Loading...
HomeMy WebLinkAboutP_Design_105087529_V1_18030117106 PARCEL # 2892700060 17030 17105 #2ACSR#2ACSR17001 17007 17013 17021 17105 17113 17119 17127 17135 17143 17151 17159 11402 11406 11403 11408 1140111407 16922 17004 17014 17022 17030 17114 17122 16925 17009 17015 17023 17105 17107 17109 17123 16927 11307 1131716915 16917 SE 170TH ST SE 170TH ST 113TH AVE SE113TH AVE SES E 171ST PL SE 171ST ST 114TH AVE SE114TH AVE SE114TH AVE SE114TH AVE SE113TH AVE SE60' 316687-166477 25 kVA 120/240V (C) 17107 ROL 15 114TH AVE SE118TH LN SE110TH LN SEtexttextt exttext text text t exttext 116TH AVE SE120TH LN SE120TH TER SE1 1 9TH PL SESE 170TH ST SE 173RD ST SE 173R D S T 108TH WAY SES E 1 7 0 T H P L 120TH AVE SESE 169TH P L 113TH AVE SE117TH AVE SE- CUSTOMER TO INSTALL 1-3" SCH'L 80 CONDUIT, ±125' - PSE TO INSTALL 1-RUN 4/O UG TPX, ±165' CUSTOMER SUPPLIED 4' X 4' WORK PIT CUSTOMER SUPPLIED CUSTOMER SUPPLIED 4' X 4' WORK PIT CUSTOMER SUPPLIED 3/4" CUBIC YARD OF SAND 1 CUBIC YARD 5/8" CRUSHED ROCK SITE PLAN POWER GENERAL NOTES - RESIDENTIAL PROJECT N Vicinity Map N/A Owner / Developer Contact Info officeATTN: JACK ZHENG 4957 LAKEMONT BLVD SE C4-323 BELLEVUE, WA 98006 JACK ZHENG 425.442.9628 OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE SCALE: NONE NEW CABLE & CONDUIT DIAGRAM ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. HP Svc/MSA Distribution Job Order Temporary OH Maintenance Removal Perm. Service Superior ORDER#NOTIF# PWR PROJECT PHASE N/AN/A N/A N/AN/A N/AN/A 593192115N/A 108104522N/A 101109871N/A CABLE TV PHONE GAS FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. 10. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Inclement weather conditions may cause delays in construction times and dates. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 3000 200A GAS 10KW 65A 2.3% 2.4% 8. 9. PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" X X X X SCALE: 1" = 50'105087529THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) Service Stubs 105087529 N/A N/A UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP D. HONEYSETT 253.245.0883 . D. HONEYSETT 253.245.0883 . N/A N/A N/A E. ORTIZ 714.893.2405 1/18/2018 N/A RENTON ZHENG RESIDENCE TRF UPGRADE & OH TO UG SVC 17106 113TH AVE SE, RENTON, WA 98055 N/A N/A N/A 105087529 AS NOTED 1 OF 1 KING N/A N/A CSPSKEIN 29SE-T23R-05E N/A N/A 2305E116 2305E136 2305E116 ROL-15 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 505307941 N/A CIRCUIT FEET ADDED: 0' Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: P01 316687-166477 25kVA 6211250 CUSTOMER & DEVELOPER NOTES THE CUSTOMER IS RESPONSIBLE TO PROVIDE ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS 6750.6500 5(48,5('723529,'( ,167$//´',6&217,182866&+('8/(39&&21'8,7)520P01-M01 +/- 125' 5(48,5('723529,'( ,167$//´12132/<38//523(,1$//&21'8,76 -REQUIRED TO PROVIDE 4' X 4' WORK PIT & 1 CUBIC YARD 5/8" CRUSHED ROCK AT P01 