Loading...
HomeMy WebLinkAboutP_Design_105087524_V1_180306319434-166418 37.5 kVA 120/240V (B) 319465-166418 25 kVA 120/240V (B) SLAH4848 3623 J 3601 3636 3705 3616 3711 3717 1825 PRIVATE ROAD LINCOLN AVE NEUG WATER RETENTION HAZ 15 #6CUB#4CUBROW 60'D/W D/W D/W 3613 3617 3621 A E JOB SITE JOB SITE ±75' ±40' ±135' ±100' -CUSTOMER TO PROVIDE TRENCH, ±120' -PSE TO PROVIDE & INSTALL 1-3" SCH'L 80 CONDUIT, ±120' -CUSTOMER TO PROVIDE TRENCH, ±40' -PSE TO PROVIDE & INSTALL 1-2" DB120 CONDUIT, ±40' -CUSTOMER TO PROVIDE TRENCH, ±235' -PSE TO PROVIDE & INSTALL 1-3" DB120 CONDUIT, ±235' -CUSTOMER TO PROVIDE 4'X4' WORK PIT & 1 YARD OF 5/8" CRUSHED ROCK -CUSTOMER TO PROVIDE 4'X4' 2X45° 30" RAD 90° 48" RAD A 3621 3617 3613 CONDUIT LEGEND 2" CONDUIT 3" CONDUIT ±45' ±160' ±50' ±145' -INSTALL 1-RUN 350KCMIL UG TPX, ±160' -INSTALL 1-RUN 4/0 UG TPX, ±50' -INSTALL 1-RUN 350 KCMIL UG TPX, ±250' 3621 3617 3613 ±105' ±40' 3617 ±55' 3621 E SITE PLAN N Vicinity Map Owner / Developer Contact Info officeATTN: LEVEL HOLDINGS LLC 18211 240TH AVE SE MAPLE VALLEY, WA 98038 JOE PRUSS 206-930-7000 ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.105087524FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. GAS PHONE CABLE TV 505390811 104299871 505402432 104300035 505402433 104300036 PROJECT PHASE PWR NOTIF#ORDER# Superior 3613 Perm. Service Phone INTOLIGHT Contact Information: N/A N/A 10. 9. 8. 7. 6. 5. 4. 3. 2. 1.THE CUSTOMER IS RESPONSIBLE FOR PROVIDING ALL TRENCHING, PER THE TRENCH PROFILE, AND ALL EXCAVATIONS AT THE TRANSFORMER/HANDHOLE VAULT SITES SUCH THAT PSE FACILITIES WILL MATCH FINAL GRADE. VAULT HOLES WILL HAVE STABLE LEVEL BOTTOMS. CUSTOMER WILL PROVIDE 6" OF CRUSHED ROCK FOR VAULT BEDDING. ALL TRENCHES WILL HAVE 6" OF WASHED SAND COVER AND 4" BEDDING FOR ALL CONDUITS. THE CUSTOMER WILL PROVIDE SELECT BACKFILL, IF REQUIRED, AND COMPACTION AS NECESSARY. THE CUSTOMER IS RESPONSIBLE FOR DISPOSAL OF ALL NATIVE SPOILS NOT SUITABLE FOR USE AS BACKFILL. ALL TRENCHES MAY BE JOINT WITH GAS, TELEPHONE AND TV CABLE. ALL CABLES/CONDUITS TO BE INSTALLED IN CUSTOMER'S TRENCH AT THE DEPTH INDICATED IN TRENCH DETAIL (DEPENDENT UPON SIZE OF CONDUIT BEING INSTALLED TO MEET MIN 36" OF COVER). INSTALL CABLE ID TAGS AT EACH END OF THE PRIMARY CABLES PER THE CIRCUIT ONE-LINE DIAGRAM. UNLESS OTHERWISE SPECIFIED BY MUNICIPALITIES, INSTALL PVC (DB-120) ROAD CROSSINGS AS INDICATED ON THE CROSSINGS CONDUIT TABLE & AS SHOWN ON WORK SKETCH. CROSSINGS SHALL BE INSTALLED BY CUSTOMER/DEVELOPER PER PUGET SOUND ENERGY STANDARDS. AT SYMBOL: INSTALL UNDERGROUND PRIMARY CABLES IN CONDUIT. CABLE LENGTH AND CONDUIT SIZE AS INDICATED ON PRIMARY CABLE & CONDUIT TABLE. AT SYMBOL: INSTALL 600 VOLT UG SECONDARY CABLES IN CONDUIT. CABLE/CONDUIT SIZE AND LENGTH AS INDICATED ON SECONDARY CABLE & CONDUIT TABLE. AT SYMBOL: INSTALL MINI-PAD HANDHOLE & PADMOUNT TRANSFORMER. ADDITIONAL EQUIPMENT AS INDICATED ON VAULT TABLE. AT SYMBOL: INSTALL SECONDARY PEDESTAL/HANDHOLE W/ (3) MULTI-CONNECTORS. SIZE AS INDICATED ON SECONDARY HH/PEDESTAL TABLE. (EXCAVATION: 3' SQ.) AT SYMBOL: INSTALL JUNCTION BOX HANDHOLE. ADDITIONAL EQUIPMENT AS INDICATED ON VAULT TABLE. AT SYMBOL: INSTALL SECONDARY CABLE & CONDUIT STUB-OUT. AT SYMBOL: INSTALL STREET LIGHTING STANDARD. SIZE AND TYPE OF STANDARD/LUMINARIE AS INDICATED ON STREET LIGHTING TABLE. (CUSTOMER TO EXCAVATE & INSTALL CORRUGATED STREET LIGHT TUBES FOR PLACEMENT OF THE STREET LIGHT STANDARDS. ) INCLEMENT WEATHER CONDITIONS MAY CAUSE DELAYS IN CONSTRUCTION TIMES AND DATES. POWER GENERAL NOTES - PLAT PROJECT 11. E-Mail: Cell Phone: Project Manager Contact Information: Manager:RUSSELL PAGE 253-245-0192 RUSSELL.PAGE@PSE.COM PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" SCALE: 1" = 50' THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP RUSSELL PAGE 253-245-0192 2/15/18 RUSSELL PAGE 253-245-0192 2/15/18 N/A N/A N/A TIN NGUYEN 253-244-4303 2/15/18 REQUIRED RENTON CARPENTER SHORT PLAT UG SVC W/ NEW HH 3613 LINCOLN AVE NE, RENTON WA 98056 N/A N/A N/A 105087524 AS NOTED 1/1 KING N/A N/A CSPSKEIN NE 32-24N-05E N/A N/A 2405E125 2405E136 2405E125 HAZ-15 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 105087524502639069 SITE SPECIFIC NOTES P01 GRID# 319434-166418: -EXISTING DISTRIBUTION POLE TO REMAIN -EXISTING 37.5KVA OH TRF TO REMAIN -INSTALL 1-3" CONDUIT RISER TO EXISTING S/O BRKT PER STD 6042.1000 (RIS3CSS) HH1: -INSTALL 1-SINGLE PHASE SECONDARY HANDHOLE PER STD 6050.2000 (HH16350) -INSTALL 3-6 POSITION FARGO BARS (MID: 7651006) SECONDARY CABLE & CONDUIT TABLE LOCATION CABLE Assumed Lot Corner CONDUIT VOLTAGE DROP VOLTAGE FLICKER ASBUILT INFORMATION SIZE LENGTH Design (ft) SIZE LENGTH Design (ft) BENDS Foreman - Complete FROM TO (1/0,4/0,350)to Meter(ft)(in)90°45°22°11°(Percent)(Percent)Actual Amount Installed (Conduit & Cable) P01 HH1 350 KCMIL 160 3" SCH'L 80 120 2 2.6%2.5% HH1 3613 4/0 UG TPX 10 2" DB120 5 2.6%2.6% HH1 3617 4/0 UG TPX 50 2" DB120 40 2.7%2.9% HH1 3621 350 KCMIL 250 3" DB120 235 1 2.4%3.6% OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE CONDUIT ONE-LINE DIAGRAM SCALE: NONE CABLE ONE-LINE DIAGRAM SCALE: NONE LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 2900 SQ. 200 AMPS GAS 6 KW 115 A 2.6% 2.6% UTILITY POLE EROSION CONTROL DETAIL TOP VIEW DRY DRAINAGE DITCH or DRY VEGETATED SITE SLOPE Place gravel bags for Sediment Trap Place straw mulch on disturbed areaExcavated or Augered Hole Pole SLOPE Not to scale Drainage ditches or Dry vegetated sites FLOW DIRECTION LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS (MID 9995692). 6' 3' 8" TECHNIQUES FOR EROSION AND SEDIMENT CONTROL FILTER FENCE DETAIL Not to Scale 0150.3200 TV & TEL Electric Service Cable in Conduit 3" Schedule 80 Grey PVC Excavated Dirt Pile Final Grade 24" Min 24" Min to 36" Max Cover Backfill for Conduit Free of rocks larger than 8" in diameter Separation 12" Min in Conduit Schedule 40 Yellow PVC Gas Service Line 32" Typical (Power, Gas, Phone & Cable) Separation 12" Min 36" MINIMUM COVER IN RIGHT OF WAY JOINT TRENCH DETAIL Joint Service Line in Conduit (NTS) To Excavated Dirt Pile Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter. CONDUIT RISER PLACEMENT DETAIL TOP VIEW Not to Scale Standoff Bracket 15" Min Length Conduit Clamp Conduit Field Face Quadrant Climbing Space Road Face Quadrant Climbing Space 5" Min CL LCDirection of Vehicular Traffic CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE HAZ-15 2017 201 261 240 -2.63 - 201 263.63 240 3617 Perm. Service 3621 Perm. Service CIRCUIT FEET ADDED: 0' "3613" LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 2900 SQ. 200 AMPS GAS 6 KW 115 A 2.7% 2.9% "3617" LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 2900 SQ. 200 AMPS GAS 6 KW 115 A 2.4% 3.6% "3621" Customer's service conductors Captive L-Bolt 27-1/4" 2" 18" Captive L-Bolt Lock Cover, 10 lbs 40-1/2" Conductors enter from beneath and shall be folded back with handhole SIDE VIEW Lock Cover 30" Approx Approx 17" Set handhole flush to final grade SINGLE PHASE SECONDARY HANDHOLE Not to scale 6050.2000 DEDICATED FACILITY (HH1-3617, E-3621) CABLE & CONDUIT SCALE: NONE SCHDULE 27