HomeMy WebLinkAboutP_Design_104297309_V1_171221PARCEL #
1323049093
EAR
17
156
OAKSDALE AVE SW25kVA 120/240v
31'
30'
DWY
BORE REQ'D
85'CUSTOMER SUPPLIED
4' X 4' WORK PIT
3/4" CUBIC YARD SAND
CUSTOMER SUPPLIED
CUSTOMER SUPPLIED
4' X 4' WORK PIT
BORE REQUIRED BY CITY OF RENTON ± 85'
CUSTOMER INSTALLED
1-3" SCH'L 80 PVC CONDUIT ± 12'
1-RUN 350 UG TPX ± 155'
CUSTOMER SUPPLIED
PSE TO INSTALL
1-3" SCH'L 80 PVC CONDUIT ± 43'
CUSTOMER SUPPLIED
N
Vicinity Map
NTS
Owner / Developer Contact Info
officeATTN:
WEST PACIFIC DEVELOPMENT LLC
4957 LAKEMONT BLVD SE, C4-323
BELLEVUE, WA 98006
JACK ZHENG (425) 442-9628
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.104297309FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
GAS
PHONE
CABLE TV
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Perm. Service
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:DAVE HONEYSETT
(253) 245-0883
DAVE.HONEYSETT@PSE.COM
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
D. HONEYSETT (253) 245-0883 12.05.17
D. HONEYSETT (253) 245-0883 12.05.17
N. PETTIE (714) 893-2405 12.05.17
REVIEW RENTON
WEST PACIFIC DEVELOPMENT LLC
SIMPLE SERVICE W/ RENTON PERMITS
156 OAKSDALE AVE SW, RENTON, WA 98057
N/A N/A
N/A 104297309
AS NOTED 1 OF 1
KING COUNTY N/A N/A CSPSKEIN
NE 13-23N-04E N/A N/A
2304E049 2305E076 2304E049 EAR-17
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
104297309504577725
SITE SPECIFIC NOTES
AT V01: 317904-165461
HEAVY TRIMMING REQ'D
-EXISTING VAULT TO REMAIN
AT M01: NEW METER BASE
-INSTALL 200A METER
CUSTOMER & DEVELOPER NOTES
THE CUSTOMER IS RESPONSIBLE TO PROVIDE ALL TRENCHING, SELECT BACKFILL, COMPACTION &
RESTORATION PER PUGET SOUND ENERGY STANDARDS 6750.6500
5(48,5('723529,'( ,167$//´6&+('8/(39&&21'8,7)520V01-M01 +/- 140'
5(48,5('723529,'( ,167$//´12132/<38//523(,1$//&21'8,76
-REQUIRED TO PROVIDE 4' X 4' WORK PIT AT V01
5(48,5('723529,'(¶;¶:25.3,7 &8%,&<$5'2)6$1'$7M01
-REQUIRED TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL
-REQUIRED TO PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS & TRENCH AT ALL TIMES
-REQUIRED TO EXCAVATE & EXPOSE EXISTING PSE UG FACILITIES 48 HOURS PRIOR TO CONSTRUCTION
-PSE INSPECTION IS REQUIRED PRIOR TO FINAL BACKFILL
-PSE WILL NOT ENERGIZE FACILITIES UNTIL BACKFILL IS COMPLETE
-RENTON INSPECTION & APPROVAL IS REQUIRED 5 BUSINESS DAYS PRIOR TO CONNECTION
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch
must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working
days in advance.
3.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the
underground facilities located.
4.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch
and details for locations. Equipment locations must be approved by the Project Manager.
5.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which
would restrict construction and/or equipment access, before work can begin.
6.Roads shall be paved or have a compacted , crushed rock base in place.
7.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls,
overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE
standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in
the right of way, and at least 1 foot when crossing them.
8.All work is to be done in accordance with local municipal and county permit requirements as applicable.
9.Inclement weather conditions may cause delays in construction times and dates.
10.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this
sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and
24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope
the trench to 1:1.
POWER GENERAL NOTES - RESIDENTIAL PROJECT
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
EAR-17
12/2017
185.00 158.00 190.00
0.00 0.00 1.32
185.00 158.00 191.32
OVERHEAD CIRCUIT MAP 2305E076
SCALE: 6" = 1 MILE
CIRCUIT FEET ADDED: 0'
SQ. FOOTAGE: 2,708 SQ FT
PANEL SIZE: 200A
HEAT TYPE: GAS
EST. DEMAND: 9kW
LRC: 115A
% V. DROP: 2.2%
% FLICKER: 3.9%
NEW CABLE & CONDUIT DIAGRAM
NOT TO SCALE
JOB SITE
JOB SITE
ASPLUNDH CONSTRUCTION CORP.
TRENCH DETAIL
Electric Service Cable in Conduit (NTS)
Electric Service Cable in Conduit
Excavated Dirt Pile
Final Grade
24" Min
24" Minto36" MaxCover12" Typical
(6" Min)Backfill for ConduitFree of rockslarger than 8"in diameter)36" MINIMUM COVER
IN RIGHT OF WAY
To Excavated Dirt Pile
3" Schedule 80 Grey PVC
Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris,
glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.
SPAN SPECIFIC NOTES
X01:
%25(5(48,5('%<&,7<2)5(1721
V01 TO X01:
&86720(572,167$//*5(<6&+
/&21'8,7
X01 TO M01:
&86720(572,167$//*5(<6&+
/&21'8,7
V01 TO M01:
,167$//5812)8*73;
METER DETAIL @ M01
SCALE: NONE
32"
Typical
24"
Min
24"-36"
4'Top View
Electric & Joint Utility
Work Pit Dimensions
36"
Min
Drainage Pipe
12" Minimum Clearance
from Gas Service Lines
Conduit Depth
24" to 36" Max
Regulator
Gas Meter
Assembly
48"
4'8"
Service (Permanent Detail:)
Not to Scale
Conduit
Ends
Closed
4'8"
24" Min
36" Typical
3'
To Trench
Property Line
Conduit Stakes
Customer Provided
3" Schedule 40 Grey PVC
Power Cable Conduit
Customer Provided
Gas Service Line Conduit
Sch 40 White PVC
Customer Provided
3" Conduit Service Riser
Customer Provided
Elec. Mtr Base
Elec Mtr
utility provided
Gas Meter
Relief Vent
Building Wall
Elec. Mtr
Vent
Utility
Provided
Seal
24"-36"
SITE PLAN
SCALE: 1" = 50'
90°
90°