HomeMy WebLinkAboutP_Design_105087529_V1_18030117106
PARCEL # 2892700060
17030
17105
#2ACSR#2ACSR17001
17007
17013
17021
17105
17113
17119
17127
17135
17143
17151
17159
11402
11406
11403
11408
1140111407
16922
17004
17014
17022
17030
17114
17122
16925
17009
17015
17023
17105
17107
17109
17123
16927
11307 1131716915
16917
SE 170TH ST
SE 170TH ST
113TH AVE SE113TH AVE SES
E 171ST PL
SE 171ST ST
114TH AVE SE114TH AVE SE114TH AVE SE114TH AVE SE113TH AVE SE60'
316687-166477
25 kVA 120/240V (C)
17107
ROL
15
114TH AVE SE118TH LN SE110TH LN SEtexttextt
exttext text
text
t exttext
116TH AVE SE120TH LN SE120TH TER SE1
1
9TH PL SESE 170TH ST
SE 173RD ST
SE 173R D S T
108TH WAY SES
E
1
7
0
T
H
P
L 120TH AVE SESE 169TH P L
113TH AVE SE117TH AVE SE- CUSTOMER TO INSTALL 1-3" SCH'L 80 CONDUIT, ±125'
- PSE TO INSTALL 1-RUN 4/O UG TPX, ±165'
CUSTOMER SUPPLIED
4' X 4' WORK PIT
CUSTOMER SUPPLIED
CUSTOMER SUPPLIED
4' X 4' WORK PIT
CUSTOMER SUPPLIED
3/4" CUBIC YARD OF SAND
1 CUBIC YARD 5/8" CRUSHED ROCK
SITE PLAN
POWER GENERAL NOTES - RESIDENTIAL PROJECT
N
Vicinity Map
N/A
Owner / Developer Contact Info
officeATTN:
JACK ZHENG
4957 LAKEMONT BLVD SE C4-323
BELLEVUE, WA 98006
JACK ZHENG 425.442.9628
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE
SCALE: NONE
NEW CABLE & CONDUIT DIAGRAM
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
HP Svc/MSA
Distribution
Job Order
Temporary
OH Maintenance
Removal
Perm. Service
Superior
ORDER#NOTIF#
PWR
PROJECT PHASE
N/AN/A
N/A
N/AN/A
N/AN/A
593192115N/A
108104522N/A
101109871N/A
CABLE TV
PHONE
GAS
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
10.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Inclement weather conditions may cause delays in construction times and dates.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
3000
200A
GAS
10KW
65A
2.3%
2.4%
8.
9.
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
X
X
X
X
SCALE: 1" = 50'105087529THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
Service Stubs
105087529
N/A
N/A
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
D. HONEYSETT 253.245.0883 .
D. HONEYSETT 253.245.0883 .
N/A N/A N/A
E. ORTIZ 714.893.2405 1/18/2018
N/A RENTON
ZHENG RESIDENCE
TRF UPGRADE & OH TO UG SVC
17106 113TH AVE SE, RENTON, WA 98055
N/A N/A
N/A 105087529
AS NOTED 1 OF 1
KING N/A N/A CSPSKEIN
29SE-T23R-05E N/A N/A
2305E116 2305E136 2305E116 ROL-15
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
505307941
N/A
CIRCUIT FEET ADDED: 0'
Installed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER INSTALLATION
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
P01
316687-166477
25kVA
6211250
CUSTOMER & DEVELOPER NOTES
THE CUSTOMER IS RESPONSIBLE TO PROVIDE ALL TRENCHING, SELECT BACKFILL, COMPACTION &
RESTORATION PER PUGET SOUND ENERGY STANDARDS 6750.6500
5(48,5('723529,'( ,167$//´',6&217,182866&+('8/(39&&21'8,7)520P01-M01 +/- 125'
5(48,5('723529,'( ,167$//´12132/<38//523(,1$//&21'8,76
-REQUIRED TO PROVIDE 4' X 4' WORK PIT & 1 CUBIC YARD 5/8" CRUSHED ROCK AT P01
