Loading...
HomeMy WebLinkAboutP_Design_Sonic1_105083037_V1_180227JOB SITE "732" DUTCH BROS. COFFEE SONICSHARDIE AVE SWEAR 15 AØAFT771 BØAFT772 CØAFT773 AØAFT765 BØAFT766 CØAFT767 AØAFT774 BØAFT775 CØAFT776 RAINER AVE S45' N Vicinity Map N/A Owner / Developer Contact Info officeATTN: BONNELL FAMILY LLC 10047 MAIN STREET, #509 BELLEVUE, WA 98004 PETER BONNELL (425)-891-3529 105083037THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. GAS PHONE CABLE TV 503247117 105083037 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A PROJECT PHASE PWR NOTIF#ORDER# Superior Perm. Service Relocation Removal Temporary Job Order Distribution HP Main HP Svc/MSA POWER GENERAL NOTES - COMMERCIAL PROJECT 8. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. Inclement weather conditions may cause delays in construction times and dates. 1. 2. 3. 4. 5. 6. 7. 9. 11. 10. PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" E-Mail: Cell Phone: Project Manager Contact Information: Manager:DEVENDRA KUMAR 425-516-5486 devendra.kumar@pse.com DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP D. KUMAR 425-516-5486 10/24/16 D. KUMAR 425-516-5486 10/24/16 N/A N/A N/A J.REIBMAN N/A 10/24/16 N/A CITY OF RENTON SONIC DRIVE-IN INSTALL 3Ø TRF & PERM SVC ___ HARDIE AVE SW, RENTON, WA 98057 N/A N/A N/A 105083037 AS NOTED 1/2 KING N/A N/A CSPSKEIN T23N, R05E, NW SEC 19 N/A N/A 2305E074 2305E076 2305E074 EAR-15 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A SITE PLAN OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE CIRCUIT FEET ADDED: 45' SCALE: 1"=40' CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE 132.92142149 0.92-- 132142149 2016 EAR-15 DEVELOPER CIVIL CONTRACTOR NOTES : ·REQUIRED TO PROVIDE AN 11' X 9' PIT AT THE NEW 3 PHASE JUNCTION BOX @ J02 ·REQUIRED TO PROVIDE AN 6' X 6' PIT AT THE NEW 1 PHASE TRANSFORMER VAULT @ V01 CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING ,SELECT BACKFILL ,COMPACTION &RESTORATION PER PUGET SOUND ENERGY STANDARDS.6750.6500 # **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL ** PSE TO PROVIDES CONDUITS: ·PSE TO PROVIDE 3/8 POLY RATED 1800LBS PULL ROPE IN ALL CONDUITS. DEVELOPER EXCAVATION NOTES: ·REQUIRED TO EXCAVATE &EXPOSED EXISTING PSE UG FACILITIES 48HOURS BEFORE CONSTRUCTION ·ALL EQUIPMENT MUST BE PROTECTED FROM VANDALS WITH STEEL PLATE 48HOURS BEFORE CONSTRUCTION. ·EXCAVATION MUST BE COMPLETED 48HOURS PRIOR TO CONSTRUCTION . ·REQUIRED TO HAVE EXCAVATION EQUIPMENT ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING FOR THE UG PRIMARY &INSTALLATION OF THE 1PH OR 3PH VAULT . ·BACKFILL /COVER REQUIRED ON PRIMARY . CONTRACTOR TRENCHING IN CITY OR COUNTY OR W .S .DOT RIGHT OF WAY NOTES : PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT . IF A PRE-CON IS REQUIRED BY THE CITY ,COUNTY OR W .S .DOT A PSE PROJECT MANAGER WILL SET -UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS ALL INSPECTIONS ARE REQUIRED BY POTELCO INC ·IF A SECOND INSPECTION IS REQUIRED ,ADDITIONAL FEE 'S WILL BE APPLIED. DEVELPER IS RESPONSIBLE TO PROVIDE CUSTOMER OWNED SERVICE CONNECTION ā DEVELOPER IS REQUIRED TO OBTAIN AN L&I INSPECTION APPROVAL STICKER FOR 3000A METER BASE PSE METER DEPT : ā PSE METER DEPT WILL PROVIDE 3000A 277/480v METER AFTER INSPECTION APPROVAL SITE SPECIFIC NOTES J01(;,67,1*‘-81&7,21%2; (;,67,1*‘35,0$5<-81&7,21%2;725(0$,1,13/$&( -INSTALL 3 L/B ELBOWS: EHE445-A, 446-B, 447-C V011(:30‘75) -INSTALL NEW 4' 8" SQ VAULT & 8' x 8' COVER W/ 20" x 44" ACCESS HOLE -INSTALL NEW 150kVA PM TRF -120/208V -INSTALL (3) 1/0 SOL JKT ELBOWS -CONNECT AND TAG CUSTOMER OWNED, INSTALLED AND MAINTAINED UG SECONDARY *_RUNS OF __MCM QUAD SERVICES - INSTALL GRID NUMBER SPAN NOTES Note to Foreman: See PG-2 for Span Notes