HomeMy WebLinkAboutP_Design_143003399_V1_180109SITE PLAN
SCALE: 1/100
0
S1_C138_R0010
SCOPE OF WORK
- INSTALL NEW 120/240V POWER SUPPLY FOR AMI NETWORK
SITE SPECIFIC NOTES
V01 (316709 - 165410)
-PROPOSED HEIGHT 46"
- PROPOSED LOCATION RELATIVE TO TRANSFORMER IS
24" NORTH
- INSTALL NEW AMI NETWORK UNIT PER STANDARD
0700.8525 AS SHOWN IN PEDESTAL CONNECTION DETAIL
PEDESTAL
CONNECTION DETAIL
20°
COVER
If=_—
GAP COLLECTOR It II
ROUTER UNIT II I II
II II PAUMOUNT
II II TRANSFORMER
n n
n I n
II I n �a•
u I n
n n 25
0
u n
BASE
HANOHOLE
*4CU GROUND WIRE V FLEX CONDUIT
8'GROUND ROD FOR POWER
PEDESTAL HOUSING
FRONT VIEW
PEDESTAL HOUSING UNIT CONTAINS
GAP COLLE CTORIROUTER UNIT. IT
SHALL BE MOUNTED BEHIND THE
FRONT HALF OF THE TRANSFORMER
14"
PADMOUNT
TRANSFORMER
MIN
CLEARANCE
CLEAR
WORIUNG FRONT
SPACE
TOP VIEW
SYMBOL LEGEND FOR POWER
❑0
EXISTING PADMOUNT TRANSFORMER
a
NEW PADMOUNT TRANSFORMER
S❑
..........................................................................................................
..........................................................................................
NEW PEDESTAL
. 316719-165411
EXISTING PSE POLE
0
NEW PSE POLE
X
02220
A
- - - kJRknowR- -
N/A
EXISTING SECONDARY SERVICE
1 s316719-165412
NEW TRENCHING
— — — — — —
NEW OVERHEAD CONDUCTOR
CABLE TV
i........................................................................................
DRAWN BY C. WESTERFIELD
PHONE
9/29/17
CHECKED BY K. WAKUMOTO (503) 892-6828
ti.....W..: p.., n.......................................................................................................................................................................
..........
........................................................................................................................................................................................................................................................................................................
OP MAP
N/A
PLAT MAP
N/A
APPROVED BY N/A
N/A
............................................................................................................................................................................................
C!
N/A
U -MAP NO (POWER)
2304-E-100
316718-165431
UG CKT MAP
2304-E-100
�CIRCUITNO
RJN-27
FOREMAN #2 N/A
SW 34TH ST
N/A
MAPPING N/A N/A
/
JOINT FACILITIES ARRANGEMENTS
04-165398
316710-16541
1�
D
)
J+
N/A
o
CONTACT
N/A N/A
316709-16540g.' 316709-165410
N/A
PHONE#
I25kVA 1201240v
i. .......................
N/A
N/A
PUGET
SOUND AMI NETWORK UNIT
1001 SW 34th St
ENERGY Renton, WA
DESIGNED BY N/A
�'1 POWER
=� ENGINEERS
316700-165426
1
MOM 1201208v
...............................................................................................................................................0
1001
2
>
a
w
a
CI
W
316654-165411
Y
Q
0
SITE PLAN
SCALE: 1/100
0
S1_C138_R0010
SCOPE OF WORK
- INSTALL NEW 120/240V POWER SUPPLY FOR AMI NETWORK
SITE SPECIFIC NOTES
V01 (316709 - 165410)
-PROPOSED HEIGHT 46"
- PROPOSED LOCATION RELATIVE TO TRANSFORMER IS
24" NORTH
- INSTALL NEW AMI NETWORK UNIT PER STANDARD
0700.8525 AS SHOWN IN PEDESTAL CONNECTION DETAIL
PEDESTAL
CONNECTION DETAIL
20°
COVER
If=_—
GAP COLLECTOR It II
ROUTER UNIT II I II
II II PAUMOUNT
II II TRANSFORMER
n n
n I n
II I n �a•
u I n
n n 25
0
u n
BASE
HANOHOLE
*4CU GROUND WIRE V FLEX CONDUIT
8'GROUND ROD FOR POWER
PEDESTAL HOUSING
FRONT VIEW
PEDESTAL HOUSING UNIT CONTAINS
GAP COLLE CTORIROUTER UNIT. IT
SHALL BE MOUNTED BEHIND THE
FRONT HALF OF THE TRANSFORMER
14"
PADMOUNT
TRANSFORMER
MIN
CLEARANCE
CLEAR
WORIUNG FRONT
SPACE
TOP VIEW
SYMBOL LEGEND FOR POWER
❑0
EXISTING PADMOUNT TRANSFORMER
a
NEW PADMOUNT TRANSFORMER
S❑
PADMOUNT SWITCH
0
NEW PEDESTAL
O
EXISTING PSE POLE
0
NEW PSE POLE
X
REMOVED PSE POLE
A
POLE MOUNTED TRANSFORMER
N/A
EXISTING SECONDARY SERVICE
—
NEW TRENCHING
— — — — — —
NEW OVERHEAD CONDUCTOR
GENERAL NOTES
- ALL WORK IS TO BE COMPLETED PER PSE STANDARDS & PRACTICES.
