HomeMy WebLinkAboutP_Design_143003399_V1_180109SITE PLAN SCALE: 1/100 0 S1_C138_R0010 SCOPE OF WORK - INSTALL NEW 120/240V POWER SUPPLY FOR AMI NETWORK SITE SPECIFIC NOTES V01 (316709 - 165410) -PROPOSED HEIGHT 46" - PROPOSED LOCATION RELATIVE TO TRANSFORMER IS 24" NORTH - INSTALL NEW AMI NETWORK UNIT PER STANDARD 0700.8525 AS SHOWN IN PEDESTAL CONNECTION DETAIL PEDESTAL CONNECTION DETAIL 20° COVER If=_— GAP COLLECTOR It II ROUTER UNIT II I II II II PAUMOUNT II II TRANSFORMER n n n I n II I n �a• u I n n n 25 0 u n BASE HANOHOLE *4CU GROUND WIRE V FLEX CONDUIT 8'GROUND ROD FOR POWER PEDESTAL HOUSING FRONT VIEW PEDESTAL HOUSING UNIT CONTAINS GAP COLLE CTORIROUTER UNIT. IT SHALL BE MOUNTED BEHIND THE FRONT HALF OF THE TRANSFORMER 14" PADMOUNT TRANSFORMER MIN CLEARANCE CLEAR WORIUNG FRONT SPACE TOP VIEW SYMBOL LEGEND FOR POWER ❑0 EXISTING PADMOUNT TRANSFORMER a NEW PADMOUNT TRANSFORMER S❑ .......................................................................................................... .......................................................................................... NEW PEDESTAL . 316719-165411 EXISTING PSE POLE 0 NEW PSE POLE X 02220 A - - - kJRknowR- - N/A EXISTING SECONDARY SERVICE 1 s316719-165412 NEW TRENCHING — — — — — — NEW OVERHEAD CONDUCTOR CABLE TV i........................................................................................ DRAWN BY C. WESTERFIELD PHONE 9/29/17 CHECKED BY K. WAKUMOTO (503) 892-6828 ti.....W..: p.., n....................................................................................................................................................................... .......... ........................................................................................................................................................................................................................................................................................................ OP MAP N/A PLAT MAP N/A APPROVED BY N/A N/A ............................................................................................................................................................................................ C! N/A U -MAP NO (POWER) 2304-E-100 316718-165431 UG CKT MAP 2304-E-100 �CIRCUITNO RJN-27 FOREMAN #2 N/A SW 34TH ST N/A MAPPING N/A N/A / JOINT FACILITIES ARRANGEMENTS 04-165398 316710-16541 1� D ) J+ N/A o CONTACT N/A N/A 316709-16540g.' 316709-165410 N/A PHONE# I25kVA 1201240v i. ....................... N/A N/A PUGET SOUND AMI NETWORK UNIT 1001 SW 34th St ENERGY Renton, WA DESIGNED BY N/A �'1 POWER =� ENGINEERS 316700-165426 1 MOM 1201208v ...............................................................................................................................................0 1001 2 > a w a CI W 316654-165411 Y Q 0 SITE PLAN SCALE: 1/100 0 S1_C138_R0010 SCOPE OF WORK - INSTALL NEW 120/240V POWER SUPPLY FOR AMI NETWORK SITE SPECIFIC NOTES V01 (316709 - 165410) -PROPOSED HEIGHT 46" - PROPOSED LOCATION RELATIVE TO TRANSFORMER IS 24" NORTH - INSTALL NEW AMI NETWORK UNIT PER STANDARD 0700.8525 AS SHOWN IN PEDESTAL CONNECTION DETAIL PEDESTAL CONNECTION DETAIL 20° COVER If=_— GAP COLLECTOR It II ROUTER UNIT II I II II II PAUMOUNT II II TRANSFORMER n n n I n II I n �a• u I n n n 25 0 u n BASE HANOHOLE *4CU GROUND WIRE V FLEX