HomeMy WebLinkAboutP_Design_105085461_V2_180426LANE
LANE
2 543
STORM TRACT 14 13 12 11 10
1
76
9
8
SE 139TH PL
156TH AVE SE154TH AVE SE336.4 MCMACSRABC
ABC336.4 MCMACSRFUSE @ 100T
SW#T79976
DEVELOPER RESPONSIBLE
FOR CONDUIT/WIRE FROM
H2B TO METER LOCATION
#2 ACSR
ST LT
53'
53'FEED60'
N
Vicinity Map
47.4780, -122.1333
Owner / Developer Contact Info
officeATTN:
SSHI LLC DBA D.R. HORTON
12910 TOTEM LAKE BLVD NE
KIRKLAND, WA., 98034
PATRICK DANNER 425-821-3400
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
GAS
PHONE
CABLE TV
504719088 105085461
N/A 105087299
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A 107054471
N/A 106326123
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Comm. H.H.
Relocation
Removal
Temporary
Job Order
Distribution
Service Stubs
HP Svc/MSA
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.THE CUSTOMER IS RESPONSIBLE FOR PROVIDING ALL TRENCHING, PER THE TRENCH
PROFILE, AND ALL EXCAVATIONS AT THE TRANSFORMER/HANDHOLE VAULT SITES
SUCH THAT PSE FACILITIES WILL MATCH FINAL GRADE. VAULT HOLES WILL HAVE
STABLE LEVEL BOTTOMS. CUSTOMER WILL PROVIDE 6" OF CRUSHED ROCK FOR
VAULT BEDDING. ALL TRENCHES WILL HAVE 6" OF WASHED SAND COVER AND 4"
BEDDING FOR ALL CONDUITS. THE CUSTOMER WILL PROVIDE SELECT BACKFILL, IF
REQUIRED, AND COMPACTION AS NECESSARY. THE CUSTOMER IS RESPONSIBLE FOR
DISPOSAL OF ALL NATIVE SPOILS NOT SUITABLE FOR USE AS BACKFILL. ALL
TRENCHES MAY BE JOINT WITH GAS, TELEPHONE AND TV CABLE.
ALL CABLES/CONDUITS TO BE INSTALLED IN CUSTOMER'S TRENCH AT THE DEPTH
INDICATED IN TRENCH DETAIL (DEPENDENT UPON SIZE OF CONDUIT BEING INSTALLED
TO MEET MIN 36" OF COVER). INSTALL CABLE ID TAGS AT EACH END OF THE PRIMARY
CABLES PER THE CIRCUIT ONE-LINE DIAGRAM.
UNLESS OTHERWISE SPECIFIED BY MUNICIPALITIES, INSTALL PVC (DB-120) ROAD
CROSSINGS AS INDICATED ON THE CROSSINGS CONDUIT TABLE & AS SHOWN ON
WORK SKETCH. CROSSINGS SHALL BE INSTALLED BY CUSTOMER/DEVELOPER PER
PUGET SOUND ENERGY STANDARDS.
AT SYMBOL: INSTALL UNDERGROUND PRIMARY CABLES IN
CONDUIT. CABLE LENGTH AND CONDUIT SIZE AS INDICATED ON PRIMARY CABLE &
CONDUIT TABLE.
AT SYMBOL: INSTALL 600 VOLT UG SECONDARY CABLES IN
CONDUIT. CABLE/CONDUIT SIZE AND LENGTH AS INDICATED ON SECONDARY CABLE &
CONDUIT TABLE.
AT SYMBOL: INSTALL MINI-PAD HANDHOLE & PADMOUNT TRANSFORMER.
ADDITIONAL EQUIPMENT AS INDICATED ON VAULT TABLE.
AT SYMBOL: INSTALL SECONDARY PEDESTAL/HANDHOLE W/ (3)
MULTI-CONNECTORS. SIZE AS INDICATED ON SECONDARY HH/PEDESTAL TABLE.
(EXCAVATION: 3' SQ.)
AT SYMBOL: INSTALL JUNCTION BOX HANDHOLE. ADDITIONAL EQUIPMENT AS
INDICATED ON VAULT TABLE.
AT SYMBOL: INSTALL SECONDARY CABLE & CONDUIT STUB-OUT.
AT SYMBOL: INSTALL STREET LIGHTING STANDARD. SIZE AND TYPE OF
STANDARD/LUMINARIE AS INDICATED ON STREET LIGHTING TABLE. (CUSTOMER TO
EXCAVATE & INSTALL CORRUGATED STREET LIGHT TUBES FOR PLACEMENT OF THE
STREET LIGHT STANDARDS. )
INCLEMENT WEATHER CONDITIONS MAY CAUSE DELAYS IN CONSTRUCTION TIMES
AND DATES.
