Loading...
HomeMy WebLinkAboutP_Design_104292131_V1_180206N E 1 0 T H S T SUNSET LN NENE SUNSET BLVDSUNSET NEIGHBORHOOD PARK CUSTOMER SUPPLIED WIRE 500KCM CUSTOMER OWNED CABLE INSTALLED & PROVIDE 3/4 CU. YD. OF SAND 4'x4' WORK PIT CUSTOMER OWNED CABLE INSTALLED & PROVIDE 3/4 CU. YD. OF SAND 4'x4' WORK PIT SITE PLAN N Vicinity Map N/A Owner / Developer Contact Info officeATTN: CITY OF RENTON 1055 S GRADY WAY RENTON, WA 98057 TODD BLACK (425) 430-6571 104292131THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) HP Svc/MSA HP Main Distribution Job Order Temporary Removal Relocation Perm. Service Superior ORDER#NOTIF# PWR PROJECT PHASE N/AN/A N/AN/A N/AN/A N/AN/A N/AN/A N/AN/A N/AN/A N/AN/A 104292131503624366 CABLE TV PHONE GAS FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" SCALE: 1" = 50' ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE PRE-11 2017 92 99 154 -6.42 - 92 105.42 154 OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP D. HONEYSETT 253-245-0883 10/07/17 D. HONEYSETT 253-245-0883 10/07/17 N/A N/A N/A D. BRINKMANN 206-794-8599 10/07/17 N/A CITY OF RENTON SUNSET NEIGHBORHOOD PARK UG TO UG SERVICE SUNSET LANE, RENTON, WA 98056 N/A N/A N/A 104292131 AS NOTED 1/1 KING COUNTY N/A N/A CSPCKEIN T23N,R05E,NW SEC 09 N/A N/A 2305E034 2305E040 2305E034 PRE-11 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A E-Mail: Cell Phone: Project Manager Contact Information: Manager:D. HONEYSETT 253-245-0883 DAVID.HONEYSETT@PSE.COM SITE PLAN SCALE: 1" = 50' SITE SPECIFIC NOTES: V01 - 318536-166710 -EXISTING VAULT AND 25kVA TUT TO REMAIN -CUSTOMER TO PROVIDE & INSTALL OWNED CABLE, 500KCM @ V01 -PSE TO ENTER VAULT WITH CUSTOMER CABLE & ENERGIZE WHEN CUSTOMER IS READY DEVELOPER & CUSTOMER NOTES: -CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING , SELECT BACKFILL, RESTORATION AND COMPACTION PER PSE STANDARDS #6750.6500. -CUSTOMER NEEDS TO PROVIDE PROOF OF L&I INSPECTION 72 HOURS PRIOR TO CONSTRUCTION -CUSTOMER TO PROVIDE AND INSTALL CUSTOMER OWNED CONDUIT & CABLE. ALL TRENCHING WILL REQUIRE AN INSPECTION BY PSE BEFORE FINAL BACKFILL. ALL TRENCH AND L&I INSPECTION MUST BE COMPLETED 72HRS BEFORE CONSTRUCTION. POWER GENERAL NOTES - COMMERICAL PROJECT 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. 2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. 3.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. 4.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. 5.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. 6.Roads shall be paved or have a compacted , crushed rock base in place. 7.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. 8.All work is to be done in accordance with local municipal and county permit requirements as applicable. 9.Inclement weather conditions may cause delays in construction times and dates. 10.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. JOB SITE Communications Primary Power Cables or Conduit Excavated Dirt Pile ROADSIDE Final Grade 24" Min 4" Min Separation 36" Min Cover 48" Max Backfill (No rocks over 10" diameter) Separation 12" Min Gas 4" Sand Bedding 32" Typical (Power, Gas, and Communications) JOINT TRENCH DETAIL Primary-Mainline Gas & Communications (NTS) Separation 12" Min 6" or 12" Min Sand Shading after Compaction - A 6" layer of sand is allowed when excavated native material contains rocks no larger than 8" in diameter. Trench and backfill requirements for primary electric line extension trenches (No PSE gas) - A 12" layer of sand is required when excavated native material contains rocks up to 10" in diameter. UNDERGROUND CIRCUIT MAP SCALE: 1" = 200' JOB SITE JOB SITE SCALE: NONE CONDUIT & CONDUIT DIAGRAM