HomeMy WebLinkAboutMFP18001355DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP18001355
IVR Number: 18001355
Permit Informa!on
Permit Name:Puget Sound Energy - Electric
Address/Loca!on:03/16/2018Applica!on Date:8645501100Parcel Number:1607 FERNDALE AVE SE
Permit Type :03/27/2018Issue Date:Franchise
Permit Work Class:03/27/2019Expira!on Date :Minor U)lity
Job Number:593192976Franchise Type :Electric
Descrip!on:Replace B/O elbows at J01. At IP1 Reroute 6' of 4" conduit away from gas main. At J02 repair
2 abnormals in vault. At P01 Rebuild UG termination. Concrete cut anticipated. Restoration per
City of Renton standards.
Contacts
Name Address PhoneTypeBilling
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC - BILLING
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Applicant
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: BL.005109Electrical Contractor : POTELI*344O4
Construc!on Contractor : POTELI*227PL
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC - BILLING
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Specialized
Billing
X
General Condi!ons & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Puget Sound Energy - Electric
593192976
Anish Kumar
253-208-2183
anish.kumar@pse.com
1607 Ferndale Ave SE 98058 593192976
Crew to replace B/O elbows at J01. At IP1: Reroute +/- 6' of 4" conduit away
from gas main. J02: Repair 2 abnormals in vault. P01: Rebuild 3PH 1/0 UG termination. 1 4'x10'
concrete cut anticipated. Restoration per City of Renton standards.
Potelco Inc.253-208-2183
BL005109 Poteli*227PL
3/16/2018
MFP18001355
Scott Warlick 3/19/2018
Justin Johnson 3-26-2018
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
Reset FormPrint Form
593192976
PSE/Potelco Inc.
Luke Neely 253-395-6866
6905 S 228th St, Kent, WA 98032
luke.neely@pse.com
1607 Ferndale Ave SE
TBD
4/30/2018
Anish Kumar 3/16/2018
MFP18001355
3-26-2018
8:00 am to 3:00 pm Justin Johnson
Monday through Friday
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
IP1FERNDALE AVE SEBEACON WAY SESE 16TH STGLENWOOD AVE SEFERNDALE AVE SE16071605STOPFLAGG
ER STOPFLAGGE
R
1
5
1
5 15151515RESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSUREmaintain lane widthBEPREPAREDTOSTOPW3-41
0
0
'100'1
0
0
'ROADWORKAHEADW2
0
-
1
W20-7ABE
PREPARED
TO
STOP W3-4100'100'ROAD
WORK
AHEAD W20-1ONE LANEROADAHEADW20-4100'100'ROADWORKAHEADW20-1FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PA
RK PLACE SIGNS ONBOTH SIDES OFWORK AREAR9-9SIDEWALKCLOSEDR9-9S
I
D
EW
A
L
K
C
LO
S
E
D AHEADUSE OTHER SIDESIDEWALK CLOSEDA
H
E
A
D
U
S
E
O
T
H
E
R
S
I
D
E
S
I
D
EW
A
L
K
C
L
O
S
E
D
S
E
1
8
T
H
P
L
Job#5931929761607 Ferndale Ave SE, Renton, WAFEBRUARY 1, 2018Sheet 1 of 4 yuriy.bashtovoy@pse.com(425)398-6193CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGY28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPVAULTVaultWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYNotes:1. All signs and spacing to conform to the MUTCDand City of RENTON standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.4. Sign size can be a minimum of 48" x 48" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.m.Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 008997Card Exp. 08/13/2019gregory.harwood@pse.com(425)424-6425MFP18001355
J02L
A
K
E
Y
O
U
N
G
S
W
A
Y
S
E FERNDALE AVE SEFERNDALE AVE SES
E
1
8
T
H
P
LBEACON WAY SE15151
5
1
5STOPFLAGG
ER
STOPFLAGG
ER
B
E
P
R
E
P
A
R
E
D
T
O
S
T
O
P
W3-4100'100'100'R
O
A
DWO
R
K
A
H
E
A
D
W20-1
W20-7A
B
E
P
R
E
P
A
R
E
D
T
O
S
T
O
P
W3-4100'100'100'R
O
A
DWO
R
K
A
H
E
A
D
W20-1
W20-7ABEPREPAREDTOSTOPW3-4100'100'100'ROADWORKAHEADW20-1W20-7ABEPREPAREDTOSTOPW3-4100'100'100'ROADWORKAHEADW20-1W20-7AFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PA
