HomeMy WebLinkAboutMFP18000414DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP18000414
IVR Number: 18000414
Permit Informa!on
Permit Name:Puget Sound Energy - Electric
Address/Loca!on:01/24/2018Applica!on Date:3223059258Parcel Number:17811 116TH AVE SE
Permit Type :03/01/2018Issue Date:Franchise
Permit Work Class:03/01/2019Expira!on Date :Minor U’lity
Job Number:101108351Franchise Type :Electric
Descrip!on:PSE to install OH service from pole P01 to new pole P03 located on private property adjacent to
mobile home. See Redlines on Plans. Conditions: all aerial must have a minimum vertical
clearance of 15' 6". This overhead service is allowed for this mobile home and is not allowed
for any future uses of this property.
Contacts
Name Address PhoneTypeBilling
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC - BILLING
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Applicant
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: BL.005109Electrical Contractor : POTELI*344O4
Construc!on Contractor : POTELI*227PL
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC - BILLING
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Specialized
Billing
X
General Condi!ons & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Puget Sound Energy - Electric
101108351
Anish Kumar
253-208-2183
anish.kumar@pse.com
17811 116th Ave SE 98058 Brown 101108351
Occupying N & S bound lanes of 116th Ave SE for crew to run OH to OH electric
service from pole P01 to M01 to a demo/rebuild house (consumed by fire). No pavement cuts,
restoration per City of Renton standards.
Potelco Inc.253-208-2183
BL005109 Poteli*227PL
1/23/2018
MFP18000414
Scott Warlick
Justin Johnson 1-26-2018
3/1/12018
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
Reset FormPrint Form
Brown 101108351
PSE/Potelco Inc.
Russell Page 253-234-6444
6905 S 228th St, Kent, WA 98032
russell.page@pse.com
17811 116th Ave SE
TBD
2/13/2018
Anish Kumar 1/23/2018
MFP18000414
Justin Johnson
1-26-2018
8:00 am to 3:00 pm
Monday through Friday
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
10101313P0217811ONE LANEROADAHEADW20-4
100'100'100'ROADWORKAHEADW20-1 W20-7A STOPFLAG
G
ER1010 STOPFLAGGE
RONE LANEROADAHEADW20-4100'100'100'ROADWORKAHEADW20-1W20-7AONE LANEROADAHEADW20-4100'100'100'ROADWORKAHEADW20-1W20-7ASTOPFLAGG
ER
FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PA
RKNO PARK SIGNAGE WILL BEPLACED ON ALL STREETS TOSURROUND WORK ZONEFLAGGERS WILL HOLDTRAFFIC IN ALL DIRECTIONSFOR OVERHEAD WIRE WORKBETWEEN P02 & #17811SE 178TH PL116TH AVE SE116TH AVE SERESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSURECHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGYJOB#10110835117811 116th Ave SE, Renton WAJanuary 4, 2018ryan.honeysett@pse.com425-457-5381SHEET 1 OF 2Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwiseindicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPPOLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYPuget Sound EnergyTraffic Control Supervisor:Ryan HoneysettCard No. 010760Card Exp. 06/30/2021ryan.honeysett@pse.com(425)457-5381PRINT ON 11 X 17SHEETS ONLYMFP18000414
10101313P0117811ONE LANEROADAHEADW20-4
100'100'100'ROADWORKAHEADW20-1 W20-7A1010 STOPFLAGGE
R ONE LANEROADAHEADW20-4100'100'100'ROADWORKAHEADW20-1W20-7ASTOPFLAGGE
R
FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PAR
KNO PARK SIGNAGE WILL BEPLACED ON ALL STREETS TOSURROUND WORK ZONEFLAGGERS WILL HOLDTRAFFIC IN ALL DIRECTIONSFOR OVERHEAD WIRE WORKBETWEEN P01 & #17811SE 178TH PL116TH AVE SE116TH AVE SEBEPREPAREDTOSTOPW3-4100'100'100'ROADWORKAHEADW20-1W20-7ARESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSURECHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGYJOB#10110835117811 116th Ave SE, Renton WAJanuary 4, 2018ryan.honeysett@pse.com425-457-5381SHEET 2 OF 2Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwiseindicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPPOLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYPuget Sound EnergyTraffic Control Supervisor:Ryan HoneysettCard No. 010760Card Exp. 06/30/2021ryan.honeysett@pse.com(425)457-5381PRINT ON 11 X 17SHEETS ONLYMFP18000414
PAN
61'PARCEL#
3223059258
63'
62'
17811 15
(SOFT SHOULDER)
(SOFT SHOULDER)
REBUILD
DEMO/
SE 178TH PL
#4ACSR
37.5kVA 120/240v
SITE PLAN
N
Vicinity Map
N/A
Owner / Developer Contact Info
officeATTN:
MARIE BROWN
17811 116TH AVE SE
RENTON, WA 98058
TOM BUSH 206.799.2819
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
STANDARD EASEMENT PROVISION