POWER GENERAL NOTES - PLAT PROJECT
105085461107054471DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
LEE BROWN 425-417-8620 3/2/18
J.SINGLETON 253-395-6967 3/2/18
J.SINGLETON 253-395-6967 3/2/18
D.KANOWSKY .7/10/17
REDT # ( RW-101556 )RENTON
MEADOW VUE
1Ø PRIMARY U/G LINE EXTENSION - 14 S/F LOTS
13833 156th AVE SE, RENTON, WA 98059
PUGET SOUND ENERGY
N/A IP 088-60
107054471 105085461
1" = 50'1 OF 1
KING 30 CIKNC QCSOKE
14SW-T23-R05E 208.086 209.088
2305E055 2306E076 2306E055 MAP-13
COMCAST
BILL WALKER
253-288-7538
CENTURY LINK
AMY ALLISTON
206-794-8534
RIGHT OF WAY
VAL CONNEL
425-462-3518
.
.
.
11.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:LEE BROWN
425-417-8620
lee.brown@pse.com
x
x
x
x
...
...
...
x
x
EMAIL CONTACT
1" = 50'
SCHED.SQ. FT.
MAX LRC =
CIRCUIT FEET ADDED: 589'
27 3600
140AMPS
SITE PLAN
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
MAP-13
6/17/17
49 8 32
-9 -
49 17 32
VAULT DETAIL @ V01
NOT TO SCALE
TOP VIEW
SIDE
VIEW
EXCAVATION:
4-2/3 CUBIC YARDS
Rock
Crushed
6"
3'-6"
2"
6'
6'
48"42"
36"
38"
42"
Struts
FRONT
FRONTTYPICAL NOTCH-OUT FOR TRANSFORMER,
NOT TO SCALE
& SECONDARY PEDESTAL/HANDHOLE
BACK OF EASEMENT
STANDARD
EASEMENT
LINE
ROW
10'
PL
1'
4' - 5'
Min.
1'
7'7'
TRANSFORMER
(WHEN PRESENT)
JOINT TRENCH DETAIL
NOT TO SCALE
JOINT TRENCH DETAIL
NOTES:
1. If the final backfill contains rocks greater than 8 inches in diameter , install 12 inches compacted sand shading across the full width of the trench. *
If the final backfill contains rocks 8 inches in diameter or smaller , install 6 inches compacted sand shading across the full width of the trench. *
2. Rocks greater than 10 inches diameter are not permitted in the final backfill.
3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the
side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line.
4. Utilities shall not be stacked over the gas line in the trench.
5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements.
6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies.
* Alternatives to full-width trench shading require PSE approval.
Primary & Secondary-Mainline Gas & Communications (NTS)
ROAD SIDE
NATIVE
SECONDARY POWER
PEDESTAL
MATERIAL
P/L
Power
Secondary
Power
Primary
Conduit
Tel. & TV
12" Min
12" Sand
Cover when
gas line is in
trench
Sand
6" or 12"
4" Sand Bedding
1'
36"
Cover
42"
Gas
12"
18"
Lower 2"
10"
Pedestal
PSE 10' FRONTAGE
EASEMENT
1'
Cover
ROAD SIDE
MINIPAD
MINIPAD
FIELD SIDE
VAULT
6" of crushed rock
(base for vault)
P/L
Power
Secondary
Power
Primary
Gas
12" Min Horizontal Separation
Communications
42" Min
21"1'
Feeder
38"
2"
4" Sand Bedding
12" Sand
Cover
36"
Cover
4" Sand Bedding
42"
6" Additional depth when
Feeder is required
PSE 10' FRONTAGE EASEMENT
1'
TRANSFORMER
Final
Backfill
Initial
Backfill
Trench Depth
42" - 48"
Primary
Dirt Pile
Final Grade
24" Min
36"
Min Cover
Over Power
48"
Max
Depth
Final Backfill
Gas
4" Sand Bedding
Property Line
intercept (depth varies).
SidewalkCurb
Location of roof drain
48" Typical
Width may vary per
Number of Utilities
and Conduits
6" or 12" Min Sand Shading
Over Gas after Compaction
12" Min
R/W or
Excavated
12" Typical
Power
Secondary
Power
TV & TEL
12" Min
12" Min
Separation
4,5
1,2
1
3
6
6" or 12" Min Sand Shading
Over Power after Compaction1
VAULT DETAIL @ V02
NOT TO SCALE STD 6775.0030
EXCAVATION: _____ CUBIC YARDS
3'-6"
SIDE VIEW
2"
6"
CRUSHED
ROCK
TOP VIEW
7'
7'
6 1/3
FAULT CURRENT TABLE
3075$16)250(569
120V WINDINGS 240V WINDINGS
LOCATION SIZE R/X MIN.
%Z
FAULT
CURRENT
MIN.
