Loading...
HomeMy WebLinkAboutMFP18000514DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP18000514 IVR Number: 18000514 Permit Informa!on Permit Name:Puget Sound Energy - Electric Address/Loca!on:01/25/2018Applica!on Date:3448720180Parcel Number:5204 NE 5TH PL Permit Type :02/15/2018Issue Date:Franchise Permit Work Class:02/15/2019Expira!on Date :Minor U&lity Job Number:105085665Franchise Type :Electric Descrip!on:Install 50' of 2" Sch 80 conduit and underground facili&es from V 02 to plat perimeter on west side of llwaco Ave NE . Asphalt cuts an&cipated . restora&on per City of Renton standards . Contacts Name Address PhoneTypeBilling ANISH KUMAR PUGET SOUND ENERGY - ELECTRIC - BILLING 6905 S 228th St Kent, WA 98032 B: (253) 208-2183Applicant Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: BL.005109Electrical Contractor : POTELI*344O4 Construc!on Contractor : POTELI*227PL CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner ANISH KUMAR PUGET SOUND ENERGY - ELECTRIC - BILLING 6905 S 228th St Kent, WA 98032 B: (253) 208-2183Specialized Billing X General Condi!ons & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 | Published: 3/30/2017 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 3/30/2017 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street ☐ Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Puget Sound Energy - Electric 105085665 Anish Kumar 253-208-2183 anish.kumar@pse.com 5000 Illwaco Pl NE 98059 105085665 Mead Short Plat One at a time occupying S & N bound lanes of Illwaco Pl Ne for crew to install +/- 50' of 2" Sch 80 conduit and underground facilities from V02 to plat perimeter of W side of Illwaco Pl. Pavement cuts anticipated. Restoration per City of Renton standards. 50'x18"x36" Potelco Inc.253-208-2183 BL005109 Poteli*227PL 1/25/2018 Scott Warlick 1/31/2018 5204 NE 5th PL MFP18000514 Justin Johnson 2-15-2018 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: • Comply with all traffic regulations of the City of Renton and the State of Washington. • Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. • Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. • Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. • Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. • The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. • In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. • Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. • By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: Reset FormPrint Form 105085665 Mead Short Plat PSE/Potelco Inc. Lee Brown 425-417-8620 6905 S 228th St, Kent, WA 98032 lee.brown@pse.com 5000 Illwaco Pl NE TBD 2/26/2018 Anish Kumar 1/25/2018 MFP18000514 Justin Johnson Monday through Friday 2-15-2018 8:00 am to 3:00 pm SKETCH I -- NORTH -- I NOTES: • Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. • The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. • Approved Temporary Traffic Control Plan must be at the work site during work hours. • Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. • Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. • Total road closure lasting more than 24 hours is subject to the approval by the City Council. • Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: • Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. • Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. • The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. • Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). NE 5TH