Loading...
HomeMy WebLinkAboutP_Design_105085665_V1_180125NE 6TH STREETLOT 1LOT 2LOT 3LOT 7LOT 6LOT 5LOT 4ILWACO AVE NEILWACO PLACE NENE 5th PLACEPUBLIC ALLEY (ROW)DEVELOPER RESPONSIBLEFOR CONDUIT/WIRE FROMH1B TO METER LOCATIONGAS ONLYNE 5TH CTST LT'A''B'FEEDPRE14 46'56'46'48'20'FUT 1-2"TRACT 'A'STM.DETENTION 221918172021NVicinity Map47.4905, -122.1485Owner / Developer Contact InfoofficeATTN:TUSCANY CONSTRUCTION LLCPO BOX 6127BELLEVUE, WA 98008BOB WENZL206.714.6707THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL (800) 424-55552 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)PSENoNoNoYesYesYesNoYesDeveloper"Flagging Required""Outages Required""Locates Required"ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSIONSTRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)EROSION & SEDIMENT CONTROL REQUIREMENTSNOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROLEROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.FOREMAN (CHECK BOX WHEN COMPLETED)PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.Grid, Cable, and Switch numbers INSTALLED & VERIFIED.Field Changes RED-LINED on As-built.Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.Foreman's Signature _______________________________________________Print Name ___________________________________ Date ______________Material VERIFIED and CHANGES noted on Paperwork.Total PRIMARY Cable noted on As-built.Company ID#'s RECORDED in correct location on As-built.Deviations noted on the As-built and their reason.I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met.GASPHONECABLE TV504741570105085665N/A105087271N/AN/AN/AN/AN/AN/AN/AN/A504791588107054642N/A106327229N/AN/APROJECT PHASEPWRNOTIF#ORDER#SuperiorCommercial HHRelocationRemovalTemporaryJob OrderDistributionService StubsHP Svc/MSA10.9.8.7.6.5.4.3.2.1.THE CUSTOMER IS RESPONSIBLE FOR PROVIDING ALL TRENCHING, PER THE TRENCHPROFILE, AND ALL EXCAVATIONS AT THE TRANSFORMER/HANDHOLE VAULT SITESSUCH THAT PSE FACILITIES WILL MATCH FINAL GRADE. VAULT HOLES WILL HAVESTABLE LEVEL BOTTOMS. CUSTOMER WILL PROVIDE 6" OF CRUSHED ROCK FORVAULT BEDDING. ALL TRENCHES WILL HAVE 6" OF WASHED SAND COVER AND 4"BEDDING FOR ALL CONDUITS. THE CUSTOMER WILL PROVIDE SELECT BACKFILL, IFREQUIRED, AND COMPACTION AS NECESSARY. THE CUSTOMER IS RESPONSIBLE FORDISPOSAL OF ALL NATIVE SPOILS NOT SUITABLE FOR USE AS BACKFILL. ALLTRENCHES MAY BE JOINT WITH GAS, TELEPHONE AND TV CABLE.ALL CABLES/CONDUITS TO BE INSTALLED IN CUSTOMER'S TRENCH AT THE DEPTHINDICATED IN TRENCH DETAIL (DEPENDENT UPON SIZE OF CONDUIT BEING INSTALLEDTO MEET MIN 36" OF COVER). INSTALL CABLE ID TAGS AT EACH END OF THE PRIMARYCABLES PER THE CIRCUIT ONE-LINE DIAGRAM.UNLESS OTHERWISE SPECIFIED BY MUNICIPALITIES, INSTALL PVC (DB-120) ROADCROSSINGS AS INDICATED ON THE CROSSINGS CONDUIT TABLE & AS SHOWN ONWORK SKETCH. CROSSINGS SHALL BE INSTALLED BY CUSTOMER/DEVELOPER PERPUGET SOUND ENERGY STANDARDS.AT SYMBOL: INSTALL UNDERGROUND PRIMARY CABLES