HomeMy WebLinkAboutP_Design_101110344_V1_180316HIG
15
PARCEL #
2296500118
N 26TH ST
37.5kVA 120/240v
50kVA 120/240v
1412
TREE TRIMMING
REQUIRED
1 CUBIC YARD 5/8" CRUSHED ROCK
CUSTOMER SUPPLIED
4' X 4' WORK PIT
CUSTOMER SUPPLIED
CUSTOMER SUPPLIED
3/4" CUBIC YARD SAND
4' X 4' WORK PIT
CUSTOMER SUPPLIEDINST. 1-RUN 1/0 UG TPX ± 80'
CUSTOMER SUPPLIED
1-3" SCH'L 40 DISCONTINUOUS PVC CONDUIT ± 30'
SITE PLAN
N
Vicinity Map
N/A
Owner / Developer Contact Info
officeATTN:
MEHL HOMES INC
PO BOX 5447
KENT, WA 98064
ETHAN MEHL (253) 797-1891
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.101110344FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
GAS
PHONE
CABLE TV
108104837
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Service
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:NICHOLAS LANIER
253-266-4957
nicholas.lanier@pse.com
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
SCALE: 1" = 50'
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
N. LANIER 253-266-4957 2.13.18
N. LANIER 253-266-4957 2.13.18
T. MYER (714) 893-2405 2.13.18
N/A RENTON
ZAHORSKI
POLE REPLACEMENTS & OH TO UG SVC
1412 N 26TH ST, RENTON, WA 98056
N/A N/A
N/A 101110344
AS NOTED 1 OF 1
KING N/A N/A CSPSKEIN
SE 10-A2N-305 N/A N/A
2305E040 2305E040 2305E018 HIG-15
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
101110344505406159
SITE SPECIFIC NOTES
AT P01: 319081-166265
-REMOVE EXISTING 40' POLE
-INSTALL NEW 45' CL-2 POLE W/ GROUND AS STAKED (PD452) PER STD 6010.1000
,167$//3737$13(567'
-TRANSFER EXISTING 37.5kVA OH XFMR
-REPLACE 15T FUSE
-INSTALL 3" SEC RISER (RIS3CSS) PER STD 6042.1000
-TRANSFER EXISTING OH SVC FOR "1408" & "1409"
-COMM TO TRANSFER
AT P02: 319081-166252
-REMOVE EXISTING 40' POLE
-INSTALL NEW 45' CL-2 POLE W/ GROUND AS STAKED (PD452) PER STD 6010.1000
,167$//3737$13(567'
-TRANSFER EXISTING 50kVA OH XFMR
-REPLACE 20T FUSE
-INSTALL 3" SEC RISER (RIS3CSS) PER STD 6042.1000
-TRANSFER EXISTING OH SVC FOR "1314", "1313", "1402", & "1401"
-COMM TO TRANSFER
-TRANSFER STREET LIGHT
M01 AT "1412": NEW METER BASE
-INSTALL 200A METER
CUSTOMER & DEVELOPER NOTES
THE CUSTOMER IS RESPONSIBLE TO PROVIDE ALL TRENCHING, SELECT BACKFILL, COMPACTION &
RESTORATION PER PUGET SOUND ENERGY STANDARDS 6750.6500
5(48,5('723529,'( ,167$//´',6&217,182866&+('8/(39&&21'8,7)520P01-M01 +/- 30'
5(48,5('723529,'( ,167$//´12132/<38//523(,1$//&21'8,76
-REQUIRED TO PROVIDE 4' X 4' WORK PIT & 1 CUBIC YARD 5/8" CRUSHED ROCK AT P01
5(48,5('723529,'(¶;¶:25.3,7 &8%,&<$5'2)6$1'$7M01
-REQUIRED TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL
-REQUIRED TO PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS & TRENCH AT ALL TIMES
-REQUIRED TO EXCAVATE & EXPOSE EXISTING PSE UG FACILITIES 48 HOURS PRIOR TO CONSTRUCTION
-PSE INSPECTION IS REQUIRED PRIOR TO FINAL BACKFILL
-PSE WILL NOT ENERGIZE FACILITIES UNTIL BACKFILL IS COMPLETE
-RENTON INSPECTION & APPROVAL IS REQUIRED 5 BUSINESS DAYS PRIOR TO CONNECTION
SPAN SPECIFIC NOTES
P01 TO M01:
&86720(572,167$//',6&217,18286*5(<6&+
/&21'8,7
,167$//5818*73;¶
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch
must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working
days in advance.
3.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the
underground facilities located.
4.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch
and details for locations. Equipment locations must be approved by the Project Manager.
5.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which
would restrict construction and/or equipment access, before work can begin.