PL NE 5TH CT NE 6TH ST ILWACO PL NE14141515 1515 14141313 V02 JERICHO PL NEFROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARKING SIGNS TO BE PLACED ON BOTH SIDES OF THE WORK AREA NO-PARK RESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE USE MAXIMUM AVAILABLE SPACE FOR SIGNS ONE LANE ROAD AHEAD W20-4100'100'100'ROAD WORK AHEAD W20-1W20-7ABEPREPAREDTOSTOPW3-4100'100'100'ROADWORKAHEADW20-1W20-7AONE LANEROADAHEADW20-4100'100'100'ROADWORKAHEADW20-1W20-7ASTOP FLAGGER STOP FLAGGER STOP FLAGGER R9-9SIDEWALKCLOSEDR9-9SIDEWALK CLOSED PEDESTRIAN DETOUR AROUND WORK AREA VIA JERICHO PL NE ROADWORKAHEADW20-1 TRACT A CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Job#105085665 5000 Ilwaco Pl NE, Renton, WA Janurary 18, 2017 Sheet 1 of 2 brent.pogson@pse.com (425)398-6158 N PSE PUGET SOUND ENERGY BORE PIT 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 008997 Card Exp. 08/13/2019 gregory.harwood@pse.com (425)424-6425 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. 4. Sign size can be a minimum of 48" x 48" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m. MFP18000514 Jericho Ave NEIIwaco Ave NE NE 5TH PL NE 5TH CT NE 6TH ST ILWACO PL NE14141515 1515 14141313 TRACT A V02 JERICHO PL NEFROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARKING SIGNS TO BE PLACED ON BOTH SIDES OF THE WORK AREA NO-PARK RESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE USE MAXIMUM AVAILABLE SPACE FOR SIGNS ONE LANE ROAD AHEAD W20-4100'100'100'ROAD WORK AHEAD W20-1W20-7ABEPREPAREDTOSTOPW3-4100'100'100'ROADWORKAHEADW20-1W20-7AONE LANEROADAHEADW20-4100'100'100'ROADWORKAHEADW20-1W20-7ASTOP FLAGGER STOP FLAGGER STOP FLAGGER ROADWORKAHEADW20-1 CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Job#105085665 5000 Ilwaco Pl NE, Renton, WA Janurary 18, 2017 Sheet 2 of 2 brent.pogson@pse.com (425)398-6158 N PSE PUGET SOUND ENERGY BORE PIT 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 008997 Card Exp. 08/13/2019 gregory.harwood@pse.com (425)424-6425 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. 4. Sign size can be a minimum of 48" x 48" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m.Jericho Ave NEIIwaco Ave NEMFP18000514 NE 6TH STREETLOT 1LOT 2LOT 3LOT 7LOT 6LOT 5LOT 4ILWACO AVE NEILWACO PLACE NENE 5th PLACEPUBLIC ALLEY (ROW)DEVELOPER RESPONSIBLEFOR CONDUIT/WIRE FROMH1B TO METER LOCATIONGAS ONLYNE 5TH CTST LT'A''B'FEEDPRE14 46'56'46'48'20'FUT 1-2"TRACT 'A'STM.DETENTION 221918172021NVicinity Map47.4905, -122.1485Owner / Developer Contact InfoofficeATTN:TUSCANY CONSTRUCTION LLCPO BOX 6127BELLEVUE, WA 98008BOB WENZL206.714.6707THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL (800) 424-55552 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)PSENoNoNoYesYesYesNoYesDeveloper"Flagging Required""Outages Required""Locates Required"ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSIONSTRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)EROSION & SEDIMENT CONTROL REQUIREMENTSNOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROLEROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.FOREMAN (CHECK BOX WHEN COMPLETED)PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.Grid, Cable, and Switch numbers INSTALLED & VERIFIED.Field Changes RED-LINED on As-built.Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.Foreman's Signature _______________________________________________Print Name ___________________________________ Date ______________Material VERIFIED and CHANGES noted on Paperwork.Total PRIMARY Cable noted on As-built.Company ID#'s RECORDED in correct location on As-built.Deviations noted on the As-built and their reason.I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met.GASPHONECABLE TV504741570105085665N/A105087271N/AN/AN/AN/AN/AN/AN/AN/A504791588107054642N/A106327229N/AN/APROJECT PHASEPWRNOTIF#ORDER#SuperiorCommercial HHRelocationRemovalTemporaryJob OrderDistributionService StubsHP Svc/MSA10.9.8.7.6.5.4.3.2.1.THE CUSTOMER IS RESPONSIBLE FOR PROVIDING ALL TRENCHING, PER THE TRENCHPROFILE, AND ALL EXCAVATIONS AT THE TRANSFORMER/HANDHOLE VAULT SITESSUCH THAT PSE FACILITIES WILL MATCH FINAL GRADE. VAULT HOLES WILL HAVESTABLE LEVEL BOTTOMS. CUSTOMER WILL PROVIDE 6" OF CRUSHED ROCK FORVAULT BEDDING. ALL TRENCHES WILL HAVE 6" OF WASHED SAND COVER AND 4"BEDDING FOR ALL CONDUITS. THE CUSTOMER WILL PROVIDE SELECT BACKFILL, IFREQUIRED, AND COMPACTION AS NECESSARY. THE CUSTOMER IS RESPONSIBLE FORDISPOSAL OF ALL NATIVE SPOILS NOT SUITABLE FOR USE AS BACKFILL. ALLTRENCHES MAY BE JOINT WITH GAS, TELEPHONE AND TV CABLE.ALL CABLES/CONDUITS TO BE INSTALLED IN CUSTOMER'S TRENCH AT THE DEPTHINDICATED IN TRENCH DETAIL (DEPENDENT UPON SIZE OF CONDUIT BEING INSTALLEDTO MEET MIN 36" OF COVER). INSTALL CABLE ID TAGS AT EACH END OF THE PRIMARYCABLES PER THE CIRCUIT ONE-LINE DIAGRAM.UNLESS OTHERWISE SPECIFIED BY MUNICIPALITIES, INSTALL PVC (DB-120) ROADCROSSINGS AS INDICATED ON THE CROSSINGS CONDUIT TABLE & AS SHOWN ONWORK SKETCH. CROSSINGS SHALL BE INSTALLED BY CUSTOMER/DEVELOPER PERPUGET SOUND ENERGY STANDARDS.AT SYMBOL: INSTALL UNDERGROUND PRIMARY CABLES INCONDUIT. CABLE LENGTH AND CONDUIT SIZE AS INDICATED ON PRIMARY CABLE &CONDUIT TABLE.AT SYMBOL: INSTALL 600 VOLT UG SECONDARY CABLES INCONDUIT. CABLE/CONDUIT SIZE AND LENGTH AS INDICATED ON SECONDARY CABLE &CONDUIT TABLE.AT SYMBOL: INSTALL MINI-PAD HANDHOLE & PADMOUNT TRANSFORMER.ADDITIONAL EQUIPMENT AS INDICATED ON VAULT TABLE.AT SYMBOL: INSTALL SECONDARY PEDESTAL/HANDHOLE W/ (3)MULTI-CONNECTORS. SIZE AS INDICATED ON SECONDARY HH/PEDESTAL TABLE.(EXCAVATION: 3' SQ.)AT SYMBOL: INSTALL JUNCTION BOX HANDHOLE. ADDITIONAL EQUIPMENT ASINDICATED ON VAULT TABLE.AT SYMBOL: INSTALL SECONDARY CABLE & CONDUIT STUB-OUT.AT SYMBOL: INSTALL STREET LIGHTING STANDARD. SIZE AND TYPE OFSTANDARD/LUMINARIE AS INDICATED ON STREET LIGHTING TABLE. (CUSTOMER TOEXCAVATE & INSTALL CORRUGATED STREET LIGHT TUBES FOR PLACEMENT OF THESTREET LIGHT STANDARDS. )INCLEMENT WEATHER CONDITIONS MAY CAUSE DELAYS IN CONSTRUCTION TIMESAND DATES.POWER GENERAL NOTES - PLAT PROJECT105085665107054642DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPL. BROWN425.417.8620.D. KANOWSKY.12.8.17D. KANOWSKY.12.8.17D. KANOWSKY.12.8.17REDT # ( RW-101604 )RENTONMEAD SHORT PLAT1Ø PRIMARY U/G LINE EXTENSION - 7 S/F LOTSP# 1023059230, 5000 BLOCK ILWACO PL NE, RENTON, WA 98059PUGET SOUND ENERGYN/AIP 088-601070546421050856651"= 50'1 OF 2KING30CIKNCQCSOKE10SE-R23-T05E204.086207.0872305E0402305E0402305E040PRE-14COMCASTBILL WALKER253.288.7538CENTURYLINKAMY ALLISTON206.794.8534RIGHT OF WAYCHAD WALIMAKI425.462.3292...11.E-Mail:Cell Phone:Project Manager Contact Information:Manager:LEE BROWN425.417.8620Lee.Brown@pse.comxxxx.........BOB@TUSCANYWA.COMVAULT DETAIL @ V01NOT TO SCALETOP VIEWSIDEVIEWEXCAVATION:4-2/3 CUBIC YARDSRockCrushed6"3'-6"2"6'6'48"42"36"38"42"StrutsFRONTFRONTTYPICAL NOTCH-OUT FOR TRANSFORMER,NOT TO SCALE& SECONDARY PEDESTAL/HANDHOLEBACK OF EASEMENTSTANDARDEASEMENTLINEROW10'PL1'4' - 5'Min.1'7'7'TRANSFORMER(WHEN