5(48,5('723529,'(¶;¶:25.3,7 &8%,&<$5'2)6$1'$7M01
-REQUIRED TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL
-REQUIRED TO PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS & TRENCH AT ALL TIMES
-REQUIRED TO EXCAVATE & EXPOSE EXISTING PSE UG FACILITIES 48 HOURS PRIOR TO CONSTRUCTION
-PSE INSPECTION IS REQUIRED PRIOR TO FINAL BACKFILL
-PSE WILL NOT ENERGIZE FACILITIES UNTIL BACKFILL IS COMPLETE
-RENTON CITY INSPECTION & APPROVAL IS REQUIRED 5 BUSINESS DAYS PRIOR TO CONNECTION
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
ROL-15
6/8/2017
305.00 310.00 329.00
1.46 0.00 0.00
306.46 310.00 329.00
SITE SPECIFIC NOTES
AT P01: 316687-166477
-REMOVE EXISTING 40' CL 3 POLE (1963)
-INSTALL NEW 45' CL 2 POLE (2018)
,167$//N935,1(87$&657$33(567'
-INSTALL 25kVA 120/240v (FUSE @ 10T) (TRFRXF) PER STD 6025.1000
,167$//$/80,18067,5583&/$03 7$3&2254100)
-INSTALL 3" SEC RISER (RIS3CSS) PER STD 6042.1000
-TRANSFER EXISTING OH SVC'S "17030", "17105" & "17107"
-TRANSFER EXISTING STREET LIGHT (SLAG4403)
M01 AT "17106EW PERMANENT METER
-PSE METER DEPARTMENT TO SET CL200A METER
M02 AT "17106" REMOTE TEMP METER
-PSE METER DEPARTMENT TO REMOVE TEMP METER
SPAN SPECIFIC NOTES
P02 TO M01 "17106":
&86720(572,167$//',6&217,18286*5(<6&+
/&21'8,7
,167$//58128*73;¶
P01 TO M02 "17106" (TEMP METER):
-REMOVE EXISTING OH SVC CONDUCTOR
OUTAGE LIST
-17030, 113TH AVE SE, RENTON, WA 98055 - PACIFIC BRIDGE VENTURES LLC
-17105, 113TH AVE SE, RENTON, WA 98055 - SALAYMANG HALIMAH
-17107, 113TH AVE SE, RENTON, WA 98055 - CARTER STANLEY
JOB SITE
JOB SITE
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:DAVE HONEYSETT
253-245-0883
DAVE.HONEYSETT@PSE.COM
TV & TEL Electric Service Cable in Conduit
3" Schedule 80 Grey PVC
Excavated Dirt Pile
Final Grade
24" Min
24" Min
to
36" Max
Cover
Backfill for Conduit
Free of rocks
larger than 8"
in diameter
Separation
6" Min
in Conduit
Schedule 40 White PVC
Gas Service Line
32" Typical
(Power, Gas,
Phone & Cable)
Separation
4" Min
12" Min
Separation
36" MINIMUM COVER
IN RIGHT OF WAY
JOINT TRENCH DETAIL
Joint Service Line in Conduit (NTS)
To Excavated Dirt Pile
Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris,
glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.
kWh Mtr
Elec. Mtr Base
12" Min 36" Typical
24" to 36" Max
Conduit Depth
Power Cable Conduit
Customer Provided
3" Schedule 40 Grey PVC
Regulator Vent
Utility-Provided
Gas Meter Assembly
Min
36"
Customer Provided
Conduit Stakes
48"
48"
Top View 4'
2 1/2" Conduit Service Riser
from Gas Service Lines
12" Minimum Clearance
Customer Provided
Drainage Pipe
Work Pit Dimensions
Electric & joint Utility
4'
MTR BASE DETAIL
SCALE: NONE
@ M01
POLE TABLE (NEW)
Site
#
Pole Data
Grid #Height Class Year Remarks / Location Ref.
P01 316687-166477 45 CL-2
POLE RETIREMENT TABLE TEMP TRANSFERS ST. LIGHT TRANSFERS
SITE
#
POLE DATA POLE
TEL TV FIBER TRAN RMVD ID NUMBER
GRID #HEIGHT CLASS YEAR TOPPED RMVD
316687-166477 40 CL-3 1963