HomeMy WebLinkAboutP_Design_Sonic1_105083037_V1_180227JOB SITE
"732"
DUTCH BROS.
COFFEE
SONICSHARDIE AVE SWEAR
15
AØAFT771
BØAFT772
CØAFT773
AØAFT765
BØAFT766
CØAFT767
AØAFT774
BØAFT775
CØAFT776 RAINER AVE S45'
N
Vicinity Map
N/A
Owner / Developer Contact Info
officeATTN:
BONNELL FAMILY LLC
10047 MAIN STREET, #509
BELLEVUE, WA 98004
PETER BONNELL (425)-891-3529 105083037THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
GAS
PHONE
CABLE TV
503247117 105083037
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Perm. Service
Relocation
Removal
Temporary
Job Order
Distribution
HP Main
HP Svc/MSA
POWER GENERAL NOTES - COMMERCIAL PROJECT
8.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits
and crossings from the individual unit's meter base to the designated connection point.
Inclement weather conditions may cause delays in construction times and dates.
1.
2.
3.
4.
5.
6.
7.
9.
11.
10.
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:DEVENDRA KUMAR
425-516-5486
devendra.kumar@pse.com
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
D. KUMAR 425-516-5486 10/24/16
D. KUMAR 425-516-5486 10/24/16
N/A N/A N/A
J.REIBMAN N/A 10/24/16
N/A CITY OF RENTON
SONIC DRIVE-IN
INSTALL 3Ø TRF & PERM SVC
___ HARDIE AVE SW, RENTON, WA 98057
N/A N/A
N/A 105083037
AS NOTED 1/2
KING N/A N/A CSPSKEIN
T23N, R05E, NW SEC 19 N/A N/A
2305E074 2305E076 2305E074 EAR-15
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
SITE PLAN
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE
CIRCUIT FEET ADDED: 45'
SCALE: 1"=40'
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
132.92142149
0.92--
132142149
2016
EAR-15
DEVELOPER CIVIL CONTRACTOR NOTES :
·REQUIRED TO PROVIDE AN 11' X 9' PIT AT THE NEW 3 PHASE JUNCTION BOX @ J02
·REQUIRED TO PROVIDE AN 6' X 6' PIT AT THE NEW 1 PHASE TRANSFORMER VAULT @ V01
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING ,SELECT BACKFILL ,COMPACTION &RESTORATION PER PUGET
SOUND ENERGY STANDARDS.6750.6500 #
**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL **
PSE TO PROVIDES CONDUITS:
·PSE TO PROVIDE 3/8 POLY RATED 1800LBS PULL ROPE IN ALL CONDUITS.
DEVELOPER EXCAVATION NOTES:
·REQUIRED TO EXCAVATE &EXPOSED EXISTING PSE UG FACILITIES 48HOURS BEFORE CONSTRUCTION
·ALL EQUIPMENT MUST BE PROTECTED FROM VANDALS WITH STEEL PLATE 48HOURS BEFORE CONSTRUCTION.
·EXCAVATION MUST BE COMPLETED 48HOURS PRIOR TO CONSTRUCTION .
·REQUIRED TO HAVE EXCAVATION EQUIPMENT ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING
FOR THE UG PRIMARY &INSTALLATION OF THE 1PH OR 3PH VAULT .
·BACKFILL /COVER REQUIRED ON PRIMARY .
CONTRACTOR TRENCHING IN CITY OR COUNTY OR W .S .DOT RIGHT OF WAY NOTES :
PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT .
IF A PRE-CON IS REQUIRED BY THE CITY ,COUNTY OR W .S .DOT A PSE PROJECT MANAGER WILL SET -UP AND
SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS
ALL INSPECTIONS ARE REQUIRED BY POTELCO INC
·IF A SECOND INSPECTION IS REQUIRED ,ADDITIONAL FEE 'S WILL BE APPLIED.
DEVELPER IS RESPONSIBLE TO PROVIDE CUSTOMER OWNED SERVICE CONNECTION
ā DEVELOPER IS REQUIRED TO OBTAIN AN L&I INSPECTION APPROVAL STICKER FOR 3000A METER BASE
PSE METER DEPT :
ā PSE METER DEPT WILL PROVIDE 3000A 277/480v METER AFTER INSPECTION APPROVAL
SITE SPECIFIC NOTES
J01(;,67,1*-81&7,21%2;
(;,67,1*35,0$5<-81&7,21%2;725(0$,1,13/$&(
-INSTALL 3 L/B ELBOWS: EHE445-A, 446-B, 447-C
V011(:3075)
-INSTALL NEW 4' 8" SQ VAULT & 8' x 8' COVER W/ 20" x 44" ACCESS HOLE
-INSTALL NEW 150kVA PM TRF -120/208V
-INSTALL (3) 1/0 SOL JKT ELBOWS
-CONNECT AND TAG CUSTOMER OWNED, INSTALLED AND MAINTAINED UG SECONDARY
*_RUNS OF __MCM QUAD SERVICES
- INSTALL GRID NUMBER
SPAN NOTES
Note to Foreman:
See PG-2 for Span Notes