PRESENT)42"45°42"1'45°Property LineRoad SideTop View of Mainline Trench forSingle Stubout Location3'Property LineRoad SideTop View of Mainline Trench for Pedestalor Double Stubout Location42"45°3'45°STUBOUT EXCAVATION DIMENSIONSNOT TO SCALEJOINT TRENCH DETAILNOT TO SCALE JOINT TRENCH DETAILNOTES:1. If the final backfill contains rocks greater than 8 inches in diameter, install 12 inches compacted sand shading across the full width of the trench. * If the final backfill contains rocks 8 inches in diameter or smaller, install 6 inches compacted sand shading across the full width of the trench. *2. Rocks greater than 10 inches diameter are not permitted in the final backfill.3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line.4. Utilities shall not be stacked over the gas line in the trench.5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements.6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies.* Alternatives to full-width trench shading require PSE approval.Primary & Secondary-Mainline Gas & Communications (NTS)ROAD SIDENATIVESECONDARY POWERPEDESTALMATERIALP/LPowerSecondaryPowerPrimaryConduitTel. & TV12" Min12" SandCover whengas line is intrenchSand6" or 12"4" Sand Bedding1'36"Cover42"Gas12"18"Lower2"10"PedestalPSE 10' FRONTAGEEASEMENT1'CoverROAD SIDEMINIPADMINIPADFIELD SIDEVAULT6" of crushed rock(base for vault)P/LPowerSecondaryPowerPrimaryGas12" Min Horizontal SeparationCommunications42" Min21"1'Feeder38"2"4" Sand Bedding12" SandCover36"Cover4" Sand Bedding42"6" Additional depth whenFeeder is requiredPSE 10' FRONTAGE EASEMENT1'TRANSFORMERFinalBackfillInitialBackfillTrench Depth42" - 48"PrimaryDirt PileFinal Grade24" Min36"Min CoverOver Power48"MaxDepthFinal BackfillGas4" Sand BeddingProperty Lineintercept (depth varies).SidewalkCurbLocation of roof drain48" TypicalWidth may vary perNumber of Utilitiesand Conduits6" or 12" Min Sand ShadingOver Gas after Compaction12" MinR/W orExcavated12" TypicalPowerSecondaryPowerTV & TEL12" Min12" MinSeparation4,51,21366" or 12" Min Sand Shading Over Power after Compaction1@ H1ASHALL BE STAGGEREDCONNECTOR BARSIN THE FRONTNEUTRALS SHALL BE18"16"13"12"10"2"10"Pedestal will accept up to six 3" conduitsSEALED WITH FOAMCONDUIT SHALL BE120 PVC CONDUIT ELBOWSTYPICAL 24" RADIUS DBSIDE VIEW WITH CONDUIT10"18"16"13"10"2"36"FRONT VIEW WITH CONDUITSECONDARY PEDESTAL DETAIL NOT TO SCALESITE1"= 50'SITE PLANSCHED.SQ. FT.MAX LRC = CIRCUIT FEET ADDED: 140273000140 AMPSCIRCUIT LOADING TABLEAS OFEXIST. PEAK LOADEST. NEW LOADTOTALCIRCUIT:A PHASE B PHASE C PHASEPRE-146.13.17360411404N/A5N/A368416404CROSSING CONDUIT TABLEX-ING#LOCATIONGASPOWERXINGLENGTHTYPE OF CROSSING(Feeder, Primary, Secondary, etc.)FROMTOSIZE(IN)TYPEQTYLOCATIONSIZE(IN)TYPEQTYX01TR A'A'ELECTRIC ONLY2SCH 80150PRIMARYX02LOT 7'B'4401SGAS ONLY50GAS MAINX03TR ALOT 7ELECTRIC ONLY2SCH 80125PRIMARY3SCH 80125SECONDARYX04LOT 3LOT 12401E3SCH 80225GAS SVC, SECONDARY2" PVC PLUG /CAPS = 22" YELLOW SCH 40 PVC = 25 FT2" SCH80 GREY PVC = 75 FT2" PVC PLUG /CAPS = 44" PVC PLUG /CAPS = 24" YELLOW SCH 40 PVC = 50 FT3" SCH80 GREY PVC = 75 FT3" PVC PLUG /CAPS = 6Side View15"23-1/4"32-3/4"2"Captive L-BoltLock Cover, 10 lbs24"ApproxApprox13"Customer'sserviceconductors 4-3/4" X 4-3/4"KNOCKOUT IN 2 PLACESConductors enter frombeneath and shall befolded back with handholeSet handhole flushto final gradeCaptive L-BoltLock CoverSINGLE-PHASE SECONDARYHANDHOLE DETAILNOT TO SCALEAT H1BMFP18000514 LOT 1LOT 2LOT 3LOT 7LOT 6LOT 5LOT 4'A'FUT 1-2"CONDUIT RUN FROM V01TO