIDED
1 - 2" SCH80 PVC CONDUIT
IN CUSTOMER TRENCH
PSE PROVIDED
2 - 3" DB120 CONDUIT
IN CUSTOMER TRENCH
316999-166523
25 kVA 120/240V
EXISTING 40T
SW #T______
NEW 40T
SW #T______
JOB
SITE
316999-166523
25 kVA 120/240V
EXISTING 40T
SW #T______
NEW 40T
SW #T______
397.5KCMIL ACSR
1 - 350KCMIL SEC TPLX
NEW
1 - 1/0 AL SOL PRIMARY
CABLE #BØ-EHO831
1 - 350KCMIL SEC TPLX
PRIMARY & SECONDARY CONDUIT DIAGRAM
N
Vicinity Map
N/A
Owner / Developer Contact Info
officeATTN:
Sapphire Homes, Inc
16834 SE 43rd ST
Bellevue, WA 98006
Travis Kassebaum (206) 484-4321 105086971FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
GAS
PHONE
CABLE TV
N/A 101109015
N/A 108103767
N/A 593190248
N/A N/A
N/A N/A
N/A
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Perm. Service
Relocation
Removal
Temporary
Job Order
Distribution
HP Svc/MSA
Phone
INTOLIGHT Contact Information:
N/A
N/A
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:Dave Honeysett
(253) 245-0883
DAVID.HONEYSETT@PSE.COM
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
SCALE: NONE
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
Dave Honeysett (253) 245-0883 11/27/17
Nate Linville (253) 970-7284 11/27/17
N/A N/A N/A
Nate Linville (253) 970-7281
Required City of Renton
Cascade Greens 4 Lot Plat
1Ø PRIMARY LE, SET PM TRF, INST 2 - STUBS
11427 SE 162ND ST, RENTON, WA 98055
N/A N/A
N/A 105086971
AS NOTED 1 OF 2
KING N/A N/A CSPSKEPM
NE-29-23N-05E N/A N/A
2305E113 2305E136 2305E113 ROL-16
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
Service Stubs
105086971
N/A
N/A
505052286
N/A
PRIMARY & SECONDARY CABLE DIAGRAM
SCALE: NONE
MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
OIL-FILLED EQUIPMENT
TRANSFORMER
APPROVED
AREA
COMBUSTIBLE BUILDING WALLS & ROOF10'
10'
10'
JOINT TRENCH DETAIL
Primary
Dirt Pile
Final Grade
24" Min
36"
Min Cover
Over Power
48"
Max
Depth
Final Backfill
Gas
4" Sand Bedding
Property Line
intercept (depth varies).
SidewalkCurb
Location of roof drain
48" Typical
Width may vary per
Number of Utilities
and Conduits
6" or 12" Min Sand Shading
Over Gas after Compaction
12" Min
R/W or
Excavated
12" Typical
Power
Secondary
Power
TV & TEL
NOTES:
1. If the final backfill contains rocks greater than 8 inches in diameter , install 12 inches compacted sand shading across the full width of the trench. *
If the final backfill contains rocks 8 inches in diameter or smaller , install 6 inches compacted sand shading across the full width of the trench. *
2. Rocks greater than 10 inches diameter are not permitted in the final backfill.
3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the
side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line.
4. Utilities shall not be stacked over the gas line in the trench.
5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements.
6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies.
* Alternatives to full-width trench shading require PSE approval.
12" Min
12" Min
Separation
4,5
1,2
1
3
6
6" or 12" Min Sand Shading
Over Power after Compaction1
Primary & Secondary-Mainline Gas & Communications (NTS)
TOP VIEW
SIDE
VIEW
EXCAVATION:
4-2/3 CUBIC YARDS
Rock
Crushed
6"
3'-6"
2"
6'
6'
48"42"
36"
38"
42"
Struts
FRONT
FRONTTRANSFORMER EXCAVATION DETAIL AT V01
SCALE: 6" = 1 MILE
MINIMUM CLEARANCES FROM OIL-FILLED EQUIP. TO BLDG. FEATURES
NOT TO SCALE
FIRE ESCAPE
SERVICE
GAS
RELIEF
DOOR, WINDOW, VENT,
OR OTHER OPENING
TANK
FUEL VENT OIL-FILLED
ELECTRICAL
EQUIPMENT
SPRINKLER VALVE,
STANDPIPE, OR
HYDRANT
20'
3'
10'
6'
10'
(TRANSFORMER)
PRIMARY CABLE & CONDUIT TABLE
LOCATION CONDUIT PRIMARY CABLE
ASBUILT INFORMATION
SIZE Qty LENGTH
Design
(ft)
BENDS PULL PULL Cable LENGTH
Design
(ft)
Cable Numbers Please Record Foreman - Complete
FROM TO (in)90°45°22°11°(lbs)
Rev
(lbs)Size A B C Manufacturer Compound Year Actual Amount Installed (Conduit & Cable)
P01 V01 1 2 210 2 0 0 0
PRI 12KV
1/0 UG 250 -EHO831 -
SECONDARY CABLE & CONDUIT TABLE
LOCATION CABLE Assumed
Lot Corner
CONDUIT VOLTAGE
DROP
VOLTAGE
FLICKER ASBUILT INFORMATION
SIZE LENGTH
Design
(ft)
SIZE LENGTH
Design
(ft)
BENDS
Foreman - Complete
FROM TO (1/0,4/0,350)to Meter(ft)(in)90°45°22°11°(Percent)(Percent)Actual Amount Installed (Conduit & Cable)
V01 LOT 3 4/0 UG TPX 160 40 3 140 1 0 0 0 1.6%3.7%
V01 LOT 4
350KCMIL UG
TPX 170 40 3 150 1 0 0 0 1.5%3.2%
CROSSINGS CONDUIT TABLE
X-ING
NO.
LOCATION GAS POWER Length
Remarks (type of crossing)
SIZE Type Qty Location SIZE Type Qty
(Primary, Feeder, Secondary, St.
FROM TO (in)sched each N-S-E-W (in)sched each (ft)Light, Gas Only, etc.)
X01 P01 V01 2 DB120 2 60 PRIMARY
60'= 2" SCH80 GREY PVC (ft)
0 = 3" DB120 GREY PVC (ft)
0 = Total 2" PVC Plug / Caps
0 = Total 3" PVC Plug / Caps
Total Glue = 0.5 Qts Total E 60'
COOLING
5' MIN
5' MIN
10' MIN
5'
MIN
FINS
ACCESS
CONCRETE PAD
MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
CURB OR EDGE OF PAVEMENT
CURB OR EDGE OF PAVEMENT
5' MIN
ROAD OR
PARKING AREA
TYP. PAD
& TRANS-
FORMER
3'
MIN
3' MIN
3' MIN
DOOR
ACCESS
DOOR
REQUIRED
WORK SPACE
AREA