Loading...
HomeMy WebLinkAboutP_Design_105085975_V1_1802121-1 € 31806 -1651 8 I• CIRCUIT FEET ADDED: AT V01 Sq. Footage: 45,000 SQ. I Panel Size: 1600 AMPS Heat Type: GAS Est. Demand: 382 . KW LRC: 260A 18863-1 61881 % V. Drop: 3.1 % 3X 2 kVA 120 208VI % Flicker: 2.1 % I �--- z + Lu +1 �c rY "301" ' 1 1\ 17 ' 318063-166188 "BC I 18069-1 6179 2 kVA 120 40V ' 11901" + 6• t R W 3183-16 188 M01 1600 CT METERING y 4 - RUNS CUSTOMER INSTALLED OWNED, MAINTAINED 01KCMIL QUAD -SERVICE -- V01 318073-166214 "'J INSTALL 500kVA 2771480V IJ II 318057-1 17 It . to I � f N 3RD ST 0301" 250" I "7209" "1207" �7 7" "249" SITE PLAN CALE: 1" = 50' 0 i i - I "336" "328" 1 1 318069-166179 12ov- - I � - 318083-166224 1 10kVA 1201240V "326" ZLU I Q I Z i D"318,, - - CQ7 I 1 € f L318073-1662241240 10kVAVA 1Z01240V- ' "370" I 1 - I + Jf304X R W f 318064-166224 - - dee 65T "3000 X3470 318057-16 _ ---� k__ - "7304" J 318057-166178 I -7248'- 11 48 SITE SPECIFIC NOTES AT J01: EXISTING 318057-166178 EXISTING VAULT AND JBOXES TO REMAIN -1NST. 3 - 12 kV 110 LB ELBOWS PER STD 6041.1004 (ELBIOJ) AT J02: EXISTING 318063-166188 EXISTING 4'8"' X T X 5' VAULT TO REMIAN -INST. 3 - 4 POS JBOX PER STD 6055.1030 (MID: 7625900) -INST. 6 - 12kV 110 LB ELBOWS & 6 DC'S PER STD 6041.1000 (EL810J) AT V01: NEW GRID 318073-166214 -INST. 1 - 7'X TX 3'6" VAULT & 8'X 8' X 6" LID WITH 24" X 44" ACCESS PER STD 6045,5000 (PM3P15M) -INST. 1 - 5OQkVA 277/480V PM TRF PER STD 6045.5000 (3PMZB4Z) -INST- 4 - 4POS 600KCMIL TO 1000KCMIL SECONDARY BLOCKS (MID; 7651003) -INST- 16 - CONNECTOR MOUNTING BOLD KITS (MID: 7651008) -INST. NEW GRID 318073-166214 CONNECT AND TAG 4 RUNS OF CUSTOMER INSTALLED, OWNED, MAINTAINED 600KCMIL CU QUAD AT M01: PSE METERING DEPARTMENT TO INSTALL CTS AND ASSOCIATED METERING EQUIPMENT SPAN NOTES SEE CABLE & CONDUIT TABLE ON PAGE 2 FOR CABLE INFO DEVELOPER & CUSTOMER NOTES: THE CUSTOMER IS RESPONSIBLE FOR PROVIDING ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS 6750 6500 -REQUIRED TO PROVIDE 77' X 7 9' WORK PIT & 2 CUBIC YARD OF 518" MINUS AT V07 -REQUIRED TO PROVIDE 4'X 4' WORK PIT & 1 CUBIC YARD OF 5/8" MINUS AT J02 -REQUIRED TO FOLLOW ALL FRENCH DETAILS ON SELECT BACKFILL -REQUIRED TO PROVIDE EQUIPMENT TO PUMP OUT WA TER FOR WORK PITS & TRENCH AT ALL TIMES -EXCAVATE & EXPOSE EXISTING PSE UG FACILITIES 48 HOURS PRIOR TO CONSTRUCTION -PSE INSPECTION IS REQUIRED PRIOR TO FINAL BACKFILL -PSE WILL NOT ENERGIZE FACILITIES UNTIL BACKFILL IS COMPLETE -L&I INSPECTION & APPROVAL IS REQUIRED 72 HOURS PRIOR TO CONNECTION -RESPONSIBLE FOR ALL TREE TRIMMING AND BRUSH CLEARING TRANSFORMER tINSTALLATION Installed at site: Vol 1 Grid Number: 318073-166214 kVA Rating: _500kVA MaterialID#: _6259250 Foreman to redline the following information Company ID#: Primary phase connected to: Tested Secondary Voltage POWER GENERAL NOTES - COMMERCIAL PROJECT 1. All materials to be instailed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. 2. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance, 3. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. 4. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. 5. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. 6. Roads shall be paved or have a compacted , crushed rock base in place, T CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. 8. All work is to be done in accordance with local municipal and county permit requirements as applicable. 9. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. 10. Inclement weather conditions may cause delays in construction times and dates. 11. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. CIRCUIT LOADING TABLE CIRCUIT: GRA -17 AS OF 6113117 A PHASE B PHASE C PHASE EXIST. PEAK LOAD 218 256 244 EST. NEW LOAD 23.65 23.65 23.65 TOTAL 241.65 279.65 267.65 EROSION & SEDIMENT CONTROL REQUIREMENTS EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) FOREMAN (CHECK BOX WHEN COMPLETED) ❑ PSE Equipment LOCKED/SECURED & Work Area left in CLEANISAFE Condition. ❑ Grid, Cable, and Switch numbers INSTALLED & VERIFIED. ❑ Field Changes RED -LINED on As -built - Ma teria f s-built- Materiaf VERIFIED and CHANGES noted on Paperwork. © Total PRIMARY Cable noted on As -built. ❑ Company IDW$ RECORDED in correct Iocation on As -Witt. ❑ Indicate correct FUSE SIZE on As-Wik & VERIFY proper PHASE- ❑ Deviations noted on the As -built and their reason, ❑ 1 certify that the work performed meets PSE's standards and procedures and that all quality requirements are met, Foreman's Signature Print Name vroject manager contact Information: Manager. Marc Bayley Calf Phone: {253) 259.4494 E -Mail: MARCUS.BAYLEY@PSE.COM Developer Yes x Yes PSE "Locates Required" No No x 71 "outages Required" Yes No x "'tagging Required" Yes x No Vicinity Map NIA For contacts below dial 1 -888 -CALL PSE (225-5773) =ALL.1111 TWO BUSINESS DAYS BEFORE YOU DIG THIS SKETCH NOT TO BE REUEr7 UPON FOR EXACT LOCATION OF EXISTING FACILITIES REAL ESTATEIEASEMENT PERMIT REQUIRED CITY OF RENTON s Itsuo[-1i]blol ow-r`nVo I I - C010160 A ■uL l A•�- G =:•• i L/ y'rV l ..v.,.,� - : • �.. 3: .� 4OT� •' 170 $•L 30••� cry 6•�" •�; 318057-1$&178 31$061-168207 -' t° �•; •.. T•. 3� 75kVA 12Qf24tly f '�•• I cv�#a97s C0-EH0812 318061 166191 . ST 3 NIA 2 NIA NIA FUNCTION CONTACT PHONE NO DATE 60kYA 1201240v 1 Cld10158 37.8kVA 12G12A0►r .318057-16622 i •." ••"••y 1{45 7(7694 4 xg x �� . , /VIA NIA NIA PROJECT MGR Marc Bayley y y {253] 259-0494 9!12117 _-- 10159 •••. P Colo 30 3.., t3 RDV7&W 3m ,� '� .�: T A&� 3�' Ik fi5T 100T :•• •'30 ••• : 5 A �'� fi5T 1 NIA NIA NIA ENGR • POWER Nate Linville 253 970-7284 91121#7 } NEUTRAL 0 ,1 CM r' n :.. 1e N •30'y 3� �°� C) •�• P :•. ;•• {,• 94 `fit -So CR REV# DATE BY DESCRIPTION ENGR - GAS NIA NIA NIA .: ,.�, rmv,_,,,=,=Q, 0, """0"� "'E "r �: r. • •��3� i {� . �, c� 74 gt EV- 3 P g� ; .