6.Roads shall be paved or have a compacted , crushed rock base in place.
7.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls,
overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE
standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in
the right of way, and at least 1 foot when crossing them.
8.All work is to be done in accordance with local municipal and county permit requirements as applicable.
9.Inclement weather conditions may cause delays in construction times and dates.
10.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this
sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and
24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope
the trench to 1:1.
POWER GENERAL NOTES - RESIDENTIAL PROJECT
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
HIG-15
06/2017
347.00 78.00 161.00
1.32 0.00 0.00
348.32 78.00 161.00
OVERHEAD CIRCUIT MAP 2305E040
SCALE: 6" = 1 MILE
NEW CABLE & CONDUIT DIAGRAM
NOT TO SCALE
JOB SITE
JOB SITE
ASPLUNDH CONSTRUCTION CORP.
ConduitField Face
Quadrant
Climbing
Space
Road Face
Quadrant
Climbing
Space
5" Min
CL LCDirection of Vehicular Traffic
Standoff Bracket
15" Min Length
Conduit Clamp
UNDERGROUND
CABLE CONDUITS
TO THIS QUADRANT
TOP VIEW
OUTAGE LIST
-1408 N 26TH ST - MARLEEN MANDT
-1409 N 26TH ST - RONGHUI HANATATE
-1401 N 26TH ST - PATRICIA BANASKY
-1402 N 26TH ST - LARRY FELL
-1314 N 26TH ST - LORETTA & OREE BOSCHMA
-1313 N 26TH ST - HOWARD BANASKY
METER DETAIL @ M01
SCALE: NONE
32"
Typical
24"
Min
24"-36"
4'Top View
Electric & Joint Utility
Work Pit Dimensions
36"
Min
Drainage Pipe
12" Minimum Clearance
from Gas Service Lines
Conduit Depth
24" to 36" Max
Regulator
Gas Meter
Assembly
48"
4'8"
Service (Permanent Detail:)
Not to Scale
Conduit
Ends
Closed
4'8"
24" Min
36" Typical
3'
To Trench
Property Line
Conduit Stakes
Customer Provided
3" Schedule 40 Grey PVC
Power Cable Conduit
Customer Provided
Gas Service Line Conduit
3" Conduit Service Riser
Customer Provided
Elec. Mtr Base
Elec Mtr
utility provided
Gas Meter
Relief Vent
Building Wall
Elec. Mtr
Vent
Utility
Provided
Seal
24"-36"
CONDUIT RISER PLACEMENT DETAIL
SCALE: NONE
TV & TEL Electric Service Cable in Conduit
3" Schedule 40 Grey PVC
Excavated Dirt Pile
Final Grade
24" Min
24" Min
to
36" Max
Cover
Backfill for Conduit
Free of rocks
larger than 8"
in diameter
Separation
12" Min
in Conduit
Schedule 40 White PVC
Gas Service Line
32" Typical
(Power, Gas,
Phone & Cable)
Separation
12" Min
12" Min
Separation
36" MINIMUM COVER
IN RIGHT OF WAY
JOINT TRENCH DETAIL
Joint Service Line in Conduit (NTS)
To Excavated Dirt Pile
Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris,
glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.
593193053
583058716
101110345505499655
108104838
CIRCUIT FEET ADDED: 0'
SQ. FOOTAGE: 1,742 SQ FT
PANEL SIZE: 200A
HEAT TYPE: GAS
EST. DEMAND: 9kW
LRC: 115A
% V. DROP: 0.8%
% FLICKER: 3.2%
TYPICAL AUGERED WORK SITE - 0150.3200
TECHNIQUES FOR EROSION AND SEDIMENT CONTROL
PLACE PEA GRAVEL
BAGS (MID 9995892)
FOR SEDIMENT TRAP
PLACE STRAW MULCH ON
DISTURBED AREAAUGERED HOLE
POLE
DITCH OR SENSITIVE AREA
New pole at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER TRANSFER
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
P01
319081-166265
37.5kVA
New pole at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER TRANSFER
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
P02
319081-166252
50kVA
RETIREMENT POLE TABLE
SITE
#
POLE DATA POLE TRANSFERS REMARKS
GRID #HEIGHT CLASS YEAR XFMR CO. ID#TOPPED RMVD TEL TV FIBER ST. LIGHT (ADDITIONAL INFORMATION)
P01 319081-166265 40 UNK UNK
P02 319081-166252 40 UNK UNK
POLE TABLE (NEW)
Site
#
Pole Data
Grid #Height Class Year Remarks / Location Ref.
P01 319081-166265 45 2 2018 PSE Equip #
P02 319081-166252 45 2 2018 PSE Equip #