RK PLACE SIGNS ONBOTH SIDES OFWORK AREAFLAGGERS WILL ASSISTPEDESTRIANS TO CROSSA WORKING ZONEBEACON WAY SE1
1
1
1
RESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSURESE 16T
H
S
T
Job#5931929761607 Ferndale Ave SE, Renton, WAFEBRUARY 1, 2018Sheet 2 of 4 yuriy.bashtovoy@pse.com(425)398-6193CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGY28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPVAULTVaultWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYNotes:1. All signs and spacing to conform to the MUTCDand City of RENTON standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.4. Sign size can be a minimum of 48" x 48" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.m.Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 008997Card Exp. 08/13/2019gregory.harwood@pse.com(425)424-6425MFP18001355
J01SE 17TH CTSE 18TH STM
O
N
R
O
E
A
V
E
S
E
SE 17TH ST15
15 1515STOPFLAGG
ER
STOPFLAGG
ER STOPFLAGGE
R
ONE LANEROADAHEADW20-410
0
'
10
0
'
10
0
'ROADWORKAHEADW20-1W20-7AONE LANEROADAHEADW20-4100'100'ROADWORKAHEADW2
0
-
1
W20-7AROADWORKAHEADW20-1100'100'X'W20-7AUSE MAXIMUMAVAILABLESPACE FOR SIGNFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PAR
K PLACE SIGNS ONBOTH SIDES OFWORK AREAAHE
A
D
USE
O
T
H
E
R
S
I
D
E
SID
E
W
A
L
K
C
L
O
S
E
D AHEADUSE OTHER SIDESIDEWALK CLOSEDRESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSUREJob#5931929761607 Ferndale Ave SE, Renton, WAFEBRUARY 1, 2018Sheet 3 of 4 yuriy.bashtovoy@pse.com(425)398-6193CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGY28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPVAULTVaultWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYNotes:1. All signs and spacing to conform to the MUTCDand City of RENTON standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.4. Sign size can be a minimum of 48" x 48" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.m.Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 008997Card Exp. 08/13/2019gregory.harwood@pse.com(425)424-6425MFP18001355
P01SE 158TH STLAKE YOUNGS
WAY
SE
KIRKLAND AVE
S
ETIFFANY PARKSE 19TH CTSE 20TH CTGLENWOOD AVE SE15151515 1515STOPFLAGG
ER
STOPFLAGG
ERSTOPFLAGG
ER
ONE LANE
ROAD
AHEAD W20-4100'100'100'ROAD
WORK
AHEAD W20-1W20-7AONE LANEROADAHEADW20-4 100'100'100'ROADWORKAHEADW20-1
W20-7A ONE LANEROADAHEADW20-4100'100'100'ROADWORKAHEADW20-1W20-7ABE
PREPAR
E
D
TO
STOP W3-4100'100'ROAD
WORK
AHEAD W20-1FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PA
RK PLACE SIGNS ONBOTH SIDES OFWORK AREAAHEADUSE OTHER SIDESIDEWALK CLOSEDAHEADUSE OTHER SIDESIDEWALK CLOSEDJob#5931929761607 Ferndale Ave SE, Renton, WAFEBRUARY 1, 2018Sheet 4 of 4 yuriy.bashtovoy@pse.com(425)398-6193CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGY28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPPOLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYNotes:1. All signs and spacing to conform to the MUTCDand City of RENTON standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.4. Sign size can be a minimum of 48" x 48" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.m.Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 008997Card Exp. 08/13/2019gregory.harwood@pse.com(425)424-6425MFP18001355
LOC. 1
LOC. 2
LOC. 3
LOC. 4
317141-166793
100T
X1518
317198-166823
50kVA 120/240v MONROE AVE SE317201-166698
F
ERND
A
L
E
A
V
E
S
E
317267-166641
50kVA 120/240v
FERND
A
L
E
A
V
E
S
E
UNDERGROUND CONSTRUCTION
Excavation
-Trenching outside of the Right-of-way shall be of sufficient depth to provide a minimum of 36” of cover
for primary conductors and 24” of cover for secondary conductors.