• - a � COUNTY Emer Sect Gas Wk Ctr POWER WK CTR DRAWN BY Nate Linville (253) 970-7284 i • `• 93x1` 17 @C04249 ;' ;JI ' :. :............ S :,• KING Id SEC NIA NIA CSPSKEPM CHECKED BY Z 5 +� orf 2 4 f 7 Jc•.�.ST.� ,: 30 30.,; : X1 ��$`.? 1J3216 ••'�� "' :, QP MAP PLAT MAP APPROVED 8Y I 857 3� 3�'' ....... .�j..... ••� H _ :••t•• . ,�..3� 1OOT *3� ' J •, x4015 3e 30 •? 7-1 •� ••`• 3 NW -17-23-05E NIA NIA FOREMAN #1 air Z A058334 �� Brlf5B335 t. .., _; 3 x�14� „� •.• ;B a'+,,A.••`"'`""' •p U -MAP NO {POWER} OH CKT MAP UG CKT MAP CIRCUIT NO FOREMAN #2 CQJ58338 ` T x657.;:,.....; ;5 $ ...`� ••4F..ti..1�.T' WT V�: •,C• ' �L •.7 ,C 5*J sr. •• ��' . 2305EO66 2305EG40 2305Et766 GRA -17 MAPPING 1t3r591 • .. J• ST.: ,,••' 1 I.1kk--__.. 'WN0 '•• coio�9z $ •• :ear? • 3 S �•. •;; t: •'' •••:.i...••` . li f 9 0 JOINT FACILITIES ARRANGEMENTS .l�. • • ;'s : n C; ' .•6 C CL•�� Gr r ' :' UTILITIES NIA NIA NIA ....'ti.•• 3 •'� X1 X34 U $ \7L11315 •. '�~�p� ..... • i''' '; C011 x3 '`q .II,C 30 1J 46 CONTACT NIA NIA NIA NIA Q .- �•�65T E► 7 %}•.{j-.:•+ .i... X13[}1 : f� : 1- $ 4 x117 ; ; ��� sr... PHONE# NIA NIA NIA NIA I r ; , 1 407 �•• 4] • x �� ' NIA �� �. - ,C Door ��; 3;. z5� r ,,� GRA T is PUGFi' SARTORIELEMENTARY INCIDENT NIA MAOP UNDERGROUND CIRCUIT MAP 2305EO66 T SOUND OVERHEAD CIRCUIT MAP {23�5E�4p} SCALE: 30 PRI LE, SET500kVA 277/480V PM TRF ENERGY gas orae' NIA Elect Order iasp85g75 6" = 1 MILE "� SCALE: 6" = 1 MILE 332 PARK AVE N, RENTON, WA 98057 SCALE PAGE AS NOTED 1 OF 2 2-6" DB120 CONDUIT EXISTING 2 - 4" DB120 CGNDIT 11' X 11' WORK PIT EXISTING FUTURE 2 - 2" DB120 CONDUIT 2 - 4" DB120 CONDUIT 2 - 6" DB120 CONDUIT EXISTING FUTURE 2 - 2" DB120 CONDUIT 2 - 4" DB120 CONDUIT JB2 � 4'X 4' WORK PIT a ±250' EXISTING 2 - 4" DB120 CONDUIT CONDUIT DIAGRAM SCALE: NONE 5' MIN CURB, WALL, OR EDGE OF PAVEMENT 3' MIN 5' MIN V MIN TVP. PAD & TRANS- FORMER COOLING FINS 3' MIN REQUIRED 5' MIN WORK SPACE AREA �+---- 5' MIN -I- ACCESS DOOR 1 10'MIN— — ACCESS r DOOR CONCRETE PAD 0 CV 90° NEW 1 - 4" DB120 CONDIT ROAD OR PARKING AREA CURB, WALL, OR EDGE OF PAVEMENT y AT V01 - MINIMUM CLEARANCES FOR PSE EQUIPMENT Not to scale 6775.0035 11' X 11' WORK PIT I Q` NEW 110 AL JKT r AO-EHO813 BO-EHO814 J02 CO-EHO815 ±250' 4'X 4' WORK PIT a [V H NEW 110 AL JKT AO-EHO810 BO-EHO811 JB1 CO-EHO812 CABLE DIAGRAM SCALE: NONE 81-0" $ or 10'-0" 4'-2" 3'-6" 7'-0" 7'-010 TOP VIEW SIDE VIEW I Excavation - 20 cubic yards AT V01 - VAULT & EXCAVATION DETAIL Not to scale 6054.5000 ROAD SIDE (PREFERRED) M11VIINI TMIN TMIN TOP VIEW VAULT LID I I 6'MIN FIELD SIDE (PREFERRED) J01 AND J02 WORKING SPACE Not to scale vi I.a.vv.,.ra.vc 2" 6" f f Crushed 4'-6" Rock I PRIMARY CABLE & CONDUIT TABLE LOCATION CONDUIT PRIMARY CABLE ASBUILT INFORMATION SIZE (in) Qty LENGTH Design BENDS PULL (lbs) PULL Rev Obs) Cable Size LENGTH Design Cable Numbers Please Record Foreman - Complete FROM TO 900 45' 22' 110 A B C Manufacturer