Loading...
HomeMy WebLinkAboutMFP18000769DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP18000769 IVR Number: 18000769 Permit Informaon Permit Name:Puget Sound Energy - Electric Address/Locaon :02/05/2018Application Date:3276180130Parcel Number:1811 MONTEREY AVE NE Permit Type:02/21/2018Issue Date:Franchise Permit Work Class:02/21/2019Expiration Date:Major Utility Job Number:101107865Franchise Type:Electric Inspector:Todd Freih 206-999-1832 Description:REVISION: Portions of this project will now take place in the sidewalk and not the roadway. APPROVED WITH COMMENTS OR REDLINES THIS PERMIT IS FOR MAJOR CONSTRUCTION WORK IN THE ROW AND WILL BE BILLED AT AN ADDITIONAL $60/HR FOR INSPECTIONS. AFTER HOURS WORK AND WEEKEND WORK WILL BE BILLED AT $75/HR Replace existing underground riser and rebuild overhead termination @ P01. From P01 bore 152' south to BP2 and V01. Continue south 117' to BP3. Continue west 130' to V02. from BP3 bore 335' south to V03 to private property in soft shoulder to install primary power in new conduit via open trench. All other work to take place in private property. Pothole all existing utilities. Restoration per City of Renton standards. Contacts Name Address PhoneTypeBilling ANISH KUMAR PUGET SOUND ENERGY - ELECTRIC 6905 S 228th St Kent, WA 98032 B: (253) 208-2183Applicant Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: BL.005109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner ANISH KUMAR PUGET SOUND ENERGY - ELECTRIC 6905 S 228th St Kent, WA 98032 B: (253) 208-2183Specialized Billing X General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 | Published: 3/30/2017 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 3/30/2017 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street ☐ Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Puget Sound Energy - Electric 101107865 Anish Kumar 253-208-2183 anish.kumar@pse.com 1811 Monterey Ave NE 98056 101107865 Cable Remediation Replace existing underground riser and rebuild overhead termination @ P01 (318880-166434). From P01 bore approximately 152' South to BP2 and V01 (318869-166434) continue South approximately 117' to BP3. Continue West approximately 130' (continued below) Potelco Inc.253-208-2183 BL005109 Poteli*227PL 2/5/2018 MFP18000769 Scott Warlick 2/13/2018 Justin Johnson 2-19-2018 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: • Comply with all traffic regulations of the City of Renton and the State of Washington. • Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. • Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. • Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. • Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. • The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. • In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. • Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. • By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: Reset FormPrint Form 101107865 - Cable Remediation Program PSE/Potelco Inc. Carrie Ylenni 253-720-9700 6905 S 228th St, Kent, WA 98032 carrie.ylenni@pse.com 1811 Monterey Ave NE TBD 2/27/2018 Anish Kumar 2/5/2018 MFP18000769 Justin Johnson 2-19-2018 8:00 am to 3:00 pm Monday through Friday SKETCH I -- NORTH -- I NOTES: • Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. • The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. • Approved Temporary Traffic Control Plan must be at the work site during work hours. • Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. • Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. • Total road closure lasting more than 24 hours is subject to the approval by the City Council. • Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: • Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. • Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. • The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. • Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). to V02 (318853-166422). From BP3 bore approximately 335' South to V03 to private property in soft shoulder to install primary power cable in new conduit via open trench method. All other work is on private property. No pavement cuts anticipated. Restoration per City of Renton standards. POTHOLE ALL EXISTING UTILITIES 151515151515151512121515MONTEREY AVE NENE 19TH PLNE 20TH STNE 20TH STLINCOLN PL NE P01V01 STOPFLAGG ER STOPFLAGG ERSTOPFLAGG ER STOPFLAGGE RONE LANEROADAHEADW20-4100'100'100'ROADWORKAHEADW20-1W20-7ABEPREPAREDTOSTOPW3-4100'100'100'ROADWORKAHEADW20-1W20-7AONE LANE ROAD AHEAD W20-4100'100'100'ROAD WORK AHEAD W20-1W20-7AONE LANEROADAHEADW20-4ROADWORKAHEADW20-1 W20-7AROADWORKAHEADW20-1FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKING SIGNS TO BEPLACED ON BOTH SIDESOF THE WORK AREANO-PAR KRESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSUREUSE MAXIMUM AVAILABLESPACE FOR SIGNSAHEADUSE OTHER SIDESIDEWALK CLOSEDAHEADUSE OTHER SIDESIDEWALK CLOSEDallow 11' minimum Job#1011078651915 Monterey Ave NE, Renton, WAJanuary 27, 2018Sheet 1 of 5 brent.pogson@pse.com(425) 398-6158CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGYBORE PIT28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYPuget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 008997Card Exp. 08/13/2019gregory.harwood@pse.com(425)424-6425Notes:1. All signs and spacing to conform to the MUTCDand City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.4. Sign size can be a minimum of 48" x 48" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.m.MFP18000769 1515 151515151515 151512121515 MONTEREY AVE NEMONTEREY AVE NENE 19TH PL NE 20TH ST NE 20TH ST LINCOLN PL NEV01FROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARKING SIGNS TO BE PLACED ON BOTH SIDES OF THE WORK AREA NO-PARK RESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE USE MAXIMUM AVAILABLE SPACE FOR SIGNS STOP FLAGGER STOP FLAGGER STOP FLAGGER STOP FLAGGER BEPREPAREDTOSTOPW3-4 100'100'100'ROADWORKAHEADW20-1 W20-7A BEPREPAREDTOSTOPW3-4100'100'100'ROADWORKAHEADW20-1W20-7AONE LA N E ROAD AHEAD W20-4100'100'100'ROAD WORK AHEAD W20-1W20-7AONE LANEROADAHEADW20-4 100'100'100'ROADWORKAHEADW20-1 W20-7A AHEAD USE OTHER SIDE SIDEWALK CLOSEDAHEADUSE OTHER SIDESIDEWALK CLOSEDallow 11' minimum CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Job#101107865 1915 Monterey Ave NE, Renton, WA January 27, 2018 Sheet 2 of 5 brent.pogson@pse.com (425)398-6158 N PSE PUGET SOUND ENERGY BORE PIT 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 008997 Card Exp. 08/13/2019 gregory.harwood@pse.com (425)424-6425 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. 4. Sign size can be a minimum of 48" x 48" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m. MFP18000769 1515 15151515 1515 151512121515 MONTEREY AVE NEMONTEREY AVE NENE 19TH PL NE 20TH ST NE 20TH ST LINCOLN PL NESTOP FLAGGER STOP FLAGGER STOP FLAGGER ONE LA N E ROAD AHEAD W20-4100'100'100'ROAD WORK AHEAD W20-1W20-7AAHEADUSE OTHER SIDESIDEWALK CLOSEDAHEAD USE OT H E R S I D E SIDEW A L K C L O S E DONE LANEROADAHEADW20-4100'100'100'ROADWORKAHEADW20-1W20-7AFROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARKING SIGNS TO BE PLACED ON BOTH SIDES OF THE WORK AREA NO-PARK RESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE USE MAXIMUM AVAILABLE SPACE FOR SIGNS ROADWORKAHEADW20-1 V02 allow 11' minimumAHEADUSE OTHER SIDESIDEWALK CLOSEDCHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Job#101107865 1915 Monterey Ave NE, Renton, WA January 27, 2018 Sheet 3 of 5 brent.pogson@pse.com (425)398-6158 N PSE PUGET SOUND ENERGY BORE PIT 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 008997 Card Exp. 08/13/2019 gregory.harwood@pse.com (425)424-6425 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. 4. Sign size can be a minimum of 48" x 48" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m. MFP18000769 15151515 1515 151512121515 MONTEREY AVE NEMONTEREY AVE NENE 19TH PL NE 20TH ST NE 20TH ST LINCOLN PL NESTOP FLAGGER STOP FLAGGER ONE L A N E ROAD AHEAD W20-4100'100'100'ROAD WORK AHEAD W20-1W20-7AONE LANEROADAHEADW20-4100'100'100'ROADWORKAHEADW20-1W20-7AFROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARKING SIGNS TO BE PLACED ON BOTH SIDES OF THE WORK AREA NO-PARK RESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE USE MAXIMUM AVAILABLE SPACE FOR SIGNS STOP FLAGGER W20-7A allow 11' minimum CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Job#101107865 1915 Monterey Ave NE, Renton, WA January 27, 2018 Sheet 4 of 5 brent.pogson@pse.com (425)398-6158 N PSE PUGET SOUND ENERGY BORE PIT 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 008997 Card Exp. 08/13/2019 gregory.harwood@pse.com (425)424-6425 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. 4. Sign size can be a minimum of 48" x 48" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m. MFP18000769 15 15 15151515 1515 15151212MONTEREY AVE NENE 19TH PL NE 20TH ST STOP FLAGGER ONE LAN E ROAD AHEAD W20-4100'100'100'ROAD WORK AHEAD W20-1W20-7AONE LANEROADAHEADW20-4100'100'100'ROADWORKAHEADW20-1W20-7AFROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARKING SIGNS TO BE PLACED ON BOTH SIDES OF THE WORK AREA NO-PARK RESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE USE MAXIMUM AVAILABLE SPACE FOR SIGNS STOP FLAGGER V03STOP FLAGGERAHEAD USE OTHER SIDESIDEWALK CLOSEDAHEAD USE OTH E R S I D E SIDEWAL K C L O S E DBEPREPAREDTOSTOPW3-4 100'100'100'ROADWORKAHEADW20-1 W20-7A CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Job#101107865 1915 Monterey Ave NE, Renton, WA January 27, 2018 Sheet 5 of 5 brent.pogson@pse.com (425)398-6158 N PSE PUGET SOUND ENERGY BORE PIT 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 008997 Card Exp. 08/13/2019 gregory.harwood@pse.com (425)424-6425 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. 4. Sign size can be a minimum of 48" x 48" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m. MFP18000769 MFP18000769 MFP18000769 MFP18000769 MFP18000769