-Road crossings and all trenches within the Right-of-way shall be of sufficient depth to provide a minimum
of 36” of cover for all conductors or as required by the permitting Agency.
-All conductors/conduits shall have a minimum of 3” of bed and 3” of clean sand cover.
-No rocks larger than 6” shall be included in backfill.
-Backfill in road crossings and within the Right-of-way shall be compacted to 95% density or as required
by the permitting Agency.
-Restore all excavated areas to original condition.
- If four or more six inch conduits are installed in a trench, fluidized thermal backfill (FTB) shall be
installed around the conduits to a depth of six inches above and to the sides of the conduit, and two
inches underneath, per PSE Standard 6790.0140.
Vaults & Handholes
- Refer to PSE standard 6775.0040 “Vault and Handhole Installation”
- Vaults shall be placed level and 2” above final grade in landscaped areas and flush with final grade when
placed in hard surface areas.
- A minimum 6” bed of 5/8” crushed rock shall be placed under all vaults.
- All conduit entrances shall be grouted.
Conductors & Conduit
- Refer to PSE standard 6800.6000 “PVC Conduit Installation”.
- Unless splices are called for, or otherwise noted or approved, conduit risers shall be plumbed directly to
road crossing conduits.
- Install insulating caps on all unused primary bushings.
- All “spare” conduits shall be capped at each end.
01-30-18 PER LUKE NEELY CELL 253-951-8623:
NOTE: EMERGENCY CREW1-S JOB TO REPAIR O#'S 301079 & 429054, 2 FLAGGERS REQ'D
CORE HOURS, LOCATES, OUTAGE ON 6 RESIDENTIAL CUSTOMERS AT 3209 SE 18TH ST ON
O#301079
O#'s 301079 & 429054
FOUR PROBLEMS: REBUILD X1518 PER STD WITH NEW CUTOUTS, ARRESTORS, &
TERMINATIONS. REPLACE THE B/O ELBOW AND JBUS AT E/E OF CABLE 20713. REPAIR TWO
ABNORMALS IN JBOX AT 1801 FERNDALE AVE SE. BETWEEN 1605 & 1607 FERNDALE AVE SE IN
RENTON, REROUTE ABOUT 6 FEET OF 4-INCH CONDUIT (WITH APH & BPH CABLES INSIDE)
AWAY FROM THE GAS MAIN.
AT P01 AT GRID 317141-166793:
NOTE: THERE IS BLEED OVER ON THE OLD METAL BRACKET TRI-UNIT.
REBUILD THE 3PH 1/0 TERMINATION PER STD 6043.1000 FIG 2 (TSU3L1F) WITH NEW FG ARMS,
CUTOUTS, ARRESTORS, AND TERMINATIONS.
AT J01 AT GRID 317198-166823:
REPLACE THE B/O ELBOW AND JBUS AT THE E/E OF BPH CABLE 20713
REPLACE THE APH & CPH JBUSES ALSO AND ANY ELBOWS THAT LOOK BAD.
AT J02 AT GRID 317201-166698 (GRID# IS SHOWN ON OLD UMAP):
REPAIR TWO ABNORMALS IN THE VAULT NOT LABELLED IN OMS.
