Loading...
HomeMy WebLinkAboutMFP18001352DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP18001352 IVR Number: 18001352 Permit Informaon Permit Name:Puget Sound Energy - Electric Address/Locaon :03/16/2018Application Date:1463400060Parcel Number:13833 156TH AVE SE Permit Type:05/17/2018Issue Date:Franchise Permit Work Class:05/17/2019Expiration Date:Minor Utility Job Number:105085461Franchise Type:Electric Description:Install single phase primary underground line extension to 14 SFR lots connecting to existing P01 and trenching 18' to customer property. Restoration per City of Renton standards. Contacts Name Address PhoneTypeBilling ANISH KUMAR PUGET SOUND ENERGY - ELECTRIC 6905 S 228th St Kent, WA 98032 B: (253) 208-2183Applicant Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: BL.005109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner ANISH KUMAR PUGET SOUND ENERGY - ELECTRIC 6905 S 228th St Kent, WA 98032 B: (253) 208-2183Specialized Billing X General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 | Published: 3/30/2017 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 3/30/2017 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street ☐ Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Puget Sound Energy - Electric 105085461 Anish Kumar 253-208-2183 anish.kumar@pse.com 13833 156th Ave SE 98059 105085461 Meadow Vue Occupying S bound lane of 156th Ave SE for crew to install single phase primary underground line extension to 14 S/F lots connecting to existing P01 and trenching 18' West to customer's property. 18'x4'x4' trench anticipated. Restoration per City of Renton standards. 18'x4'x4' Potelco Inc.253-208-2183 BL005109 Poteli*227PL 3/13/2018 MFP18001352 Scott Warlick 5/3/2018 Justin Johnson 5-16-2018 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: • Comply with all traffic regulations of the City of Renton and the State of Washington. • Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. • Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. • Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. • Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. • The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. • In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. • Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. • By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: Reset FormPrint Form 105085461 Meadow Vue PSE/Potelco Inc. Lee Brown 425-417-8620 6905 S 228th St, Kent, WA 98032 lee.brown@pse.com 13833 156th Ave SE TBD 3/13/2018 Anish Kumar 3/13/2018 MFP18001352 Justin Johnson 5-16-2018 8:00 am to 3:00 pm Monday through Friday SKETCH I -- NORTH -- I NOTES: • Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. • The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. • Approved Temporary Traffic Control Plan must be at the work site during work hours. • Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. • Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. • Total road closure lasting more than 24 hours is subject to the approval by the City Council. • Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: • Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. • Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. • The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. • Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). 