Loading...
HomeMy WebLinkAboutP_Design_105087168_V1_17122160' SITE CELLACCESS RD / DWY25kVA 120/240v 600 SW 10TH ST CUSTOMER SUPPLIED 6' X 6' WORK PIT 1-2" SCH'L 80 PVC CONDUIT ± 35' INST. 1-RUN 1/0 UG JKT CABLE ± 50' (AØEHR202) CUSTOMER SUPPLIED 4' X 4' WORK PIT CUSTOMER SUPPLIED 2/3 CUBIC YARDS OF 6” CRUSHED ROCK CUSTOMER SUPPLIED TRENCH ACCESS RDSITE PLAN N Vicinity Map N/A Owner / Developer Contact Info officeATTN: T-MOBILE WEST CORPORATION PO BOX 18325 COLUMBUS , OH 43218 HOLLY CAMP 425-931-5868 ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.105087168FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. GAS PHONE CABLE TV PROJECT PHASE PWR NOTIF#ORDER# Superior E-Mail: Cell Phone: Project Manager Contact Information: Manager:DAVE HONEYSETT 253-245-0883 DAVE.HONEYSETT@PSE.COM PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" SCALE: 1" = 50' THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP D. HONEYSETT 253-245-0883 12/05/17 D. HONEYSETT 253-245-0883 12/05/17 T. MYER (714) 893-2405 12/05/17 REQUIRED RENTON RAINIER AVE CROWN INSTALL TRANSFORMER - NO SERVICE 600 SW 10TH ST, RENTON, WA 98055 N/A N/A N/A 105087168 AS NOTED 1 OF 1 KING N/A N/A CSPSKEIN NW 19-23N-05E N/A N/A 2305E074 2305E076 2305E074 EAR-16 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 105087168505108232 SITE SPECIFIC NOTES AT J01: 317527-165598 -EXISTING J-BOX TO REMAIN AT V01: 317523-165598 -INSTALL 36" X 42" MP HH & GRNDS (MINI15S) PER STD 6045.1000 ,167$//.9$‘975) 0,' -INSTALL (1) L/B ELBOW (ELB10J) PER STD 6041.1000 -INSTALL (1) DUST CAP (MID: 7630600) -INSTALL 3-#6-350 KCMIL SEC CONN BLOCKS (MID: 4842002) -INSTALL GRID #317523-165598 CUSTOMER & DEVELOPER NOTES THE CUSTOMER IS RESPONSIBLE TO PROVIDE ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS 6750.6500 5(48,5('723529,'( ,167$//´12132/<38//523(,1$//&21'8,76 -REQUIRED TO PROVIDE 4' X 4' WORK PIT AT J01 -REQUIRED TO PROVIDE 6' X 6' WORK PIT &8%,&<$5'62)´&586+('52&. AT V01 -REQUIRED TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL -REQUIRED TO PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS & TRENCH AT ALL TIMES -REQUIRED TO EXCAVATE & EXPOSE EXISTING PSE UG FACILITIES 48 HOURS PRIOR TO CONSTRUCTION -PSE INSPECTION IS REQUIRED PRIOR TO FINAL BACKFILL -PSE WILL NOT ENERGIZE FACILITIES UNTIL BACKFILL IS COMPLETE -RENTON INSPECTION & APPROVAL IS REQUIRED 5 BUSINESS DAYS PRIOR TO CONNECTION SPAN SPECIFIC NOTES J01 TO V01: 36(72,167$//6&+ /39&&21'8,7“ 36(72,167$//5818*-.7&$%/(“ 36(72,167$//&$%/(7$* $‘(+5 TOP VIEW SIDE VIEW EXCAVATION: 4-2/3 CUBIC YARDS Rock Crushed 6" 3'-6" 2" 6' 6' 48"42" 36" 38" 42" VAULT & EXCAVATION DETAIL Not to scale 6045.1000 1950 lbs 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. 2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. 3.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. 4.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. 5.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. 6.Roads shall be paved or have a compacted , crushed rock base in place. 7.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. 8.All work is to be done in accordance with local municipal and county permit requirements as applicable. 9.Inclement weather conditions may cause delays in construction times and dates. 10.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. POWER GENERAL NOTES - COMMERCIAL PROJECT CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE EAR-16 06/2017 317.00 324.00 322.00 2.03 0.00 0.00 319.03 324.00 322.00 OVERHEAD CIRCUIT MAP 2305E076 SCALE: 6" = 1 MILE CIRCUIT FEET ADDED: 35' PANEL SIZE: 200A HEAT TYPE: ELECTRIC EST. DEMAND: 12KW NEW CABLE & CONDUIT DIAGRAM NOT TO SCALE JOB SITE JOB SITE ASPLUNDH CONSTRUCTION CORP. EAR 16 1000kVA 277/480v PARCEL # 2146000050 SENECA AVE SWInstalled at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: V01 317523-165598 25kVA 6247000 PRIMARY CABLE & CONDUIT TABLE LOCATION CONDUIT CABLE ASBUILT INFORMATION - FOREMAN COMPLETE FROM TO SIZE (IN)QTY. DESIGN LENGTH (FT) BENDS PULL (LBS) PULL REV (LBS) CABLE SIZE DESIGN LENGTH (FT) PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED 90°45°22°11°A B C MANUFACTURER COMPOUND YEAR NOTES CONDUIT CABLE J01 V01 2 1 35 50 46 1/0AL JKT 50'EHR202 - 2" PVC (FT) & BENDS =0 0 0 0 1/0 AL JKT TOTAL (FT) =50' Excavated Dirt Pile Final Grade 24" Min Backfill for Schedule 40 Conduit (NO Rocks over 10" Diameter or foreign objects)Separation 12" Min 18" Min JOINT TRENCH DETAIL Primary-Schedule 40 (NTS) 48" Max 36" Min Cover Phone & TV Primary Power Cable in Customer Provided Schedule 40 Conduit ROADSIDE To Excavated Dirt Pile