AT IP1 AT GRID 317267-166641:
BETWEEN 1605 & 1607 FERNDALE AVE SE AT THE STEEL PLATE IN THE STREET, REROUTE
ABOUT SIX FEET OF 4-INCH CONDUIT (WITH APH & BPH CABLES INSIDE) AWAY FROM THE GAS
MAIN PER POTELCO FM DAN KRAMER. NEED LOCATES TO DIG HOLE OUT BIGGER, BACKHOE
TO REMOVE STEEL PLATE, WATER PUMP, AND FILL SAND. GFR REPAIRED THE GAS MAIN
DAMAGE ON 1-29-18.
GENERAL SPECIFICATIONS
Scope of Work
GAS
PHONE
CABLE TV
N/A 594119286
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
UG Expense
Relocation
Removal
Temporary
Job Order
Distribution
HP Main
HP Svc/MSA
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)593192976N
Vicinity Map
NOT TO SCALE
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Correct QC Checklist(s) reviewed.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
L. NEELY 253-395-6866 1/31/18
L. NEELY 253-395-6866 1/31/18
L. ORTIZ 714-893-2405 1/31/18
N/A EMERGENCY
ROL-16 / 1607 FERNDALE AVE SE
REPAIR O#'S 301079 & 429054
1607 FERNDALE AVE SE. RENTON, WA 98058
ASPLUNDH CONSTRUCTION CORP.
O-301079
593192976
AS NOTED 1/2
KING QCSOKE
SW 21-23N-05E
2305E083 2305E088 ROL-162305E083
11364375 593192976
Owner / Developer Contact Info
officeATTN:
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:LUKE NEELY
253-569-2523
LUKE.NEELY@PSE.COM
THOMAS GUIDE
656-E4
SITE MAP - UNIVERSAL MAP (LOCATION 1)
SCALE: 1" = 50' MAP#: 2305E083
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
PSE
No
No
No
Yes
Yes
Yes
"Flagging Required"
"Outages Required"
"Locates Required"
SITE MAP - UNIVERSAL MAP (LOCATION 2)
SCALE: 1" = 50' MAP#: 2305E083
SITE MAP - UNIVERSAL MAP (LOCATION 4)
SCALE: 1" = 50' MAP#: 2305E083
SITE MAP - UNIVERSAL MAP (LOCATION 3)
SCALE: 1" = 50' MAP#: 2305E083
Luke Neely
Luke Neely
253-569-2523
253-569-2523
2/2/18
2/2/18MFP18001355
317198-166823
50kVA 120/240v
317201-166698
317267-166641
50kVA 120/240v
AØ32240
317277-166638
37.5kVA 120/240v
LOC. 1
LOC. 2
LOC. 3
LOC. 4
LOC. 1
LOC. 2
LOC. 3
LOC. 4
GAS
PHONE
CABLE TV
N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
UG Expense
Relocation
Removal
Temporary
Job Order
Distribution
HP Main
HP Svc/MSA
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)593192976FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Correct QC Checklist(s) reviewed.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
L. NEELY 253-395-6866 1/31/18
L. NEELY 253-395-6866 1/31/18
L. ORTIZ 714-893-2405 1/31/18
N/A EMERGENCY
ROL-16 / 1607 FERNDALE AVE SE
REPAIR O#'S 301079 & 429054
1607 FERNDALE AVE SE. RENTON, WA 98058
ASPLUNDH CONSTRUCTION CORP.
O-301079
593192976
AS NOTED 2/2
KING QCSOKE
SW 21-23N-05E
2305E083 2305E088 ROL-162305E083
Owner / Developer Contact Info
officeATTN:
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:LUKE NEELY
253-569-2523
LUKE.NEELY@PSE.COM
UNDERGROUND CIRCUIT MAP
SCALE: 1" = 100' MAP#: 2305E083
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE MAP#: 2305E088
PSE
No
No
No
Yes
Yes
Yes
"Flagging Required"
"Outages Required"
"Locates Required"
N
Vicinity Map
NOT TO SCALE
THOMAS GUIDE
656-E4
594119286
11364375 593192976
12kV 200A TERMINAL POLE, OH TO UG FEED
NOT TO SCALE STD. 6043.1000-2
Luke Neely
Luke Neely
253-569-2523
253-569-2523
2/2/18
2/2/18MFP18001355