H1B MUST BE SCH.80'A'FEEDPRE14BØADG155 NEW 1/O AL(+7%‘117# 119#DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPL. BROWN425.417.8620.D. KANOWSKY.12.8.17D. KANOWSKY.12.8.17D. KANOWSKY.12.8.17REDT # ( RW-101604 )RENTONMEAD SHORT PLAT1Ø PRIMARY U/G LINE EXTENSION - 7 S/F LOTSP# 1023059230, 5000 BLOCK ILWACO PL NE, RENTON, WA 98059PUGET SOUND ENERGYN/AIP 088-60107054642105085665AS NOTED2 OF 2KING30CIKNCQCSOKE10SE-R23-T05E204.086207.0872305E0402305E0402305E040PRE-14COMCASTBILL WALKER253.288.7538CENTURYLINKAMY ALLISTON206.794.8534RIGHT OF WAYCHAD WALIMAKI425.462.3292............THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL (800) 424-55552 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)PRIMARY CABLE & CONDUIT TABLELOCATIONCONDUITCABLEASBUILT INFORMATION - FOREMAN COMPLETEFROMTOSIZE(IN)QTY.DESIGNLENGTH(FT)BENDSPULL(LBS)PULLREV(LBS)CABLESIZEDESIGNLENGTH(FT)PHASE - ID TAGRECORDRECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED90°45°22°11°ABCMANUFACTURERCOMPOUNDYEARNOTESCONDUITCABLEV02V01219012--1171191/0 AL JKT150-EHT249--V01E012125512--CONDUIT ONLY----2" PVC (FT) & BENDS =34524001/0 AL JKT TOTAL (FT) =150VAULT & EQUIPMENT TABLESITE #GRID #VAULT SIZE &COVERTYPE & SIZEEQUIPMENT INVAULTPRIMARYBUSHINGSTRANSFORMER ID NUMBERS(COMPANY ID)AS-BUILT INFORMATIONLBDCFOREMAN: INCLUDE PHASE TAPPEDV0131821916748342"x48"x38"Unistrut HHMatid: 766300150KVA MP TRF120/240Matid: 624710011MINU1SR 6045.1010 BØV0231821416749242"x48"x38"Unistrut HHMatid: Existing25KVA MP TRF120/240Matid: Existing1-ELB10J 6041.1000 BØSECONDARY HH/PEDESTAL TABLESitePedestalorHandholeNumber ofPositionsRequiredRemarksH1APEDESTAL4- SEPS4 6050.1000 CHARGE TO PLAT SUP. WO#:105085665H1BHANDHOLE2- HH13350 6050.2000 CHARGE TO COMMERCIAL WO#105087271SECONDARY CABLE & CONDUIT TABLELOCATIONCABLECONDUITVOLTAGEASBUILT INFORMATIONSIZELENGTHASSUMEDSIZELENGTHBENDSDROPFLICKERForeman - CompleteFROMTO(1/O,4/O,350)Design (ft)Lot Corner toMeter (ft)(in)Design (ft)ƒƒƒƒ(Percent)(Percent)Actual Amount InstalledCableConduitV01H1A35015550315532.12.7V01LOT 4350210503210122.63.7LABEL YELLOW TAG "MUST BE 4/0 TO MTR"V01LOT 54/O655026512.03.4V01LOT 64/O155021511.82.8V01LOT 74/O155021511.82.8H1ALOT 14/O30503522.53.7LABEL YELLOW TAG "MUST BE 4/0 TO MTR"H1ALOT 24/O355031022.53.7LABEL YELLOW TAG "MUST BE 4/0 TO MTR"H1ALOT 34/O502002.33.3LABEL YELLOW TAG "MUST BE 4/0 TO MTR"4/O UG Triplex (ft) =1602" PVC & BENDS (ft)=9530000.2350 UG Triplex (ft) =3653" PVC & BENDS (ft)=38082001.5TOTAL QTS OF GLUE1.7NOT TO SCALENEW CONDUIT DIAGRAMSECONDARY 2"SECONDARY 3"PRIMARY 2"CONDUIT LEGENDNEW PRIMARY UNDERGROUND CIRCUIT ONE-LINE DIAGRAMNOT TO SCALEEX UNDERGROUND CIRCUIT MAP 2305E040SCALE: 1" = 100'SITEEX OVERHEAD CIRCUIT MAP 2305E040SCALE: 6" = 1 MILESITEMINIMUM CLEARANCES FOR PSE EQUIPMENTNOT TO SCALEOIL-FILLED EQUIPMENTTRANSFORMERAPPROVEDAREACOMBUSTIBLE BUILDING WALLS & ROOF10'10'10'COOLING5' MIN5' MIN10' MIN5'MINFINSACCESSCONCRETE PADMINIMUM CLEARANCES FOR PSE EQUIPMENTNOT TO SCALECURB OR EDGE OF PAVEMENTCURB OR EDGE OF PAVEMENT5' MINROAD ORPARKING AREATYP. PAD& TRANS-FORMER3'MIN3' MINDOORACCESSDOORREQUIREDWORK SPACEAREA3' MINSECONDARY CABLE & CONDUIT TABLE - COMMERICAL (105087271)LOCATIONCABLECONDUITVOLTAGEASBUILT INFORMATIONSIZELENGTHASSUMEDSIZELENGTHBENDSDROPFLICKERForeman - CompleteFROMTO(1/O,4/O,350)Design (ft)Lot Corner toMeter (ft)(in)Design (ft)ƒƒƒƒ(Percent)(Percent)Actual Amount InstalledCableConduitV01H1A4/O120N/A3110221.30.24/O UG Triplex (ft) =1203" SCH80 COND. (ft)=1102200MFP18000514