COPIES OF ALL PSE STANDARDS ARE AVAILABLE UPON REQUEST.
- WORK SITES SHALL BE KEPT CLEAR OF DEBRIS AND ALL
CONSTRUCTION MATERIALS, EQUIPMENT AND PACKING SHALL BE
REMOVED DAILY.
- RETURN ALL UNUSED AND REMOVED POLES, TRANSFORMERS AND
HARDWARE TO PSE, STOREROOM. ALL COPPER SHALL BE COILED AND
RETURNED THE DAY IT IS REMOVED FROM THE POLES. REMOVE ALL
UNUSED PINS AND INSULATORS.
- RETURN ALL STREET LIGHTS, AREA LIGHTS AND FLOODLIGHTS TO
PSE.
- PROVIDE FOR EROSION AND SEDIMENT CONTROL PER PSE
STANDARD 0150.3200 AND ANY ADDITIONAL LOCAL JURISDICTION
REQUIREMENTS.
PRECONSTRUCTION
- NOTIFY APPROPRIATE CITY, COUNTY OR DOT AUTHORITIES 48 TO 72
HOURS, OR AS REQUIRED BY PERMITTING AGENCY, IN ADVANCE OF
STARTING WORK IN RIGHT-OF-WAY INVOLVING A PERMIT.
- ALL SYSTEM SWITCHING SHALL BE APPROVED BY SYSTEM
OPERATIONS A MINIMUM OF 48 HOURS IN ADVANCE.
- NOTIFY CUSTOMERS OF ALL OUTAGES 48 HOURS IN ADVANCE.
WORK DRAWINGS AND DOCUMENTS
- FIELD DESIGN CHANGES SHALL BE APPROVED BY PSE PROJECT
MANAGER OR ENGINEER.
- MARK ALL FIELD CHANGES, EQUIPMENT ID NUMBERS AND
UNDERGROUND CABLE INFORMATION IN RED ON FOREMAN'S COPY OF
WORKSKETCH.
- RETURN ONE FOREMAN'S COPY OF WORKSKETCH TO PROJECT
MANAGER AT COMPLETION OF JOB.
- WHEN PERMITS ARE REQUIRED, A COPY SHALL BE AVAILABLE ON
WORK SITE AT ALL TIMES.
SAFETY
REFER TO PSE STANDARDS 6275.3000 AND 6275.6000 FOR SYSTEM
GROUND REQUIREMENTS.
REFER TO PSE STANDARDS 6275.9050 FOR PERSONAL PROTECTIVE
GROUNDING REQUIREMENTS.
- REFER TO PSE STANDARDS 6275.9150 FOR VEHICLE GROUNDING AND
BARRICADING REQUIREMENTS.
- PROPER LINE CLEARANCES SHALL BE TAKEN AT THE BEGINNING, AND
RELEASED AT THE END, OF EACH WORK DAY, OR AS OTHERWISE
INSTRUCTED BY THE SYSTEM OPERATOR.
- PROVIDE SIGNS, BARRICADES, AND TRAFFIC CONTROL IN
CONFORMANCE WITH PERMIT REGULATIONS.
- UTILIZE FLAGGING AND OTHER VEHICLE TRAFFIC CONTROL AS
NECESSARY AND IN CONFORMANCE WITH LOCAL TRAFFIC
REGULATIONS.
- MAINTAIN TRAFFIC FLOW AS REQUIRED BY PERMITTING AGENCY.
JOINT FACILITIES
- COORDINATE WITH COMMUNICATION COMPANIES FOR TRANSFERS.
UNDERGROUND CONSTRUCTION
CONDUIT INSTALLATION
- ALL PSE CONDUIT INSTALLATIONS SHALL CONFORM TO PSE
STANDARDS 6800.6000, 6800.6050, 6800.8050, AND 6825.6505.
- ALL CONDUITS ENTERING PSE VAULTS SHALL BE THROUGH THE
APPROPRIATE KNOCKOUTS TO ENSURE PROPER CABLE LAY. VAULT
ENTRIES SHALL NOT CAUSE CABLES TO CROSS EACH OTHER IN THE
VAULT, OR LAY IN THE VAULT UNEVENLY.
- ALL CONDUITS ENTRIES INTO PSE VAULT SHALL BE STRAIGHT AND
LEVEL WITH A MINIMUM OF 2' STRAIGHT SECTION OUTSIDE THE VAULT
WALL AND 2" ON CONDUIT EXTENDING INTO THE VAULT WITH BELL
ENDS INSTALLED.
- PSE CONDUITS SHALL BE PLACED IN THE TRENCH MAINTAINING A
MINIMUM OF 1-1/2" OF SEPARATION.
- PSE CONDUIT RUNS SHALL BE PLACED STRAIGHT AND LEVEL.
