HomeMy WebLinkAboutMFP18000013DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP18000013
IVR Number: 18000013
Permit Informa!on
Permit Name:BLANKET PERMIT - PSE (Bare Poles)
Address/Loca!on:01/02/2018Applica!on Date:Parcel Number:VARIOUS LOCATIONS IN RENTON CITY LIMITS
Permit Type :01/09/2018Issue Date:Franchise
Permit Work Class:12/31/2018Expira!on Date :Major U)lity
Job Number:Blanket PermitFranchise Type :Electric
Inspector:Brad Stocco 425-282-2373
Descrip!on:2018 PERMIT TO REMOVE BARE POLES ONLY . SOME TRANSFER WORK IF NECESSARY TO REMOVE POLES . TRAFFIC
CONTROL PLAN REQUIRED . WORK UNDER THIS PERMIT MUST BE CALLED IN AT JOB START (425) 430 7203.
Contacts
Name Address PhoneTypeBilling
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC - BILLING
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183ApplicantX
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: BL.005109Electrical Contractor : POTELI*344O4
Construc!on Contractor : POTELI*227PL
General Condi!ons & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES