HomeMy WebLinkAboutMFP18000784DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP18000784
IVR Number: 18000784
Permit Informa!on
Permit Name:Puget Sound Energy - Electric
Address/Loca!on:02/07/2018Applica!on Date:8860500330Parcel Number:321 S 20TH PL
Permit Type :02/19/2018Issue Date:Franchise
Permit Work Class:02/19/2019Expira!on Date :Minor U&lity
Job Number:101109890Franchise Type :Electric
Descrip!on:Crew to install new FG handhold and bore 1 3" conduit under rock wall to install new underground service to '321'.
Restora&on per City of Renton standards .
Contacts
Name Address PhoneTypeBilling
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC - BILLING
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Applicant
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: BL.005109Electrical Contractor : POTELI*344O4
Construc!on Contractor : POTELI*227PL
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC - BILLING
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Specialized
Billing
X
General Condi!ons & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Puget Sound Energy - Electric
101109890
Anish Kumar
253-208-2183
anish.kumar@pse.com
321 S 20th Pl 98055 101109890
Occupying E bound shoulder of S 20th Pl for crew to install new FG handhole &
bore (1) 3" conduit under rock wall to install new 4/0 TPLX underground service to '321'. No
pavement cuts anticipated. Restoration per City of Renton standards.
Potelco Inc.253-208-2183
BL005109 Poteli*227PL
2/07/2018
MFP18000784
Scott Warlick 2/13/2018
Justin Johnson 2-19-2018
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
Reset FormPrint Form
101109890
PSE/Potelco Inc.
Luke Neely 253-395-6866
6905 S 228th St, Kent, WA 98032
luke.neely@pse.com
321 S 20th Pl 98055
TBD
4/2/2018
Anish Kumar 2/07/2018
MFP18000784
Justin Johnson
2-19-2018
8:00 am to 3:00 pm
Monday through Friday
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
MFP18000784
SHATTUCK AVE SJOB SITE
General
-All work is to be completed per PSE Standards & Practices. Copies of all PSE Standards are available upon
request.
-Work sites shall be kept clear of debris and all construction materials; equipment and packing shall be
removed daily.
-Return all unused and removed poles, transformers and hardware to PSE, storeroom. All copper shall be
coiled and returned the day it is removed from the poles. Remove all unused pins and insulators.
-Return all streetlights, area lights and floodlights to Sumner yard.
Preconstruction
- Notify appropriate city, County or DOT authorities 48 to 72 hours, or as required by permitting agency, in
advance of starting work in Right-of-way involving a Permit.
- All system switching shall be approved by System Operations (425-882-4652) a minimum of 48 hours in
advance.
- Notify customers of all outages 48 hours in advance.
Work Drawings & Documents
- Field design changes shall be approved by PSE Project Manager or Engineer.
- Mark all field changes, equipment ID numbers and Underground cable information in red on Foreman's copy
of worksketch.
- Return one Foreman's copy of worksketch to Project Manager at completion of job.
- When permits are required, a copy shall be available on work site at all times.
Safety
- Refer to PSE standards 6275.3000 and 6275.6000 for system ground requirements.
- Refer to PSE standards 6275.9050 for personal protective grounding requirements.
- Refer to PSE standards 6275.9150 for vehicle grounding and barricading requirements.
- Proper line clearances shall be taken at the beginning, and released at the end, of each work day, or as
otherwise instructed by the System Operator.
- Provide signs, barricades, and traffic control in conformance with permit regulations.
- Utilize flagging and other vehicle traffic control as necessary and in conformance with local traffic regulations.
- Maintain traffic flow as required by permitting agency.
Erosion & Sediment Control
- Refer to PSE standards 0150.3200 for minimum requirements.
- Comply with all requirements of permitting agency.
- Installed erosion & sediment devices shall be maintained until vegetation has been re-established or
disturbed soil has been otherwise permanently stabilized.
Joint Facilities
- Coordinate with Communication Companies for transfers.
UNDERGROUND CONSTRUCTION
Excavation
-Trenching outside of the Right-of-way shall be of sufficient depth to provide a minimum of 36” of cover
for primary conductors and 24” of cover for secondary conductors.
-Road crossings and all trenches within the Right-of-way shall be of sufficient depth to provide a minimum
of 36” of cover for all conductors or as required by the permitting Agency.
-All conductors/conduits shall have a minimum of 3” of bed and 3” of clean sand cover.
-No rocks larger than 6” shall be included in backfill.
-Backfill in road crossings and within the Right-of-way shall be compacted to 95% density or as required
by the permitting Agency.
-Restore all excavated areas to original condition.
- If four or more six inch conduits are installed in a trench, fluidized thermal backfill (FTB) shall be
installed around the conduits to a depth of six inches above and to the sides of the conduit, and two
inches underneath, per PSE Standard 6790.0140.
Vaults & Handholes
- Refer to PSE standard 6775.0040 “Vault and Handhole Installation”
- Vaults shall be placed level and 2” above final grade in landscaped areas and flush with final grade when
placed in hard surface areas.
- A minimum 6” bed of 5/8” crushed rock shall be placed under all vaults.
- All conduit entrances shall be grouted.
Conductors & Conduit
- Refer to PSE standard 6800.6000 “PVC Conduit Installation”.
- Unless splices are called for, or otherwise noted or approved, conduit risers shall be plumbed directly to
road crossing conduits.
- Install insulating caps on all unused primary bushings.
- All “spare” conduits shall be capped at each end.
1-10-18 PER LUKE NEELY CELL 253-569-2523:
NOTE: RENTON PERMIT & ONE FLAGGER REQ'D
CORE HOURS, LOCATES, OUTAGE ON 5 RESIDENTIAL CUSTOMERS
O#420636
CUSTOMER CONTACT: LOUIS RODRIGUEZ 425-591-3293 Email: louissr08@gmail.com
PROBLEM: THE UG SVC TO 321 S 20TH PL, RENTON IS B/O UNDER THE GIANT ROCK WALL ON THE
WEST SIDE OF THE HOME.
FROM HH1 TO 321:
-BORE ONE 3-INCH CONDUIT UNDER THE ROCK WALL APPROX 30 FEET TO THE METER LOCATION
-PULL IN NEW 4/0 TPLX UG SVC APPROX 40 FEET
AT HH1:
-REPLACE THE FG HH AND 6-POS FARGOS IF IN BAD CONDITION
GENERAL SPECIFICATIONS
Scope of Work
GAS
PHONE
CABLE TV
N/A N/A
N/A N/A
N/A 108104546
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Perm. Service
Relocation
Removal
Temporary
Job Order
Distribution
HP Main
HP Svc/MSA
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)101109890N
Vicinity Map
NOT TO SCALE
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Correct QC Checklist(s) reviewed.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
L. NEELY 253-395-6866 1/12/18
L. NEELY 253-395-6866 1/12/18
L. ORTIZ 714-893-2405 1/12/18
N/A RENTON
GRA-25 321 S 20TH PL
REPLACE B/O UG SERVICE
321 S 20TH PL. RENTON, WA 98055
ASPLUNDH CONSTRUCTION CORP.
O-420636
101109890
AS NOTED 1/1
KING QCSOKE
SE 19-23N-05E
2305E076 2305E076 GRA-252305E076SW
11359760 101109890
Owner / Developer Contact Info
officeATTN:
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:LUKE NEELY
253-569-2523
LUKE.NEELY@PSE.COM
THOMAS GUIDE
656-B5
UNDERGROUND CIRCUIT MAP
SCALE: 1" = 50' MAP#: 2305E076SW
SITE MAP - UNIVERSAL MAP
SCALE: 1" = 50' MAP#: 2305E076
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE MAP#: 2305E076
32"
Typical
24"
Min
24"-36"
24"-36"
4'Top View
Electric & Joint Utility
Work Pit Dimensions
36"
Min
Drainage Pipe
12" Minimum Clearance
from Gas Service Lines
Conduit Depth
24" to 36" Max
Regulator Vent
Gas Meter Assembly
Utility Provided
48"
4'8"
Service (Permanent Detail)
Not to Scale
Seal
Conduit
Ends
Closed
4'8"
24" Min
36" Typical
3'
To Trench
Property Line
Conduit Stakes
Customer Provided
3" Schedule 40 Grey PVC
Power Cable Conduit
Customer Provided
Gas Service Line Conduit
Sch 40 White PVC
Customer Provided
3" Conduit Service Riser
Customer Provided
Elec. Mtr Base
Elec Mtr
utility provided
Gas Meter
Relief Vent
Building Wall
Elec. Mtr
SCALE: NONE
METER DETAIL @ "321 S 20TH PL"
PSE
No
No
No
Yes
Yes
Yes
"Flagging Required"
"Outages Required"
"Locates Required"
Luke Neely
Luke Neely
253-569-2523
253-569-2523
2/2/18
2/2/18
MFP18000784