SHOULD IT BECOME NECESSARY TO ALTER CONDUIT ALIGNMENTS TO
AVOID OTHER UTILITIES THE MAXIMUM BEND RADIUS ALLOWED IS
22-1/2 DEGREES. BEND RADIUS GREATER THAN 22-1/2 DEGREES
REQUIRE PRIOR APPROVAL FROM PSE ENGINEERING
REPRESENTATIVES.
- ALL PSE CONDUITS SHALL BE PLACED WITH THE MINIMUM
SEPARATION BETWEEN OTHER UTILITY FACILITIES AS SPECIFIED IN
PSE STANDARD 6790.0130.
- ALL PSE CONDUITS SHALL HAVE A MINIMUM OF 36" OF COVER.
COVER OF LESS THAN 36" IS PERMISSIBLE ON A CASE BY CASE BASIS
PROVIDED THAT SUCH INSTALLATIONS ADHERE TO PSE STANDARD
6790.0130 FIGURE 2. PRE -APPROVED BY PSE ENGINEERING
REPRESENTATIVES IS REQUIRED.
TRENCH & EXCAVATION
- PSE OR IT'S CONTRACTOR SHALL PROVIDE ALL TRENCH EXCAVATION
AND BACKFILL FOR THE INSTALLATION OF NEW OR MODIFIED PSE
UNDERGROUND DISTRIBUTION SYSTEM WITHIN THE CONSTRUCTION
AREA.
- ALL TRENCH EXCAVATION AND BACKFILL SHALL CONFORM TO PSE
STANDARDS 6790.0075, 6790.0130, 6790.0140, AND 6790.3050.
- 6" BASE OF CRUSHED ROCK TO PREVENT VAULT SETTLING.
FOREMAN (CHECK BOX WHEN COMPLETED)
❑ PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
❑ Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
❑ Field Changes RED -LINED on As -built.
❑ Material VERIFIED and CHANGES noted on Paperwork.
❑ Total PRIMARY Cable noted on As -built.
❑ Company ID#'s RECORDED in correct location on As -built.
❑ Indicate correct FUSE SIZE on As -built & VERIFY proper PHASE.
❑ Deviations noted on the As -built and their reason.
❑ I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
Foreman's Signature
Print Name Date
PROJECT PHASE
NOTIF#
ORDER#
PWR Superior
Perm. Service
Relocation
Removal
Temporary
Job Order
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
GAS Distribution
HP Main
HP Svc/MSA
N/A
N/A
N/A
N/A
N/A
N/A
CABLE TV
POWER WK CTR
N/A
DRAWN BY C. WESTERFIELD
PHONE
9/29/17
CHECKED BY K. WAKUMOTO (503) 892-6828
Project Manager Contact Information:
Manager: Patima Dejarath
Cell Phone: (425) 456-2654
E -Mail: patima.dejarath@pse.com
Vicinity Map
N/A
Owner/ Developer Contact Info
N/A
N/A
N/A
ATTN: N/A N/A office
For contacts below dial 1 -888 -CALL PSE (225-5773)
CALL (800) 424-5555
Developer Yes x Yes x PSE
"Locates Required" No No
"Outages Required" Yes No x
"Flagging Required" Yes No X
2 BUSINESS DAYS BEFORE YOU DIG
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
REAL ESTATE/EASEMENT PERMIT
Required City of Renton
3 9/29/2017
KAW 100% SUBMITTAL
FUNCTION CONTACT
PHONE NO
DATE
2 9/15/2017
KAW 90% REVIEW
PROJECT MGR P. DEJARATH
(425) 456-2654
9/29/17
1 5/31/2017
KAW 90% REVIEW
ENGR - POWER B. HENNESSEY
(503) 892-6820
9/29/17
REV# DATE
BY DESCRIPTION
ENGR - GAS N/A
N/A
N/A
COUNTY
King
Emer Sect Gas Wk Ctr
N/A N/A
POWER WK CTR
N/A
DRAWN BY C. WESTERFIELD
(503) 892-6820
9/29/17
CHECKED BY K. WAKUMOTO (503) 892-6828
9/29/17
1/4 SEC
Sec S25 T 23 R 04E
OP MAP
N/A
PLAT MAP
N/A
APPROVED BY N/A
N/A
N/A
FOREMAN #1 N/A N/A
N/A
U -MAP NO (POWER)
2304-E-100
OH CKT MAP
2305-E-124
UG CKT MAP
2304-E-100
�CIRCUITNO
RJN-27
FOREMAN #2 N/A
N/A
N/A
MAPPING N/A N/A
N/A
JOINT FACILITIES ARRANGEMENTS
UTILITIES
N/A N/A
N/A
N/A
CONTACT
N/A N/A
N/A
N/A
PHONE#
N/A N/A
N/A
N/A
PUGET
SOUND AMI NETWORK UNIT
1001 SW 34th St
ENERGY Renton, WA
DESIGNED BY N/A
�'1 POWER
=� ENGINEERS
INCIDENT MAOP
N/A N/A
Gas
GasElect Order
14 PAGE 9
SCALE
N/A 1/1