Loading...
HomeMy WebLinkAboutP_Design_101106030_V2_18050210117689SE 138TH PL.SE 139TH PL.156TH AVE. SEW'13908'13922'6505''13833'DEMOOH SRVC. TO BEREMOVED BY OTHERSREMOVE +/-80'INSTALL +/-100'SLACK-SPAN36'43'30'30'(A.K.A. SE 139TH PL.)DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTElect OrderSCALEPAGEENGR - POWERFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPTHIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL (800) 424-55552 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)SITE PLANSCALE:1"=50'CIRCUIT FT. ADDED: 20'CIRCUIT FT. REMOVED: 0'L. Brown(425) 417-862010/2/17L. Brown(425) 417-862010/2/17J. Yang(206) 503-070610/2/17N/ACity of RentonMeadowVuePole Relocate / Pole Removal13833 156th Ave. SE - Renton, WA 98059PSE PLATS DEPT.N/A1011060301" = 50'1 of 1KINGN/AN/AQCSPLATSW14 - T23 - R05EN/AN/A2305E055/ 0562306E0762305E055/ 056MAP-13ComcastJim Brooke(253) 261-2895Century-LinkDena Overaa(206) 733-5262MCIPSE Project ManagerLee J. Brown(425) 417-8620POWER GENERAL NOTES - RELOCATION PROJECT11.7.6.5.4.3.2.1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation fromthis work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.All switching arrangements and/or outage arrangements are to be made with the Project Manager at leastthree (3) working days in advance.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencingwork to get the underground facilities located.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or constructionmaterials which would restrict construction and/or equipment access, before work can begin.Roads shall be paved or have a compacted , crushed rock base in place.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet fromcombustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guardposts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.All work is to be done in accordance with local municipal and county permit requirements as applicable.Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduitsand crossings from the individual unit's meter base to the designated connection point.Inclement weather conditions may cause delays in construction times and dates.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction andrestoration per this sketch and per PSE standards. A minimum protective cover of 36" is required overPSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customerwill provide any and all shoring or they will side slope the trench to 1:1.8.9.10.ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSIONSTRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)EROSION & SEDIMENT CONTROL REQUIREMENTSNOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROLEROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.Construction Notes: P01 - (317714-167897) PSE Dist. Secondary Pole Remove Exist. PSE Equipment and Top to Communications P02 - (317717-167906) New PSE Dist. Feeder Pole (Ang:<1°) Install 50ft. CL-2 Pole w/grounds as staked (PD502) - 6010.1000 Install 11ft. 8P Single Feeder Wing-Arm (TASW313) - 6033.4012 Replace Exist. 10kVA OH Transformer w/ New 15kVA (TRFLXF) - 6025.1000 -Fuse at 6T & Tap BØ Transfer Exist. Feeder & Neutral Conductors Transfer Exist. St.Light Secondary Conductor from P2A Transfer Exist. OH Service to address '13908' from P2A P2A - (317715-167904) Exist. PSE Dist. Feeder Pole Remove Exist. PSE Equipment and Top to Communications P03 - (317702-167906) New PSE Dist. Feeder Pole (Ang:<1°) Install 50ft. CL-2 Pole w/grounds as staked (PD502) - 6010.1000 Install 11ft. 8P Single Feeder Wing-Arm (TASW313) - 6033.4012 Install 1Ø Arm-Mounted Tap as Slack-Span, Bolted DE (FR13RDE) - 6031.5060 -Fuse at 40T (3412500) & Tap CØ -Install SW#:X-79318 Transfer Exist. Feeder & Neutral Conductors Transfer Exist. St.Light Secondary Conductor from P3A Transfer Exist. St.Light from P3A P3A - (317706-167904) Exist. PSE Dist. Feeder Pole Remove Exist. PSE Equipment and Top to Communications P04 - (317705-167915) New PSE Dist. Double-DE Pole Install 45ft. CL-3 Pole w/grounds as staked (PD453) - 6010.1000 Install 1Ø Dead-End East under Full Tension, Auto-DE (DE2115) - 6031.1040 Install 1Ø Dead-End West as Slack-Span, Bolted DE (SSDD112) - 6031.5010 Install 10" Single-Helix Anchor West, Lead = 8ft. (ANDH1) - 6012.1000 Install 3/8" Primary & Neutral Down-Guys (GYD3SA / GYD3SAN) - 6013.0100 Transfer Exist. #2ACSR Primary & Neutral Conductors RETIREMENT POLE TABLE TEMP TRANSFERSREMARKSSITE#POLE DATAPOLETELFIBERFIBERST. LIGHTGRID #HEIGHTCL.YR.TOPPEDRMVDP01317714-16789740'21969Comcast-Auburn / Century-LinkP2A317715-16790440'11960Comcast-Auburn / Century-Link / MCIP3A317706-16790440'11966Comcast-Auburn / Century-Link / MCIInstalled at site: P02Grid Number: 317717-167906kVA Rating: 15kVAForeman to redline the followinginformationTRANSFORMER INSTALLATIONCompany ID#: Primary phase connected to: BØTested Secondary Voltage 120 240Installed at site: P2AGrid Number: 317715-167904kVA Rating: 10kVAForeman to redline the followinginformationTRANSFORMER REMOVALCompany ID#: Primary phase connected to: BØTested Secondary Voltage 120 240PLACE PEA GRAVELBAGS (MID 9995892)FOR SEDIMENT TRAPPLACE STRAW MULCH ONDISTURBED AREAAUGERED HOLEPOLETYPICAL AUGERED WORK SITE - 0150.3200TECHNIQUES FOR EROSION AND SEDIMENT CONTROLDITCH OR SENSITIVE AREAPOLE TABLE (NEW)Site#Pole DataGrid #HeightClassYearRemarks / Location Ref.P02317717-16790650'CL-22018Install in New PlanterP03317702-16790650'CL-22018Install in New PlanterP04317705-16791545'CL-32018Install in Existing Drainage DitchNVicinity MapPSENoNoNoYesYesYesNoYesDeveloper"Flagging Required""Outages Required""Locates Required"XXXXFOREMAN (CHECK BOX WHEN COMPLETED)PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.Grid, Cable, and Switch numbers INSTALLED & VERIFIED.Field Changes RED-LINED on As-built.Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.Foreman's Signature _______________________________________________Print Name ___________________________________ Date ______________Material VERIFIED and CHANGES noted on Paperwork.Total PRIMARY Cable noted on As-built.Company ID#'s RECORDED in correct location on As-built.Deviations noted on the As-built and their reason.I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met.504727675101106030593188719PROJECT PHASEPWRNOTIF#ORDER#SuperiorRetirementOH Wire ExpenseMisc.E-Mail:Cell Phone:Project Manager Contact Information:Manager:101106030Lee J. Brown(425) 417-8620lee.brown@pse.comOwner / Developer Contact InfoofficeATTN:SSHI, LLC (dba D.R. Horton)12910 Totem Lake Blvd. NE Suite:220Kirkland, WA 98034Patrick Danner(425) 821-3400 ext.5118e-mailpdanner@drhorton.com108101434UG Wire Expense583057890OH Tfmr. ExpenseFOREMAN #3JobSiteJobSiteJobSiteOVERHEAD CIRCUIT MAP - 2306E076SCALE:1"= 6 MILESUNDERGROUND CIRCUIT MAP - 2305E055 / 056SCALE:1"= 100'Wire Install / Removal TableSpanP3A to P04WorkPerformedRemoveP03 to P04Install#2ACSR 1-Ph.80'As-Builts / Remarks(Pri. & Neut.)100'