5(48,5('723529,'(¶;¶:25.3,7 &8%,&<$5'2)6$1'$7M01 -REQUIRED TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL -REQUIRED TO PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS & TRENCH AT ALL TIMES -REQUIRED TO EXCAVATE & EXPOSE EXISTING PSE UG FACILITIES 48 HOURS PRIOR TO CONSTRUCTION -PSE INSPECTION IS REQUIRED PRIOR TO FINAL BACKFILL -PSE WILL NOT ENERGIZE FACILITIES UNTIL BACKFILL IS COMPLETE -RENTON CITY INSPECTION & APPROVAL IS REQUIRED 5 BUSINESS DAYS PRIOR TO CONNECTION CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE ROL-15 6/8/2017 305.00 310.00 329.00 1.46 0.00 0.00 306.46 310.00 329.00 SITE SPECIFIC NOTES AT P01: 316687-166477 -REMOVE EXISTING 40' CL 3 POLE (1963) -INSTALL NEW 45' CL 2 POLE (2018) ,167$//N9‘35,1(87$&65 7$3 3(567' -INSTALL 25kVA 120/240v (FUSE @ 10T) (TRFRXF) PER STD 6025.1000 ,167$//$/80,18067,5583&/$03 7$3&‘ 2254100) -INSTALL 3" SEC RISER (RIS3CSS) PER STD 6042.1000 -TRANSFER EXISTING OH SVC'S "17030", "17105" & "17107" -TRANSFER EXISTING STREET LIGHT (SLAG4403) M01 AT "17106EW PERMANENT METER -PSE METER DEPARTMENT TO SET CL200A METER M02 AT "17106" REMOTE TEMP METER -PSE METER DEPARTMENT TO REMOVE TEMP METER SPAN SPECIFIC NOTES P02 TO M01 "17106": &86720(572,167$//',6&217,18286*5(<6&+ /&21'8,7“ ,167$//58128*73;“¶ P01 TO M02 "17106" (TEMP METER): -REMOVE EXISTING OH SVC CONDUCTOR OUTAGE LIST -17030, 113TH AVE SE, RENTON, WA 98055 - PACIFIC BRIDGE VENTURES LLC -17105, 113TH AVE SE, RENTON, WA 98055 - SALAYMANG HALIMAH -17107, 113TH AVE SE, RENTON, WA 98055 - CARTER STANLEY JOB SITE JOB SITE E-Mail: Cell Phone: Project Manager Contact Information: Manager:DAVE HONEYSETT 253-245-0883 DAVE.HONEYSETT@PSE.COM TV & TEL Electric Service Cable in Conduit 3" Schedule 80 Grey PVC Excavated Dirt Pile Final Grade 24" Min 24" Min to 36" Max Cover Backfill for Conduit Free of rocks larger than 8" in diameter Separation 6" Min in Conduit Schedule 40 White PVC Gas Service Line 32" Typical (Power, Gas, Phone & Cable) Separation 4" Min 12" Min Separation 36" MINIMUM COVER IN RIGHT OF WAY JOINT TRENCH DETAIL Joint Service Line in Conduit (NTS) To Excavated Dirt Pile Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter. kWh Mtr Elec. Mtr Base 12" Min 36" Typical 24" to 36" Max Conduit Depth Power Cable Conduit Customer Provided 3" Schedule 40 Grey PVC Regulator Vent Utility-Provided Gas Meter Assembly Min 36" Customer Provided Conduit Stakes 48" 48" Top View 4' 2 1/2" Conduit Service Riser from Gas Service Lines 12" Minimum Clearance Customer Provided Drainage Pipe Work Pit Dimensions Electric & joint Utility 4' MTR BASE DETAIL SCALE: NONE @ M01 POLE TABLE (NEW) Site # Pole Data Grid #Height Class Year Remarks / Location Ref. P01 316687-166477 45 CL-2 POLE RETIREMENT TABLE TEMP TRANSFERS ST. LIGHT TRANSFERS SITE # POLE DATA POLE TEL TV FIBER TRAN RMVD ID NUMBER GRID #HEIGHT CLASS YEAR TOPPED RMVD 316687-166477 40 CL-3 1963