Loading...
HomeMy WebLinkAboutMFP18000013DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP18000013 IVR Number: 18000013 Permit Informa!on Permit Name:BLANKET PERMIT - PSE (Bare Poles) Address/Loca!on:01/02/2018Applica!on Date:Parcel Number:VARIOUS LOCATIONS IN RENTON CITY LIMITS Permit Type :01/09/2018Issue Date:Franchise Permit Work Class:12/31/2018Expira!on Date :Major U)lity Job Number:Blanket PermitFranchise Type :Electric Inspector:Brad Stocco 425-282-2373 Descrip!on:2018 PERMIT TO REMOVE BARE POLES ONLY . SOME TRANSFER WORK IF NECESSARY TO REMOVE POLES . TRAFFIC CONTROL PLAN REQUIRED . WORK UNDER THIS PERMIT MUST BE CALLED IN AT JOB START (425) 430 7203. Contacts Name Address PhoneTypeBilling ANISH KUMAR PUGET SOUND ENERGY - ELECTRIC - BILLING 6905 S 228th St Kent, WA 98032 B: (253) 208-2183ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: BL.005109Electrical Contractor : POTELI*344O4 Construc!on Contractor : POTELI*227PL General Condi!ons & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES