Loading...
HomeMy WebLinkAboutMFP18001353DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP18001353 IVR Number: 18001353 Permit Informa!on Permit Name:Puget Sound Energy - Electric Address/Loca!on:03/16/2018Applica!on Date:2296500118Parcel Number:1412 N 26TH ST Permit Type :03/21/2018Issue Date:Franchise Permit Work Class:03/21/2019Expira!on Date :Minor U%lity Job Number:101110344Franchise Type :Electric Descrip!on:Remove 2 bad poles. Install new UG service off pole P01 to new meter M01. Removing existing OH service from P01 to M02. transfer new transformers to new poles (P01 & P02). Customer to open work pit at base of P01 to connect new service. Restoration per City of Renton Standards. Contacts Name Address PhoneTypeBilling ANISH KUMAR PUGET SOUND ENERGY - ELECTRIC - BILLING 6905 S 228th St Kent, WA 98032 B: (253) 208-2183Applicant Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: BL.005109Electrical Contractor : POTELI*344O4 Construc!on Contractor : POTELI*227PL CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner ANISH KUMAR PUGET SOUND ENERGY - ELECTRIC - BILLING 6905 S 228th St Kent, WA 98032 B: (253) 208-2183Specialized Billing X General Condi!ons & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 | Published: 3/30/2017 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 3/30/2017 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street ☐ Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Puget Sound Energy - Electric 101110344 Anish Kumar 253-208-2183 anish.kumar@pse.com 1412 N 26th St 98056 101110344 Zahorski Replacing two B/O poles (P01 & P02). Installing new UG service off pole P01 to new meter M01. Removing existing OH service from P01 to M02. Transferring new transformers to new poles (P01 & P02). Customer will be opening 4'x4' work pit at base of P01 to connect new service. Restoration per City of Renton standards. 10'x30" Potelco Inc.253-208-2183 BL005109 Poteli*227PL 3/16/2018 Scott Warlick 3/16/2018 MFP18001353 Holly Powers 3/21/2018 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: • Comply with all traffic regulations of the City of Renton and the State of Washington. • Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. • Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. • Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. • Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. • The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. • In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. • Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. • By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: Reset FormPrint Form 101110344 Zahorski PSE/Potelco Inc. Nick Lanier 253-266-4957 6905 S 228th St, Kent, WA 98032 nicholas.lanier@pse.com 1412 N 26th St TBD 3/16/2018 Anish Kumar 3/16/2018 MFP18001353 Scott Warlick 3/21/2018Monday - Friday 8:00am - 3:30pm SKETCH I -- NORTH -- I NOTES: • Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. • The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. • Approved Temporary Traffic Control Plan must be at the work site during work hours. • Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. • Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. • Total road closure lasting more than 24 hours is subject to the approval by the City Council. • Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: • Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. • Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. • The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. • Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). FROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING 1412P01P02101010101010N 26TH STMEADOW AVE NM01STOPFLAGGER STOP FLAGGER W20-7AROADWORKAHEADW20-1ROADWORKAHEADW20-1W20-7ABEPREPAREDTOSTOPW3-4ROADWORKAHEADW20-11010100'100'100'100' 100'FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGRESIDENT(S) WILL BEINFORMED OF POSSIBLETEMPORARY DRIVEWAYCLOSUREJob#1011103441412 N 26TH ST, RENTON, WAMarch 6, 2018Sheet 1 of 1 gregory.harwood@pse.com(425) 424-6425NPSEPUGETSOUNDENERGYPOLETRAFFIC MANAGEMENT, INC.www.trafficmanagement.comC31 # 785804800.763.3999Traffic Control Services - Sales & RentalsPermits & Consulting - Engineering - TrainingPLAN PREPARED BY:DATE: 3/6/2018-CSPLAN ORDER: 34364TMI CONTACT PERSON: Michael FlanaganTCS CERT #: 301872CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040MINIMUM TAPER LENGTH = L (feet)LANEWIDTHSPOSTED SPEED LIMITS20253035404510111255 +60/6545/5535/403025SIGN SPACING"X"800500'350'200'100'Notes:1.All signs and spacing to conform to the MUTCD and City of RENTONstandards.2.All sidewalks, driveways, exits and egresses shall be completely clearunless otherwise indicated.3.Channelizing devices are 28" traffic cones.4.Sign size can be a minimum of 48" x 48" and shall not obstruct pedestrianaccess.5.Crew is required to leave a minimum of 11' for traveling lane width.6.Alert affected residents and businesses.7.Work to take place between 9 a.m. and 4 p.m.8.Work area will be 130' and 260' WCL of MEADOW AVE N & 15' NCL of N26TH ST.TRENCH28" TRAFFIC CONELEGENDBORE PITTRAFFIC FLOWWORK VEHICLESIGN LOCATIONWARNING FLAGFLAGGERSTOPet Sound Energyic Control Supervisor:ory Harwood No. 008997 Exp. 08/13/2019ory.harwood@pse.com)424-6425MFP18001353 HIG 15 PARCEL # 2296500118 N 26TH ST 37.5kVA 120/240v 50kVA 120/240v 1412 TREE TRIMMING REQUIRED 1 CUBIC YARD 5/8" CRUSHED ROCK CUSTOMER SUPPLIED 4' X 4' WORK PIT CUSTOMER SUPPLIED CUSTOMER SUPPLIED 3/4" CUBIC YARD SAND 4' X 4' WORK PIT CUSTOMER SUPPLIEDINST. 1-RUN 1/0 UG TPX ± 80' CUSTOMER SUPPLIED 1-3" SCH'L 40 DISCONTINUOUS PVC CONDUIT ± 30' SITE PLAN N Vicinity Map N/A Owner / Developer Contact Info officeATTN: MEHL HOMES INC PO BOX 5447 KENT, WA 98064 ETHAN MEHL (253) 797-1891 ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.101110344FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. GAS PHONE CABLE TV 108104837 PROJECT PHASE PWR NOTIF#ORDER# Superior Service E-Mail: Cell Phone: Project Manager Contact Information: Manager:NICHOLAS LANIER 253-266-4957 nicholas.lanier@pse.com PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" SCALE: 1" = 50' THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP N. LANIER 253-266-4957 2.13.18 N. LANIER 253-266-4957 2.13.18 T. MYER (714) 893-2405 2.13.18 N/A RENTON ZAHORSKI POLE REPLACEMENTS & OH TO UG SVC 1412 N 26TH ST, RENTON, WA 98056 N/A N/A N/A 101110344 AS NOTED 1 OF 1 KING N/A N/A CSPSKEIN SE 10-A2N-305 N/A N/A 2305E040 2305E040 2305E018 HIG-15 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 101110344505406159 SITE SPECIFIC NOTES AT P01: 319081-166265 -REMOVE EXISTING 40' POLE -INSTALL NEW 45' CL-2 POLE W/ GROUND AS STAKED (PD452) PER STD 6010.1000 ,167$//‘373 7$1 3(567' -TRANSFER EXISTING 37.5kVA OH XFMR -REPLACE 15T FUSE -INSTALL 3" SEC RISER (RIS3CSS) PER STD 6042.1000 -TRANSFER EXISTING OH SVC FOR "1408" & "1409" -COMM TO TRANSFER AT P02: 319081-166252 -REMOVE EXISTING 40' POLE -INSTALL NEW 45' CL-2 POLE W/ GROUND AS STAKED (PD452) PER STD 6010.1000 ,167$//‘373 7$1 3(567' -TRANSFER EXISTING 50kVA OH XFMR -REPLACE 20T FUSE -INSTALL 3" SEC RISER (RIS3CSS) PER STD 6042.1000 -TRANSFER EXISTING OH SVC FOR "1314", "1313", "1402", & "1401" -COMM TO TRANSFER -TRANSFER STREET LIGHT M01 AT "1412": NEW METER BASE -INSTALL 200A METER CUSTOMER & DEVELOPER NOTES THE CUSTOMER IS RESPONSIBLE TO PROVIDE ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS 6750.6500 5(48,5('723529,'( ,167$//´',6&217,182866&+('8/(39&&21'8,7)520P01-M01 +/- 30' 5(48,5('723529,'( ,167$//´12132/<38//523(,1$//&21'8,76 -REQUIRED TO PROVIDE 4' X 4' WORK PIT & 1 CUBIC YARD 5/8" CRUSHED ROCK AT P01 5(48,5('723529,'(¶;¶:25.3,7 &8%,&<$5'2)6$1'$7M01 -REQUIRED TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL -REQUIRED TO PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS & TRENCH AT ALL TIMES -REQUIRED TO EXCAVATE & EXPOSE EXISTING PSE UG FACILITIES 48 HOURS PRIOR TO CONSTRUCTION -PSE INSPECTION IS REQUIRED PRIOR TO FINAL BACKFILL -PSE WILL NOT ENERGIZE FACILITIES UNTIL BACKFILL IS COMPLETE -RENTON INSPECTION & APPROVAL IS REQUIRED 5 BUSINESS DAYS PRIOR TO CONNECTION SPAN SPECIFIC NOTES P01 TO M01: &86720(572,167$//',6&217,18286*5(<6&+ /&21'8,7“ ,167$//5818*73;“¶ 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. 2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. 3.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. 4.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. 5.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. 6.Roads shall be paved or have a compacted , crushed rock base in place. 7.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. 8.All work is to be done in accordance with local municipal and county permit requirements as applicable. 9.Inclement weather conditions may cause delays in construction times and dates. 10.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. POWER GENERAL NOTES - RESIDENTIAL PROJECT CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE HIG-15 06/2017 347.00 78.00 161.00 1.32 0.00 0.00 348.32 78.00 161.00 OVERHEAD CIRCUIT MAP 2305E040 SCALE: 6" = 1 MILE NEW CABLE & CONDUIT DIAGRAM NOT TO SCALE JOB SITE JOB SITE ASPLUNDH CONSTRUCTION CORP. ConduitField Face Quadrant Climbing Space Road Face Quadrant Climbing Space 5" Min CL LCDirection of Vehicular Traffic Standoff Bracket 15" Min Length Conduit Clamp UNDERGROUND CABLE CONDUITS TO THIS QUADRANT TOP VIEW OUTAGE LIST -1408 N 26TH ST - MARLEEN MANDT -1409 N 26TH ST - RONGHUI HANATATE -1401 N 26TH ST - PATRICIA BANASKY -1402 N 26TH ST - LARRY FELL -1314 N 26TH ST - LORETTA & OREE BOSCHMA -1313 N 26TH ST - HOWARD BANASKY METER DETAIL @ M01 SCALE: NONE 32" Typical 24" Min 24"-36" 4'Top View Electric & Joint Utility Work Pit Dimensions 36" Min Drainage Pipe 12" Minimum Clearance from Gas Service Lines Conduit Depth 24" to 36" Max Regulator Gas Meter Assembly 48" 4'8" Service (Permanent Detail:) Not to Scale Conduit Ends Closed 4'8" 24" Min 36" Typical 3' To Trench Property Line Conduit Stakes Customer Provided 3" Schedule 40 Grey PVC Power Cable Conduit Customer Provided Gas Service Line Conduit 3" Conduit Service Riser Customer Provided Elec. Mtr Base Elec Mtr utility provided Gas Meter Relief Vent Building Wall Elec. Mtr Vent Utility Provided Seal 24"-36" CONDUIT RISER PLACEMENT DETAIL SCALE: NONE TV & TEL Electric Service Cable in Conduit 3" Schedule 40 Grey PVC Excavated Dirt Pile Final Grade 24" Min 24" Min to 36" Max Cover Backfill for Conduit Free of rocks larger than 8" in diameter Separation 12" Min in Conduit Schedule 40 White PVC Gas Service Line 32" Typical (Power, Gas, Phone & Cable) Separation 12" Min 12" Min Separation 36" MINIMUM COVER IN RIGHT OF WAY JOINT TRENCH DETAIL Joint Service Line in Conduit (NTS) To Excavated Dirt Pile Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter. 593193053 583058716 101110345505499655 108104838 CIRCUIT FEET ADDED: 0' SQ. FOOTAGE: 1,742 SQ FT PANEL SIZE: 200A HEAT TYPE: GAS EST. DEMAND: 9kW LRC: 115A % V. DROP: 0.8% % FLICKER: 3.2% TYPICAL AUGERED WORK SITE - 0150.3200 TECHNIQUES FOR EROSION AND SEDIMENT CONTROL PLACE PEA GRAVEL BAGS (MID 9995892) FOR SEDIMENT TRAP PLACE STRAW MULCH ON DISTURBED AREAAUGERED HOLE POLE DITCH OR SENSITIVE AREA New pole at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER TRANSFER Company ID#: Primary phase connected to: Tested Secondary Voltage P01 319081-166265 37.5kVA New pole at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER TRANSFER Company ID#: Primary phase connected to: Tested Secondary Voltage P02 319081-166252 50kVA RETIREMENT POLE TABLE SITE # POLE DATA POLE TRANSFERS REMARKS GRID #HEIGHT CLASS YEAR XFMR CO. ID#TOPPED RMVD TEL TV FIBER ST. LIGHT (ADDITIONAL INFORMATION) P01 319081-166265 40 UNK UNK P02 319081-166252 40 UNK UNK POLE TABLE (NEW) Site # Pole Data Grid #Height Class Year Remarks / Location Ref. P01 319081-166265 45 2 2018 PSE Equip # P02 319081-166252 45 2 2018 PSE Equip #MFP18001353 TO: City of Renton RE: PSE Job Number 101110344 TYPE OF WORK: Changing out BO pole grid # 319081-166252 installing new class 2 45’pole approx. same location transfer all hardware and re-connect existing services. install Changing out BO pole grid # 319081-166265 installing new class 2 45’pole approx. same location transfer all hardware and re-connect existing services. Install new sec risers to serve “1412” underground LOCATION OF WORK: 1412 N 26th ST, Renton WAm 98056 SCOPE OF WORK: At location P01 and P02 as shown on the attached copy of the worksketch, PSE is requesting exemption to change out old pole and install new pole so we can extend serve “1412” from P01 to M01 OH to UG service. We have submitted along with this the design for approval and traffic control plans for this work. Give me a call if there are any questions on the work to be done. Sincerely, Nick Lanier Engineer in Training South King Co. Customer and System Projects PUGET SOUND ENERGY 253-234-6437 (O) 253-266-4957 (M) 6905 S 228th st Kent, WA 98032 MFP18001353