%Z
FAULT
CURRENT
V02 75KVA 0.5 2.30 36,200 AMPS 1.80 23,100 AMPS
Developer Note:
The following Fault Current information MUST BE conveyed
to the builder of the units:
All units may require upgraded house electrical equipment as the
fault current at the meter base may exceed 10,000 amps.
CROSSINGS CONDUIT TABLE
GAS POWER Length
X-ING Location Size Type Qty Location Size Type Qty
NO.from to (in)sched each N-S-E-W (in)sched each (ft)
X01 LOT 8 LOT 9 2 40 1 WEST 3 80 1 55 SECONDARY, GAS SERVICE
X02 LOT 6 LOT 11 2 40 1 EAST 3 2 55 SECONDARY, GAS SERVICE
X03 LOT 4 LOT 13 2 40 1 EAST 3 2 55 SECONDARY, GAS SERVICE
X04 LOT 3 LOT 14 2 40 1 WEST 3 1 55 SECONDARY, GAS SERVICE
X05 3 1 55 SECONDARY ONLY
2" SCHED 40 YELLOW PVC (ft) =220 385 3" SCHED80 GREY PVC (ft)
Total 2" PVC Plug /Caps =8 14 = Total 3" PVC Plug Caps
Remarks (type of crossing)
(Primary, Feeder, Secondary,
St. Light, Gas only, etc.,)
LOT 1 STM TR
80
80
80
80
SITE SPECIFIC NOTES
At P01 - (317716-167906) 2018 CLASS 2 - 45'
INSTALL (1) 2" PRIMARY RISER ON S/O BRACKETS (RIS2CSS) 6042.1000
STIRRUP (2254100)
ALUM "H" CONN (2168000)
FUSE @ 100T (3412700), TAP 'B' PHASE
INSTALL SW#T79976
INSTALL 1Ø TERM ON FIBERGLASS ARM W/ LOAD INTERRUPTER CUTOUT
& SURGE ARRESTOR (TSU1L1) 6043.1000
336.4 MCMACSRABC
336.4 MCMACSRFUSE @ 100T
SW#T79976
#2ACSR
CFEEDNEW 1/0
EHO878-BØ
NEW 1/0
EHO879-BØ
FUSE @ 40T
SW#T79976
2 4 53
1014131211
1
76 8
9
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
LEE BROWN 425-417-8620 3/2/18
J.SINGLETON 253-395-6967 3/2/18
J.SINGLETON 253-395-6967 3/2/18
D.KANOWSKY .7/10/17
REDT # ( RW-101556 )RENTON
MEADOW VUE
1Ø PRIMARY U/G LINE EXTENSION - 14 S/F LOTS
13833 156th AVE SE, RENTON, WA 98059
PUGET SOUND ENERGY
N/A IP 088-60
107054471 105085461
AS SHOWN 2 OF 2
KING 30 CIKNC QCSOKE
14SW-T23-R05E 208.086 209.088
2305E055 2306E076 2306E055 MAP-13
COMCAST
BILL WALKER
253-288-7538
CENTURY LINK
AMY ALLISTON
206-794-8534
RIGHT OF WAY
VAL CONNEL
425-462-3518
.
.
.
...
...
...
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
EX OVERHEAD CIRCUIT MAP ########
SCALE: 6" = 1 MILE
NEW PRIMARY UNDERGROUND CIRCUIT ONE-LINE DIAGRAM
NOT TO SCALE
EX UNDERGROUND CIRCUIT MAP ########
SCALE: 1" = 100'
SITE
SITE
Site Grid Vault Size Type & Size Primary Bushings Transformer ASBUILT INFORMATION
Number & Cover Equipment ID Numbers Foreman-Complete
in Vault LB DC (Company ID)(Include Trf Phase tapped)
317712 42X48X38 50KVA MP TRF
167890 Unistrut HH 120/240 2 -MINU1SL 6045.1010 (BØ)
Matid:7663001 Matid:6247100
317713 54X54X38 75KVA MP TRF
167862 Unistrut HH 120/240 1 1 MINU1LR 6045.1010 (BØ)
Matid:7663002 Matid:6247150
Vault & Equipment Table
V01
V02
PRIMARY CABLE & CONDUIT TABLE
CONDUIT
LOCATION Size Qty Design BENDS PULL PULL Cable Design Foreman- Complete Cable Numbers
from to (in)
Length
(ft)90°45°22°11°(lbs)
Rev
(lbs)Size
Length
(ft)A B C Manufacturer Compound Year
P01 V01 2 1 200 1 1 2 62 154 1/0 AL JKT 245 EHO878