INCONDUIT. CABLE LENGTH AND CONDUIT SIZE AS INDICATED ON PRIMARY CABLE &CONDUIT TABLE.AT SYMBOL: INSTALL 600 VOLT UG SECONDARY CABLES INCONDUIT. CABLE/CONDUIT SIZE AND LENGTH AS INDICATED ON SECONDARY CABLE &CONDUIT TABLE.AT SYMBOL: INSTALL MINI-PAD HANDHOLE & PADMOUNT TRANSFORMER.ADDITIONAL EQUIPMENT AS INDICATED ON VAULT TABLE.AT SYMBOL: INSTALL SECONDARY PEDESTAL/HANDHOLE W/ (3)MULTI-CONNECTORS. SIZE AS INDICATED ON SECONDARY HH/PEDESTAL TABLE.(EXCAVATION: 3' SQ.)AT SYMBOL: INSTALL JUNCTION BOX HANDHOLE. ADDITIONAL EQUIPMENT ASINDICATED ON VAULT TABLE.AT SYMBOL: INSTALL SECONDARY CABLE & CONDUIT STUB-OUT.AT SYMBOL: INSTALL STREET LIGHTING STANDARD. SIZE AND TYPE OFSTANDARD/LUMINARIE AS INDICATED ON STREET LIGHTING TABLE. (CUSTOMER TOEXCAVATE & INSTALL CORRUGATED STREET LIGHT TUBES FOR PLACEMENT OF THESTREET LIGHT STANDARDS. )INCLEMENT WEATHER CONDITIONS MAY CAUSE DELAYS IN CONSTRUCTION TIMESAND DATES.POWER GENERAL NOTES - PLAT PROJECT105085665107054642DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPL. BROWN425.417.8620.D. KANOWSKY.12.8.17D. KANOWSKY.12.8.17D. KANOWSKY.12.8.17REDT # ( RW-101604 )RENTONMEAD SHORT PLAT1Ø PRIMARY U/G LINE EXTENSION - 7 S/F LOTSP# 1023059230, 5000 BLOCK ILWACO PL NE, RENTON, WA 98059PUGET SOUND ENERGYN/AIP 088-601070546421050856651"= 50'1 OF 2KING30CIKNCQCSOKE10SE-R23-T05E204.086207.0872305E0402305E0402305E040PRE-14COMCASTBILL WALKER253.288.7538CENTURYLINKAMY ALLISTON206.794.8534RIGHT OF WAYCHAD WALIMAKI425.462.3292...11.E-Mail:Cell Phone:Project Manager Contact Information:Manager:LEE BROWN425.417.8620Lee.Brown@pse.comxxxx.........BOB@TUSCANYWA.COMVAULT DETAIL @ V01NOT TO SCALETOP VIEWSIDEVIEWEXCAVATION:4-2/3 CUBIC YARDSRockCrushed6"3'-6"2"6'6'48"42"36"38"42"StrutsFRONTFRONTTYPICAL NOTCH-OUT FOR TRANSFORMER,NOT TO SCALE& SECONDARY PEDESTAL/HANDHOLEBACK OF EASEMENTSTANDARDEASEMENTLINEROW10'PL1'4' - 5'Min.1'7'7'TRANSFORMER(WHEN PRESENT)42"45°42"1'45°Property LineRoad SideTop View of Mainline Trench forSingle Stubout Location3'Property LineRoad SideTop View of Mainline Trench for Pedestalor Double Stubout Location42"45°3'45°STUBOUT EXCAVATION DIMENSIONSNOT TO SCALEJOINT TRENCH DETAILNOT TO SCALE JOINT TRENCH DETAILNOTES:1. If the final backfill contains rocks greater than 8 inches in diameter, install 12 inches compacted sand shading across the full width of the trench. * If the final backfill contains rocks 8 inches in diameter or smaller, install 6 inches compacted sand shading across the full width of the trench. *2. Rocks greater than 10 inches diameter are not permitted in the final backfill.3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line.4. Utilities shall not be stacked over the gas line in the trench.5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements.6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies.* Alternatives to full-width trench shading require PSE approval.Primary & Secondary-Mainline Gas & Communications (NTS)ROAD SIDENATIVESECONDARY POWERPEDESTALMATERIALP/LPowerSecondaryPowerPrimaryConduitTel. & TV12" Min12" SandCover whengas line is intrenchSand6" or 12"4" Sand Bedding1'36"Cover42"Gas12"18"Lower2"10"PedestalPSE 10' FRONTAGEEASEMENT1'CoverROAD SIDEMINIPADMINIPADFIELD SIDEVAULT6" of crushed rock(base for vault)P/LPowerSecondaryPowerPrimaryGas12" Min Horizontal SeparationCommunications42" Min21"1'Feeder38"2"4" Sand Bedding12" SandCover36"Cover4" Sand Bedding42"6" Additional depth whenFeeder is requiredPSE 10' FRONTAGE EASEMENT1'TRANSFORMERFinalBackfillInitialBackfillTrench Depth42" - 48"PrimaryDirt PileFinal Grade24" Min36"Min CoverOver Power48"MaxDepthFinal BackfillGas4" Sand BeddingProperty Lineintercept (depth varies).SidewalkCurbLocation of roof drain48" TypicalWidth may vary perNumber of Utilitiesand Conduits6" or 12" Min Sand ShadingOver Gas after Compaction12" MinR/W orExcavated12" TypicalPowerSecondaryPowerTV & TEL12" Min12" MinSeparation4,51,21366" or 12" Min Sand Shading Over Power after Compaction1@ H1ASHALL BE STAGGEREDCONNECTOR BARSIN THE FRONTNEUTRALS SHALL BE18"16"13"12"10"2"10"Pedestal will accept up to six 3" conduitsSEALED WITH FOAMCONDUIT SHALL BE120 PVC CONDUIT ELBOWSTYPICAL 24" RADIUS DBSIDE VIEW WITH CONDUIT10"18"16"13"10"2"36"FRONT VIEW WITH CONDUITSECONDARY PEDESTAL DETAIL NOT TO SCALESITE1"= 50'SITE PLANSCHED.SQ. FT.MAX LRC = CIRCUIT FEET ADDED: 140273000140 AMPSCIRCUIT LOADING TABLEAS OFEXIST. PEAK LOADEST. NEW LOADTOTALCIRCUIT:A PHASE B PHASE C PHASEPRE-146.13.17360411404N/A5N/A368416404CROSSING CONDUIT TABLEX-ING#LOCATIONGASPOWERXINGLENGTHTYPE OF CROSSING(Feeder, Primary, Secondary, etc.)FROMTOSIZE(IN)TYPEQTYLOCATIONSIZE(IN)TYPEQTYX01TR A'A'ELECTRIC ONLY2SCH 80150PRIMARYX02LOT 7'B'4401SGAS ONLY50GAS MAINX03TR ALOT 7ELECTRIC ONLY2SCH 80125PRIMARY3SCH 80125SECONDARYX04LOT 3LOT 12401E3SCH 80225GAS SVC, SECONDARY2" PVC PLUG /CAPS = 22" YELLOW SCH 40 PVC = 25 FT2" SCH80 GREY PVC = 75 FT2" PVC PLUG /CAPS = 44" PVC PLUG /CAPS = 24" YELLOW SCH 40 PVC = 50 FT3" SCH80 GREY PVC = 75 FT3" PVC PLUG /CAPS = 6Side View15"23-1/4"32-3/4"2"Captive L-BoltLock Cover, 10 lbs24"ApproxApprox13"Customer'sserviceconductors 4-3/4" X 4-3/4"KNOCKOUT IN 2 PLACESConductors enter frombeneath and shall befolded back with handholeSet handhole flushto final gradeCaptive L-BoltLock CoverSINGLE-PHASE SECONDARYHANDHOLE DETAILNOT TO SCALEAT H1B LOT 1LOT 2LOT 3LOT 7LOT 6LOT 5LOT 4'A'FUT 1-2"CONDUIT RUN FROM V01TO H1B MUST BE SCH.80'A'FEEDPRE14BØADG155 NEW 1/O AL(+7%‘117# 119#DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPL. BROWN425.417.8620.D. KANOWSKY.12.8.17D. KANOWSKY.12.8.17D. KANOWSKY.12.8.17REDT # ( RW-101604 )RENTONMEAD SHORT PLAT1Ø PRIMARY U/G LINE EXTENSION - 7 S/F LOTSP# 1023059230, 5000 BLOCK ILWACO PL NE, RENTON, WA 98059PUGET SOUND ENERGYN/AIP 088-60107054642105085665AS NOTED2 OF 2KING30CIKNCQCSOKE10SE-R23-T05E204.086207.0872305E0402305E0402305E040PRE-14COMCASTBILL WALKER253.288.7538CENTURYLINKAMY