HomeMy WebLinkAboutMFP18001352DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP18001352
IVR Number: 18001352
Permit Informaon
Permit Name:Puget Sound Energy - Electric
Address/Locaon :03/16/2018Application Date:1463400060Parcel Number:13833 156TH AVE SE
Permit Type:05/17/2018Issue Date:Franchise
Permit Work Class:05/17/2019Expiration Date:Minor Utility
Job Number:105085461Franchise Type:Electric
Description:Install single phase primary underground line extension to 14 SFR lots connecting to existing P01 and trenching 18' to
customer property. Restoration per City of Renton standards.
Contacts
Name Address PhoneTypeBilling
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Applicant
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: BL.005109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Puget Sound Energy - Electric
105085461
Anish Kumar
253-208-2183
anish.kumar@pse.com
13833 156th Ave SE 98059 105085461 Meadow Vue
Occupying S bound lane of 156th Ave SE for crew to install single phase primary
underground line extension to 14 S/F lots connecting to existing P01 and trenching 18' West to
customer's property. 18'x4'x4' trench anticipated. Restoration per City of Renton standards.
18'x4'x4'
Potelco Inc.253-208-2183
BL005109 Poteli*227PL
3/13/2018
MFP18001352
Scott Warlick 5/3/2018
Justin Johnson 5-16-2018
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
Reset FormPrint Form
105085461 Meadow Vue
PSE/Potelco Inc.
Lee Brown 425-417-8620
6905 S 228th St, Kent, WA 98032
lee.brown@pse.com
13833 156th Ave SE
TBD
3/13/2018
Anish Kumar 3/13/2018
MFP18001352
Justin Johnson
5-16-2018
8:00 am to 3:00 pm
Monday through Friday
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
1111
1111
1111FROM TO
TOW AWAY AREA
PHONE 888-9999
INFRASOURCE LLC 000 0000000
NO PARKING
NO-PARK
NO PARK SIGNAGE WILL BE
PLACED ON ALL STREETS TO
SURROUND WORK ZONE
SE 139TH PL/SE 5TH PL
SE 4TH PL1111
156TH AVESE156TH AVE SE#13833
STOP
FLAGGER
STOP
FLAGGER
BEPREPAREDTOSTOPW3-4X'X'X'ROADWORKAHEADW20-1W20-7AONE LANE
ROAD
AHEAD W20-4X'X'X'ROAD
WORK
AHEAD W20-1W20-7AONE LANEROADAHEADW20-4X'X'X'ROADWORKAHEADW20-1W20-7ABEPREPAREDTOSTOPW3-4X'X'X'ROADWORKAHEADW20-1W20-7ARESIDENT(S) WILL BE INFORMED
OF POSSIBLE TEMPORARY
DRIVEWAY CLOSURE
X'X'PLACE W20-1 SIGNS ON ALL
ADJACENT STREETS WITHIN
FEET OF WORK AREA
ROAD
WORK
AHEAD W20-1ROADWORKAHEADW20-11000
ROAD A(PROPOSED)
AREA UNDER CONSTRUCTION
STOP
FLAGGER
PATH OF INSTALLATION
P01
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
N
PSE PUGET
SOUND
ENERGY
JOB#105085461
13833 156th Ave SE, Renton WA
March 7, 2018
ryan.honeysett@pse.com425-457-5381
SHEET 1 OF 1
TRENCH
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
SIGN LOCATION
FLAGGER
STOP
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
Puget Sound Energy
Traffic Control Supervisor:
Ryan Honeysett
Card No. 010760
Card Exp. 06/30/2021
ryan.honeysett@pse.com
(425)457-5381
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise
indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
PRINT ON 11 X 17
SHEETS ONLY MFP18001352
10117689SE 138TH PL.SE 139TH PL.156TH AVE. SEW'13908'13922'6505''13833'DEMOOH SRVC. TO BEREMOVED BY OTHERSREMOVE +/-80'INSTALL +/-100'SLACK-SPAN36'43'30'30'(A.K.A. SE 139TH PL.)DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTElect OrderSCALEPAGEENGR - POWERFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPTHIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL (800) 424-55552 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)SITE PLANSCALE:1"=50'CIRCUIT FT. ADDED: 20'CIRCUIT FT. REMOVED: 0'L. Brown(425) 417-862010/2/17L. Brown(425) 417-862010/2/17J. Yang(206) 503-070610/2/17N/ACity of RentonMeadowVuePole Relocate / Pole Removal13833 156th Ave. SE - Renton, WA 98059PSE PLATS DEPT.N/A1011060301" = 50'1 of 1KINGN/AN/AQCSPLATSW14 - T23 - R05EN/AN/A2305E055/ 0562306E0762305E055/ 056MAP-13ComcastJim Brooke(253) 261-2895Century-LinkDena Overaa(206) 733-5262MCIPSE Project ManagerLee J. Brown(425) 417-8620POWER GENERAL NOTES - RELOCATION PROJECT11.7.6.5.4.3.2.1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation fromthis work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.All switching arrangements and/or outage arrangements are to be made with the Project Manager at leastthree (3) working days in advance.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencingwork to get the underground facilities located.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or constructionmaterials which would restrict construction and/or equipment access, before work can begin.Roads shall be paved or have a compacted , crushed rock base in place.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet fromcombustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guardposts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.All work is to be done in accordance with local municipal and county permit requirements as applicable.Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduitsand crossings from the individual unit's meter base to the designated connection point.Inclement weather conditions may cause delays in construction times and dates.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction andrestoration per this sketch and per PSE standards. A minimum protective cover of 36" is required overPSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customerwill provide any and all shoring or they will side slope the trench to 1:1.8.9.10.ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSIONSTRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)EROSION & SEDIMENT CONTROL REQUIREMENTSNOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROLEROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.Construction Notes: P01 - (317714-167897) PSE Dist. Secondary Pole Remove Exist. PSE Equipment and Top to Communications P02 - (317717-167906) New PSE Dist. Feeder Pole (Ang:<1°) Install 50ft. CL-2 Pole w/grounds as staked (PD502) - 6010.1000 Install 11ft. 8P Single Feeder Wing-Arm (TASW313) - 6033.4012 Replace Exist. 10kVA OH Transformer w/ New 15kVA (TRFLXF) - 6025.1000 -Fuse at 6T & Tap BØ Transfer Exist. Feeder & Neutral Conductors Transfer Exist. St.Light Secondary Conductor from P2A Transfer Exist. OH Service to address '13908' from P2A P2A - (317715-167904) Exist. PSE Dist. Feeder Pole Remove Exist. PSE Equipment and Top to Communications P03 - (317702-167906) New PSE Dist. Feeder Pole (Ang:<1°) Install 50ft. CL-2 Pole w/grounds as staked (PD502) - 6010.1000 Install 11ft. 8P Single Feeder Wing-Arm (TASW313) - 6033.4012 Install 1Ø Arm-Mounted Tap as Slack-Span, Bolted DE (FR13RDE) - 6031.5060 -Fuse at 40T (3412500) & Tap CØ -Install SW#:X-79318 Transfer Exist. Feeder & Neutral Conductors Transfer Exist. St.Light Secondary Conductor from P3A Transfer Exist. St.Light from P3A P3A - (317706-167904) Exist. PSE Dist. Feeder Pole Remove Exist. PSE Equipment and Top to Communications P04 - (317705-167915) New PSE Dist. Double-DE Pole Install 45ft. CL-3 Pole w/grounds as staked (PD453) - 6010.1000 Install 1Ø Dead-End East under Full Tension, Auto-DE (DE2115) - 6031.1040 Install 1Ø Dead-End West as Slack-Span, Bolted DE (SSDD112) - 6031.5010 Install 10" Single-Helix Anchor West, Lead = 8ft. (ANDH1) - 6012.1000 Install 3/8" Primary & Neutral Down-Guys (GYD3SA / GYD3SAN) - 6013.0100 Transfer Exist. #2ACSR Primary & Neutral Conductors RETIREMENT POLE TABLE TEMP TRANSFERSREMARKSSITE#POLE DATAPOLETELFIBERFIBERST. LIGHTGRID #HEIGHTCL.YR.TOPPEDRMVDP01317714-16789740'21969Comcast-Auburn / Century-LinkP2A317715-16790440'11960Comcast-Auburn / Century-Link / MCIP3A317706-16790440'11966Comcast-Auburn / Century-Link / MCIInstalled at site: P02Grid Number: 317717-167906kVA Rating: 15kVAForeman to redline the followinginformationTRANSFORMER INSTALLATIONCompany ID#: Primary phase connected to: BØTested Secondary Voltage 120 240Installed at site: P2AGrid Number: 317715-167904kVA Rating: 10kVAForeman to redline the followinginformationTRANSFORMER REMOVALCompany ID#: Primary phase connected to: BØTested Secondary Voltage 120 240PLACE PEA GRAVELBAGS (MID 9995892)FOR SEDIMENT TRAPPLACE STRAW MULCH ONDISTURBED AREAAUGERED HOLEPOLETYPICAL AUGERED WORK SITE - 0150.3200TECHNIQUES FOR EROSION AND SEDIMENT CONTROLDITCH OR SENSITIVE AREAPOLE TABLE (NEW)Site#Pole DataGrid #HeightClassYearRemarks / Location Ref.P02317717-16790650'CL-22018Install in New PlanterP03317702-16790650'CL-22018Install in New PlanterP04317705-16791545'CL-32018Install in Existing Drainage DitchNVicinity MapPSENoNoNoYesYesYesNoYesDeveloper"Flagging Required""Outages Required""Locates Required"XXXXFOREMAN (CHECK BOX WHEN COMPLETED)PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.Grid, Cable, and Switch numbers INSTALLED & VERIFIED.Field Changes RED-LINED on As-built.Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.Foreman's Signature _______________________________________________Print Name ___________________________________ Date ______________Material VERIFIED and CHANGES noted on Paperwork.Total PRIMARY Cable noted on As-built.Company ID#'s RECORDED in correct location on As-built.Deviations noted on the As-built and their reason.I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met.504727675101106030593188719PROJECT PHASEPWRNOTIF#ORDER#SuperiorRetirementOH Wire ExpenseMisc.E-Mail:Cell Phone:Project Manager Contact Information:Manager:101106030Lee J. Brown(425) 417-8620lee.brown@pse.comOwner / Developer Contact InfoofficeATTN:SSHI, LLC (dba D.R. Horton)12910 Totem Lake Blvd. NE Suite:220Kirkland, WA 98034Patrick Danner(425) 821-3400 ext.5118e-mailpdanner@drhorton.com108101434UG Wire Expense583057890OH Tfmr. ExpenseFOREMAN #3JobSiteJobSiteJobSiteOVERHEAD CIRCUIT MAP - 2306E076SCALE:1"= 6 MILESUNDERGROUND CIRCUIT MAP - 2305E055 / 056SCALE:1"= 100'Wire Install / Removal TableSpanP3A to P04WorkPerformedRemoveP03 to P04Install#2ACSR 1-Ph.80'As-Builts / Remarks(Pri. & Neut.)100'MFP18001352