CONDUIT 8'GROUND ROD FOR POWER PEDESTAL HOUSING FRONT VIEW PEDESTAL HOUSING UNIT CONTAINS GAP COLLE CTORIROUTER UNIT. IT SHALL BE MOUNTED BEHIND THE FRONT HALF OF THE TRANSFORMER 14" PADMOUNT TRANSFORMER MIN CLEARANCE CLEAR WORIUNG FRONT SPACE TOP VIEW SYMBOL LEGEND FOR POWER ❑0 EXISTING PADMOUNT TRANSFORMER a NEW PADMOUNT TRANSFORMER S❑ PADMOUNT SWITCH 0 NEW PEDESTAL O EXISTING PSE POLE 0 NEW PSE POLE X REMOVED PSE POLE A POLE MOUNTED TRANSFORMER N/A EXISTING SECONDARY SERVICE — NEW TRENCHING — — — — — — NEW OVERHEAD CONDUCTOR GENERAL NOTES - ALL WORK IS TO BE COMPLETED PER PSE STANDARDS & PRACTICES. COPIES OF ALL PSE STANDARDS ARE AVAILABLE UPON REQUEST. - WORK SITES SHALL BE KEPT CLEAR OF DEBRIS AND ALL CONSTRUCTION MATERIALS, EQUIPMENT AND PACKING SHALL BE REMOVED DAILY. - RETURN ALL UNUSED AND REMOVED POLES, TRANSFORMERS AND HARDWARE TO PSE, STOREROOM. ALL COPPER SHALL BE COILED AND RETURNED THE DAY IT IS REMOVED FROM THE POLES. REMOVE ALL UNUSED PINS AND INSULATORS. - RETURN ALL STREET LIGHTS, AREA LIGHTS AND FLOODLIGHTS TO PSE. - PROVIDE FOR EROSION AND SEDIMENT CONTROL PER PSE STANDARD 0150.3200 AND ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. PRECONSTRUCTION - NOTIFY APPROPRIATE CITY, COUNTY OR DOT AUTHORITIES 48 TO 72 HOURS, OR AS REQUIRED BY PERMITTING AGENCY, IN ADVANCE OF STARTING WORK IN RIGHT-OF-WAY INVOLVING A PERMIT. - ALL SYSTEM SWITCHING SHALL BE APPROVED BY SYSTEM OPERATIONS A MINIMUM OF 48 HOURS IN ADVANCE. - NOTIFY CUSTOMERS OF ALL OUTAGES 48 HOURS IN ADVANCE. WORK DRAWINGS AND DOCUMENTS - FIELD DESIGN CHANGES SHALL BE APPROVED BY PSE PROJECT MANAGER OR ENGINEER. - MARK ALL FIELD CHANGES, EQUIPMENT ID NUMBERS AND UNDERGROUND CABLE INFORMATION IN RED ON FOREMAN'S COPY OF WORKSKETCH. - RETURN ONE FOREMAN'S COPY OF WORKSKETCH TO PROJECT MANAGER AT COMPLETION OF JOB. - WHEN PERMITS ARE REQUIRED, A COPY SHALL BE AVAILABLE ON WORK SITE AT ALL TIMES. SAFETY REFER TO PSE STANDARDS 6275.3000 AND 6275.6000 FOR SYSTEM GROUND REQUIREMENTS. REFER TO PSE STANDARDS 6275.9050 FOR PERSONAL PROTECTIVE GROUNDING REQUIREMENTS. - REFER TO PSE STANDARDS 6275.9150 FOR VEHICLE GROUNDING AND BARRICADING REQUIREMENTS. - PROPER LINE CLEARANCES SHALL BE TAKEN AT THE BEGINNING, AND RELEASED AT THE END, OF EACH WORK DAY, OR AS OTHERWISE INSTRUCTED BY THE SYSTEM OPERATOR. - PROVIDE SIGNS, BARRICADES, AND TRAFFIC CONTROL IN CONFORMANCE WITH PERMIT REGULATIONS. - UTILIZE FLAGGING AND OTHER VEHICLE TRAFFIC CONTROL AS NECESSARY AND IN CONFORMANCE WITH LOCAL TRAFFIC REGULATIONS. - MAINTAIN TRAFFIC FLOW AS REQUIRED BY PERMITTING AGENCY. JOINT FACILITIES - COORDINATE WITH COMMUNICATION COMPANIES FOR TRANSFERS. UNDERGROUND CONSTRUCTION CONDUIT INSTALLATION - ALL PSE CONDUIT INSTALLATIONS SHALL CONFORM TO PSE STANDARDS 6800.6000, 6800.6050, 6800.8050, AND 6825.6505. - ALL CONDUITS ENTERING PSE VAULTS SHALL BE THROUGH THE APPROPRIATE KNOCKOUTS TO ENSURE PROPER CABLE LAY. VAULT ENTRIES SHALL NOT CAUSE CABLES TO CROSS EACH OTHER IN THE VAULT, OR LAY IN THE VAULT UNEVENLY. - ALL CONDUITS ENTRIES INTO PSE VAULT SHALL BE STRAIGHT AND LEVEL WITH A MINIMUM OF 2' STRAIGHT SECTION OUTSIDE THE VAULT WALL AND 2" ON CONDUIT EXTENDING INTO THE VAULT WITH BELL ENDS INSTALLED. - PSE CONDUITS SHALL BE PLACED IN THE TRENCH MAINTAINING A MINIMUM OF 1-1/2" OF SEPARATION. - PSE CONDUIT RUNS SHALL