ALLISTON206.794.8534RIGHT OF WAYCHAD WALIMAKI425.462.3292............THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL (800) 424-55552 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)PRIMARY CABLE & CONDUIT TABLELOCATIONCONDUITCABLEASBUILT INFORMATION - FOREMAN COMPLETEFROMTOSIZE(IN)QTY.DESIGNLENGTH(FT)BENDSPULL(LBS)PULLREV(LBS)CABLESIZEDESIGNLENGTH(FT)PHASE - ID TAGRECORDRECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED90°45°22°11°ABCMANUFACTURERCOMPOUNDYEARNOTESCONDUITCABLEV02V01219012--1171191/0 AL JKT150-EHT249--V01E012125512--CONDUIT ONLY----2" PVC (FT) & BENDS =34524001/0 AL JKT TOTAL (FT) =150VAULT & EQUIPMENT TABLESITE #GRID #VAULT SIZE &COVERTYPE & SIZEEQUIPMENT INVAULTPRIMARYBUSHINGSTRANSFORMER ID NUMBERS(COMPANY ID)AS-BUILT INFORMATIONLBDCFOREMAN: INCLUDE PHASE TAPPEDV0131821916748342"x48"x38"Unistrut HHMatid: 766300150KVA MP TRF120/240Matid: 624710011MINU1SR 6045.1010 BØV0231821416749242"x48"x38"Unistrut HHMatid: Existing25KVA MP TRF120/240Matid: Existing1-ELB10J 6041.1000 BØSECONDARY HH/PEDESTAL TABLESitePedestalorHandholeNumber ofPositionsRequiredRemarksH1APEDESTAL4- SEPS4 6050.1000 CHARGE TO PLAT SUP. WO#:105085665H1BHANDHOLE2- HH13350 6050.2000 CHARGE TO COMMERCIAL WO#105087271SECONDARY CABLE & CONDUIT TABLELOCATIONCABLECONDUITVOLTAGEASBUILT INFORMATIONSIZELENGTHASSUMEDSIZELENGTHBENDSDROPFLICKERForeman - CompleteFROMTO(1/O,4/O,350)Design (ft)Lot Corner toMeter (ft)(in)Design (ft)ƒƒƒƒ(Percent)(Percent)Actual Amount InstalledCableConduitV01H1A35015550315532.12.7V01LOT 4350210503210122.63.7LABEL YELLOW TAG "MUST BE 4/0 TO MTR"V01LOT 54/O655026512.03.4V01LOT 64/O155021511.82.8V01LOT 74/O155021511.82.8H1ALOT 14/O30503522.53.7LABEL YELLOW TAG "MUST BE 4/0 TO MTR"H1ALOT 24/O355031022.53.7LABEL YELLOW TAG "MUST BE 4/0 TO MTR"H1ALOT 34/O502002.33.3LABEL YELLOW TAG "MUST BE 4/0 TO MTR"4/O UG Triplex (ft) =1602" PVC & BENDS (ft)=9530000.2350 UG Triplex (ft) =3653" PVC & BENDS (ft)=38082001.5TOTAL QTS OF GLUE1.7NOT TO SCALENEW CONDUIT DIAGRAMSECONDARY 2"SECONDARY 3"PRIMARY 2"CONDUIT LEGENDNEW PRIMARY UNDERGROUND CIRCUIT ONE-LINE DIAGRAMNOT TO SCALEEX UNDERGROUND CIRCUIT MAP 2305E040SCALE: 1" = 100'SITEEX OVERHEAD CIRCUIT MAP 2305E040SCALE: 6" = 1 MILESITEMINIMUM CLEARANCES FOR PSE EQUIPMENTNOT TO SCALEOIL-FILLED EQUIPMENTTRANSFORMERAPPROVEDAREACOMBUSTIBLE BUILDING WALLS & ROOF10'10'10'COOLING5' MIN5' MIN10' MIN5'MINFINSACCESSCONCRETE PADMINIMUM CLEARANCES FOR PSE EQUIPMENTNOT TO SCALECURB OR EDGE OF PAVEMENTCURB OR EDGE OF PAVEMENT5' MINROAD ORPARKING AREATYP. PAD& TRANS-FORMER3'MIN3' MINDOORACCESSDOORREQUIREDWORK SPACEAREA3' MINSECONDARY CABLE & CONDUIT TABLE - COMMERICAL (105087271)LOCATIONCABLECONDUITVOLTAGEASBUILT INFORMATIONSIZELENGTHASSUMEDSIZELENGTHBENDSDROPFLICKERForeman - CompleteFROMTO(1/O,4/O,350)Design (ft)Lot Corner toMeter (ft)(in)Design (ft)ƒƒƒƒ(Percent)(Percent)Actual Amount InstalledCableConduitV01H1A4/O120N/A3110221.30.24/O UG Triplex (ft) =1203" SCH80 COND. (ft)=1102200