Compound Year Actual Amount Installed (Conduit & Cable) Jot J02 4 1 Existing - - - - 39 59 110 AL JKT 54 EHO810 J01 166178 EHO811 EXISTING 3 EHO812 J02 Vol 4 1 370 1 - - - 166 143 110 AL JKT 440 EHO813 EHO814 318073 7' x 7'X 4V VAULT EHO815 Vault & Equipment Table Site Grid Vault Size Type & Size Primary Bushings Transformer ASBUILT 104FORMATION PROJECT MGR Marc Bayley (253) 259-4494 9112117 Number & Comer Equipment REV# DATE COUNTY KING ID Numbers Foreman -Complete ENGR - GAS WA N/A A DRAWN BY Nate Linville (253) 970-7284 (� CHECKED'BY 25 2 Z Iso 114 SEC NW -17-23-05€ In Vault (Company ID) APPROVED 13Y FOREMAN #1 U -MAP NO (POWER) 230SE066 OH CKT MAP UG CKf VAP CIRCUIT NO 230SE040 2305E066 I GRA -17 FOREMAN #2 MAPPING JOINT FACILITIES ARRANGEMENTS LB DC WA N/A NIA NIA WA NIA NIA WA WA NIA NIA NIA 318057 J01 166178 EXISTING EXISTING 3 - J02 318063 EXISTING 3 - 4POS JBOX 6 6 166188 MID: 7625940 318073 7' x 7'X 4V VAULT 500kVA 277/480v Vol W/V X V X r LID PM TRF 3 - 165214 MID:7917901 MiD:6259250 I 1 j MIN f 3' 3' 0 MIN MIN I 10 I - _ _ 1 �I N j III V01 ENCLOSURE CLEARANCE DETAIL A SCALE: NONE Trench and backfill requirements for primary electric line extension trenches (No PSE gas) - A 12" layer of sand, 518" minus, or clean shading is required when excavated native material contains rocks up to 10" in diameter. - A 6" layer of sand, 518" minus, or clean shading is allowed when excavated native material contains rocks no larger than 8" in diameter. Excavated Dirt Pile—, ROADSIDE� 18■ 24" Min Final Grade Typical To Excavated Dirt Pile Backfill for DB 120 Conduit/Direct Buried Cable 4" Min i (Ilio Rocks over 90" Diameter) 48" " Separation Max Min CoverW..t.. .... . ... .. 6" or 12" of sand, 518" minus or clean backfill shading _ \< . - -. `, 3" of sand, 518" minus, or clean backfill bedding Phone & TV J L Primary Power Cable in PSE provided DB120 Grade Conduit JOINT TRENCH DETAIL Primary- DB 120 (NTS) 120' DEDICATED FACILITIES For contacts below dial 1 -888 -CALL. PSE (225-5773) CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACWTIES REAL ESTATEIEASEMENT PERMIT REQUIRED CITY OF RENTON 3 NIA NIA NIA FUNCTION CONTACT PHONE NO DATE 2 WA NIA WA PROJECT MGR Marc Bayley (253) 259-4494 9112117 1 WA NIA NIA ENGR - POWER Nate Linville (253) 970-7284 9112117 REV# DATE COUNTY KING BY DESCRIPTION Emer Sect Gas Wk Ctr WA NIA POWER WK CTR CSPSKEPM ENGR - GAS WA N/A A DRAWN BY Nate Linville (253) 970-7284 (� CHECKED'BY 25 2 Z Iso 114 SEC NW -17-23-05€ OP MAP WA PLAT MAP WA APPROVED 13Y FOREMAN #1 U -MAP NO (POWER) 230SE066 OH CKT MAP UG CKf VAP CIRCUIT NO 230SE040 2305E066 I GRA -17 FOREMAN #2 MAPPING JOINT FACILITIES ARRANGEMENTS UTILITIES CONTACT PHONE# WA N/A NIA NIA WA NIA NIA WA WA NIA NIA NIA OP NIA WA PUGET SARTORI ELEMENTARY INCIDENT MA SOUND 30 PRI LE, SET 50okVA 277/480V PM TRF G as IM8 Order 5 ENERGY 332 PARE{ AVE N, RENTON, WA 98057 SCALE PAGE AS NOTED 2 OF 2