1111 1111 1111FROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARK NO PARK SIGNAGE WILL BE PLACED ON ALL STREETS TO SURROUND WORK ZONE SE 139TH PL/SE 5TH PL SE 4TH PL1111 156TH AVESE156TH AVE SE#13833 STOP FLAGGER STOP FLAGGER BEPREPAREDTOSTOPW3-4X'X'X'ROADWORKAHEADW20-1W20-7AONE LANE ROAD AHEAD W20-4X'X'X'ROAD WORK AHEAD W20-1W20-7AONE LANEROADAHEADW20-4X'X'X'ROADWORKAHEADW20-1W20-7ABEPREPAREDTOSTOPW3-4X'X'X'ROADWORKAHEADW20-1W20-7ARESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE X'X'PLACE W20-1 SIGNS ON ALL ADJACENT STREETS WITHIN FEET OF WORK AREA ROAD WORK AHEAD W20-1ROADWORKAHEADW20-11000 ROAD A(PROPOSED) AREA UNDER CONSTRUCTION STOP FLAGGER PATH OF INSTALLATION P01 CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 N PSE PUGET SOUND ENERGY JOB#105085461 13833 156th Ave SE, Renton WA March 7, 2018 ryan.honeysett@pse.com425-457-5381 SHEET 1 OF 1 TRENCH 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' Puget Sound Energy Traffic Control Supervisor: Ryan Honeysett Card No. 010760 Card Exp. 06/30/2021 ryan.honeysett@pse.com (425)457-5381 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. PRINT ON 11 X 17 SHEETS ONLY MFP18001352 10117689SE 138TH PL.SE 139TH PL.156TH AVE. SEW'13908'13922'6505''13833'DEMOOH SRVC. TO BEREMOVED BY OTHERSREMOVE +/-80'INSTALL +/-100'SLACK-SPAN36'43'30'30'(A.K.A. SE 139TH PL.)DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTElect OrderSCALEPAGEENGR - POWERFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPTHIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL (800) 424-55552 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)SITE PLANSCALE:1"=50'CIRCUIT FT. ADDED: 20'CIRCUIT FT. REMOVED: 0'L. Brown(425) 417-862010/2/17L. Brown(425) 417-862010/2/17J. Yang(206) 503-070610/2/17N/ACity of RentonMeadowVuePole Relocate / Pole Removal13833 156th Ave. SE - Renton, WA 98059PSE PLATS DEPT.N/A1011060301" = 50'1 of 1KINGN/AN/AQCSPLATSW14 - T23 - R05EN/AN/A2305E055/ 0562306E0762305E055/ 056MAP-13ComcastJim Brooke(253) 261-2895Century-LinkDena Overaa(206) 733-5262MCIPSE Project ManagerLee J. Brown(425) 417-8620POWER GENERAL NOTES - RELOCATION PROJECT11.7.6.5.4.3.2.1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation fromthis work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.All switching arrangements and/or outage arrangements are to be made with the Project Manager at leastthree (3) working days in advance.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencingwork to get the underground facilities located.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or constructionmaterials which would restrict construction and/or equipment access, before work can begin.Roads shall be paved or have a compacted , crushed rock base in place.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet fromcombustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guardposts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.All work is to be done in accordance with local municipal and county permit requirements as applicable.Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduitsand crossings from the individual unit's meter base to the designated connection point.Inclement weather conditions may cause delays in construction times and dates.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction andrestoration per this sketch and per PSE standards. A minimum protective cover of 36" is required overPSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customerwill provide any and all shoring or they will side slope the trench to 1:1.8.9.10.ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSIONSTRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)EROSION & SEDIMENT CONTROL REQUIREMENTSNOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROLEROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.Construction Notes: P01 - (317714-167897) PSE Dist. Secondary Pole Remove Exist. PSE Equipment and Top to Communications P02 - (317717-167906) New PSE Dist. Feeder Pole (Ang:<1°) Install 50ft. CL-2 Pole w/grounds as staked (PD502) - 6010.1000 Install 11ft. 8P Single Feeder Wing-Arm (TASW313) - 6033.4012 Replace Exist. 