V01 V02 2 1 270 110 110 1/0 AL JKT 290 EHO879
V02 E01 2 1 140 1 1
2" PVC (ft) & Bends =610 1 2 3 0.81 0.26 Qts 535 = Total 1/0 AL JKT (ft)
PRIMARY CABLE
Foreman Please Record
Actual Amount Installed
(Conduit & Cable)
ASBUILT
42"
45°42"
1'
45°Property LineRoad Side
Top View of Mainline Trench for
Single Stubout Location
3'Property LineRoad Side
Top View of Mainline Trench for Pedestal
or Double Stubout Location
42"45°
3'
45°
STUBOUT EXCAVATION DIMENSIONS
NOT TO SCALE
MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
OIL-FILLED EQUIPMENT
TRANSFORMER
APPROVED
AREA
COMBUSTIBLE BUILDING WALLS & ROOF10'
10'
10'
COOLING
5' MIN
5' MIN
10' MIN
5'
MIN
FINS
ACCESS
CONCRETE PAD
MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
CURB OR EDGE OF PAVEMENT
CURB OR EDGE OF PAVEMENT
5' MIN
ROAD OR
PARKING AREA
TYP. PAD
& TRANS-
FORMER
3'
MIN
3' MIN
DOOR
ACCESS
DOOR
REQUIRED
WORK SPACE
AREA
3' MIN
@ H2A, H2B
SHALL BE STAGGERED
CONNECTOR BARS
IN THE FRONT
NEUTRALS SHALL BE 18"
16"
13"
12"10"
2"
10"
Pedestal will accept up to six 3" conduits
SEALED WITH FOAM
CONDUIT SHALL BE
120 PVC CONDUIT ELBOWS
TYPICAL 24" RADIUS DB
SIDE VIEW WITH CONDUIT
10"
18"
16"
13"
10"
2"
36"
FRONT VIEW WITH CONDUIT
SECONDARY PEDESTAL DETAIL
NOT TO SCALE
CLEAR WORKING SPACE FOR VAULTS
NOT TO SCALE
FIELD SIDE (PREFERRED)
ROAD SIDE (PREFERRED)
6' MIN
3'
MIN
3'
MIN
3' MIN
NOT TO SCALE
NEW CONDUIT DIAGRAM
SECONDARY 2"
SECONDARY 3"
PRIMARY 2"
CONDUIT LEGEND
SECONDARY CABLE & CONDUIT TABLE
LOCATION CABLE Assumed CONDUIT VOLTAGE VOLTAGE ASBUILT INFORMATION
SIZE LENGTH Lot Corner SIZE LENGTH BENDS DROP FLICKER Foreman - Complete
FROM TO
(1/O,4/O,
350)
Design (ft)
to Meter (ft)(in)
Design
(ft)(Percent)(Percent)Actual Amount Installed (Conduit & Cable)
V01 LOT 6 1/O 15 50 2 15 1 1.9 3.0
V01 LOT 7 1/O 15 50 2 15 1 1.9 3.0
V01 LOT 8 4/O 80 50 3 80 1 2.1 3.6
V01 LOT 9 350 155 50 3 100 2 2.2 3.8
V01 LOT 10 4/O 80 50 3 25 2 2.1 3.6
V01 LOT 11 4/O 75 50 3 20 1 2.1 3.5
V02 H2A 350 150 3 150 2 2.0 2.1
V02 H2B 350 190 3 135 3 0.9 2.4
V02 LOT 1 4/O 80 50 3 80 1 1.9 3.0
V02 LOT 2 1/O 15 50 2 15 1 1.6 2.4
V02 LOT 3 1/O 15 50 2 15 1 1.6 2.4
V02 LOT 14 4/O 85 50 3 30 2 1.9 3.1
H2A LOT 4 1/O 50 2 2.5 3.2
H2A LOT 5 1/O 50 2 2.5 3.2
H2A LOT 12 4/O 90 50 3 35 2 2.7 3.8 4/O TO METER
H2A LOT 13 4/O 85 50 3 30 1 4/O TO METER
1/O UG Triplex (ft) =60 2" PVC & Bends =60 4 0.2
4/O UG Triplex (ft) =575 3" PVC & Bends =685 17 2.0
350 UG Triplex (ft) =495 Total Qts of Glue =2.2
2.7 3.7
HH/PEDESTAL TABLE
Site Pedestal Number of Remarks
or Positions (Include phasing information)
Handhole Required
H2A Handhole 5 SEPL6 6050.1000 (BØ)
H2B Pedestal 2 SEPS3 6050.1000 (BØ)CHARGE TO WO#105087299
1
Standoff Bracket
15" Min Length
Conduit Clamp
Conduit Field Face
Quadrant
Climbing
Space
Road Face
Quadrant
Climbing
Space
5" Min
CL LCDirection of Vehicular Traffic
CONDUIT RISER PLACEMENT DETAIL
TOP VIEW
NOT TO SCALE
COMM HH - CHARGE TO 105087299