BE PLACED STRAIGHT AND LEVEL. SHOULD IT BECOME NECESSARY TO ALTER CONDUIT ALIGNMENTS TO AVOID OTHER UTILITIES THE MAXIMUM BEND RADIUS ALLOWED IS 22-1/2 DEGREES. BEND RADIUS GREATER THAN 22-1/2 DEGREES REQUIRE PRIOR APPROVAL FROM PSE ENGINEERING REPRESENTATIVES. - ALL PSE CONDUITS SHALL BE PLACED WITH THE MINIMUM SEPARATION BETWEEN OTHER UTILITY FACILITIES AS SPECIFIED IN PSE STANDARD 6790.0130. - ALL PSE CONDUITS SHALL HAVE A MINIMUM OF 36" OF COVER. COVER OF LESS THAN 36" IS PERMISSIBLE ON A CASE BY CASE BASIS PROVIDED THAT SUCH INSTALLATIONS ADHERE TO PSE STANDARD 6790.0130 FIGURE 2. PRE -APPROVED BY PSE ENGINEERING REPRESENTATIVES IS REQUIRED. TRENCH & EXCAVATION - PSE OR IT'S CONTRACTOR SHALL PROVIDE ALL TRENCH EXCAVATION AND BACKFILL FOR THE INSTALLATION OF NEW OR MODIFIED PSE UNDERGROUND DISTRIBUTION SYSTEM WITHIN THE CONSTRUCTION AREA. - ALL TRENCH EXCAVATION AND BACKFILL SHALL CONFORM TO PSE STANDARDS 6790.0075, 6790.0130, 6790.0140, AND 6790.3050. - 6" BASE OF CRUSHED ROCK TO PREVENT VAULT SETTLING. FOREMAN (CHECK BOX WHEN COMPLETED) ❑ PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. ❑ Grid, Cable, and Switch numbers INSTALLED & VERIFIED. ❑ Field Changes RED -LINED on As -built. ❑ Material VERIFIED and CHANGES noted on Paperwork. ❑ Total PRIMARY Cable noted on As -built. ❑ Company ID#'s RECORDED in correct location on As -built. ❑ Indicate correct FUSE SIZE on As -built & VERIFY proper PHASE. ❑ Deviations noted on the As -built and their reason. ❑ I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. Foreman's Signature Print Name Date PROJECT PHASE NOTIF# ORDER# PWR Superior Perm. Service Relocation Removal Temporary Job Order N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A GAS Distribution HP Main HP Svc/MSA N/A N/A N/A N/A N/A N/A CABLE TV POWER WK CTR N/A DRAWN BY C. WESTERFIELD PHONE 9/29/17 CHECKED BY K. WAKUMOTO (503) 892-6828 Project Manager Contact Information: Manager: Patima Dejarath Cell Phone: (425) 456-2654 E -Mail: patima.dejarath@pse.com Vicinity Map N/A Owner/ Developer Contact Info N/A N/A N/A ATTN: N/A N/A office For contacts below dial 1 -888 -CALL PSE (225-5773) CALL (800) 424-5555 Developer Yes x Yes x PSE "Locates Required" No No "Outages Required" Yes No x "Flagging Required" Yes No X 2 BUSINESS DAYS BEFORE YOU DIG THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES REAL ESTATE/EASEMENT PERMIT Required City of Renton 3 9/29/2017 KAW 100% SUBMITTAL FUNCTION CONTACT PHONE NO DATE 2 9/15/2017 KAW 90% REVIEW PROJECT MGR P. DEJARATH (425) 456-2654 9/29/17 1 5/31/2017 KAW 90% REVIEW ENGR - POWER B. HENNESSEY (503) 892-6820 9/29/17 REV# DATE BY DESCRIPTION ENGR - GAS N/A N/A N/A COUNTY King Emer Sect Gas Wk Ctr N/A N/A POWER WK CTR N/A DRAWN BY C. WESTERFIELD (503) 892-6820 9/29/17 CHECKED BY K. WAKUMOTO (503) 892-6828 9/29/17 1/4 SEC Sec S25 T 23 R 04E OP MAP N/A PLAT MAP N/A APPROVED BY N/A N/A N/A FOREMAN #1 N/A N/A N/A U -MAP NO (POWER) 2304-E-100 OH CKT MAP 2305-E-124 UG CKT MAP 2304-E-100 �CIRCUITNO RJN-27 FOREMAN #2 N/A N/A N/A MAPPING N/A N/A N/A JOINT FACILITIES ARRANGEMENTS UTILITIES N/A N/A N/A N/A CONTACT N/A N/A N/A N/A PHONE# N/A N/A N/A N/A PUGET SOUND AMI NETWORK UNIT 1001 SW 34th St ENERGY Renton, WA DESIGNED BY N/A �'1 POWER =� ENGINEERS INCIDENT MAOP N/A N/A Gas GasElect Order 14 PAGE 9 SCALE N/A 1/1