An easement is hereby reserved for and conveyed to Puget Sound Energy,
Inc., Telephone Co., Television Cable Co., and their respective successors
and assigns under and upon the private street(s), if any, and the exterior
ten (10) feet of all lots, tracts and spaces with in the plat lying parallel with
and adjoining all street(s) in which to construct, operate, maintain, repair,
replace and enlarge underground or ground-mounted appurtenances
thereto for the purpose of serving this subdivision and other property with
electric, gas, telephone and other utility service, together with the right to
enter upon the streets, lots, tracts and spaces at all times for the purposes
herein stated.101108351FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
GAS
PHONE
CABLE TV
N/A 108103292
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Perm. Service
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:RUSSELL PAGE
(253) 234-6444
RUSSELL.PAGE@PSE.COM
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
SCALE: 1" = 50'
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
R. PAGE (253) 234-6444 10.4.17
R. PAGE (253) 234-6444 10.4.17
E. HAUSER (714) 893-2405 10.4.17
N/A RENTON
BROWN
200A OH PERM SVC
17811 116TH AVE SE, RENTON, WA 98058
N/A N/A
N/A 101108351
AS NOTED 1 OF 1
KING N/A N/A CSPSKEIN
32NE-T23N-R05E N/A N/A
2305E125 2305E136 2305E125 PAN-15
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
101108351504895993
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch
must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working
days in advance.
3.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the
underground facilities located.
4.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch
and details for locations. Equipment locations must be approved by the Project Manager.
5.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which
would restrict construction and/or equipment access, before work can begin.
6.Roads shall be paved or have a compacted , crushed rock base in place.
7.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls,
overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE
standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in
the right of way, and at least 1 foot when crossing them.
8.All work is to be done in accordance with local municipal and county permit requirements as applicable.
9.Inclement weather conditions may cause delays in construction times and dates.
10.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this
sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and
24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope
the trench to 1:1.
POWER GENERAL NOTES - RESIDENTIAL PROJECT
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
PAN-15
06/2017
231.00 208.00 170.00
0.00 1.90 0.00
231.00 209.90 170.00
OVERHEAD CIRCUIT MAP 2305E136
SCALE: 6" = 1 MILE
JOB SITE
JOB SITE
ASPLUNDH CONSTRUCTION CORP.
SPAN SPECIFIC NOTES
P02 TO M01:
-REMOVE SERVICE OH TPX TO "17811"
P01 TO M01:
-INSTALL 1-RUN 4/0 OH TPX ± 120'
SITE SPECIFIC NOTES
P01: 316457-166562
-EXISTING POLE AND TRANSFORMER TO REMAIN
P02: 316439-166562
-EXISTING POLE TO REMAIN
M01: NEW METER BASE
-INSTALL 200A METER
CIRCUIT FEET ADDED: 0'
64)227$*(64)7
3$1(/6,=($
+($77<3((/(&75,&
(67'(0$1'.:
/5&$
9'523
)/,&.(5116TH AVE SEOVERHEAD SERVICE TO GUYED RISER
SCALE: NONE
MFP18000414
Install Pole P03
Install Pole P03 within Private property - near mobile
home.. If additional communication services are needed,
than the pole needs to be tall enough that all overhead
services meet the minimum height clearances within 116th.
TO: City of Renton
RE: PSE Job Number 101108351
TYPE OF WORK: Upgrade and relocate previous overhead service
at 17811 116th AVE SE, Renton
LOCATION OF WORK: 17811 116th AVE SE, Renton
SCOPE OF WORK:
At location P02, as shown on the attached copy of the worksketch, PSE is removing the
existing OH service requesting exemption from the underground ordinance in order to
upgrade and relocate the service to P01. This will be to accommodate the renovation of a
home that was consumed by fire at 17811 116th AVE SE, Renton. The approximate time
for the work on the pole is 1 hour using the attached traffic control plan.
Give me a call if there are any questions on the work to be done.
Sincerely,
Russell Page
Puget Sound Energy
Project Manager
Customer & System Projects
Tel: (253) 234-6444
Cell: (253) 245-0192
russell.page@pse.com
MFP18000414
APPROVED
03/01/2018 hpowers
DEVELOPMENT ENGINEERING DIVISION