10kVA OH Transformer w/ New 15kVA (TRFLXF) - 6025.1000 -Fuse at 6T & Tap BØ Transfer Exist. Feeder & Neutral Conductors Transfer Exist. St.Light Secondary Conductor from P2A Transfer Exist. OH Service to address '13908' from P2A P2A - (317715-167904) Exist. PSE Dist. Feeder Pole Remove Exist. PSE Equipment and Top to Communications P03 - (317702-167906) New PSE Dist. Feeder Pole (Ang:<1°) Install 50ft. CL-2 Pole w/grounds as staked (PD502) - 6010.1000 Install 11ft. 8P Single Feeder Wing-Arm (TASW313) - 6033.4012 Install 1Ø Arm-Mounted Tap as Slack-Span, Bolted DE (FR13RDE) - 6031.5060 -Fuse at 40T (3412500) & Tap CØ -Install SW#:X-79318 Transfer Exist. Feeder & Neutral Conductors Transfer Exist. St.Light Secondary Conductor from P3A Transfer Exist. St.Light from P3A P3A - (317706-167904) Exist. PSE Dist. Feeder Pole Remove Exist. PSE Equipment and Top to Communications P04 - (317705-167915) New PSE Dist. Double-DE Pole Install 45ft. CL-3 Pole w/grounds as staked (PD453) - 6010.1000 Install 1Ø Dead-End East under Full Tension, Auto-DE (DE2115) - 6031.1040 Install 1Ø Dead-End West as Slack-Span, Bolted DE (SSDD112) - 6031.5010 Install 10" Single-Helix Anchor West, Lead = 8ft. (ANDH1) - 6012.1000 Install 3/8" Primary & Neutral Down-Guys (GYD3SA / GYD3SAN) - 6013.0100 Transfer Exist. #2ACSR Primary & Neutral Conductors RETIREMENT POLE TABLE TEMP TRANSFERSREMARKSSITE#POLE DATAPOLETELFIBERFIBERST. LIGHTGRID #HEIGHTCL.YR.TOPPEDRMVDP01317714-16789740'21969Comcast-Auburn / Century-LinkP2A317715-16790440'11960Comcast-Auburn / Century-Link / MCIP3A317706-16790440'11966Comcast-Auburn / Century-Link / MCIInstalled at site: P02Grid Number: 317717-167906kVA Rating: 15kVAForeman to redline the followinginformationTRANSFORMER INSTALLATIONCompany ID#: Primary phase connected to: BØTested Secondary Voltage 120 240Installed at site: P2AGrid Number: 317715-167904kVA Rating: 10kVAForeman to redline the followinginformationTRANSFORMER REMOVALCompany ID#: Primary phase connected to: BØTested Secondary Voltage 120 240PLACE PEA GRAVELBAGS (MID 9995892)FOR SEDIMENT TRAPPLACE STRAW MULCH ONDISTURBED AREAAUGERED HOLEPOLETYPICAL AUGERED WORK SITE - 0150.3200TECHNIQUES FOR EROSION AND SEDIMENT CONTROLDITCH OR SENSITIVE AREAPOLE TABLE (NEW)Site#Pole DataGrid #HeightClassYearRemarks / Location Ref.P02317717-16790650'CL-22018Install in New PlanterP03317702-16790650'CL-22018Install in New PlanterP04317705-16791545'CL-32018Install in Existing Drainage DitchNVicinity MapPSENoNoNoYesYesYesNoYesDeveloper"Flagging Required""Outages Required""Locates Required"XXXXFOREMAN (CHECK BOX WHEN COMPLETED)PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.Grid, Cable, and Switch numbers INSTALLED & VERIFIED.Field Changes RED-LINED on As-built.Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.Foreman's Signature _______________________________________________Print Name ___________________________________ Date ______________Material VERIFIED and CHANGES noted on Paperwork.Total PRIMARY Cable noted on As-built.Company ID#'s RECORDED in correct location on As-built.Deviations noted on the As-built and their reason.I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met.504727675101106030593188719PROJECT PHASEPWRNOTIF#ORDER#SuperiorRetirementOH Wire ExpenseMisc.E-Mail:Cell Phone:Project Manager Contact Information:Manager:101106030Lee J. Brown(425) 417-8620lee.brown@pse.comOwner / Developer Contact InfoofficeATTN:SSHI, LLC (dba D.R. Horton)12910 Totem Lake Blvd. NE Suite:220Kirkland, WA 98034Patrick Danner(425) 821-3400 ext.5118e-mailpdanner@drhorton.com108101434UG Wire Expense583057890OH Tfmr. ExpenseFOREMAN #3JobSiteJobSiteJobSiteOVERHEAD CIRCUIT MAP - 2306E076SCALE:1"= 6 MILESUNDERGROUND CIRCUIT MAP - 2305E055 / 056SCALE:1"= 100'Wire Install / Removal TableSpanP3A to P04WorkPerformedRemoveP03 to P04Install#2ACSR 1-Ph.80'As-Builts / Remarks(Pri. & Neut.)100'MFP18001352