Loading...
HomeMy WebLinkAboutP_Design_593192976_V1_180316LOC. 1 LOC. 2 LOC. 3 LOC. 4 317141-166793 100T X1518 317198-166823 50kVA 120/240v MONROE AVE SE317201-166698 F ERND A L E A V E S E 317267-166641 50kVA 120/240v FERND A L E A V E S E UNDERGROUND CONSTRUCTION Excavation -Trenching outside of the Right-of-way shall be of sufficient depth to provide a minimum of 36” of cover for primary conductors and 24” of cover for secondary conductors. -Road crossings and all trenches within the Right-of-way shall be of sufficient depth to provide a minimum of 36” of cover for all conductors or as required by the permitting Agency. -All conductors/conduits shall have a minimum of 3” of bed and 3” of clean sand cover. -No rocks larger than 6” shall be included in backfill. -Backfill in road crossings and within the Right-of-way shall be compacted to 95% density or as required by the permitting Agency. -Restore all excavated areas to original condition. - If four or more six inch conduits are installed in a trench, fluidized thermal backfill (FTB) shall be installed around the conduits to a depth of six inches above and to the sides of the conduit, and two inches underneath, per PSE Standard 6790.0140. Vaults & Handholes - Refer to PSE standard 6775.0040 “Vault and Handhole Installation” - Vaults shall be placed level and 2” above final grade in landscaped areas and flush with final grade when placed in hard surface areas. - A minimum 6” bed of 5/8” crushed rock shall be placed under all vaults. - All conduit entrances shall be grouted. Conductors & Conduit - Refer to PSE standard 6800.6000 “PVC Conduit Installation”. - Unless splices are called for, or otherwise noted or approved, conduit risers shall be plumbed directly to road crossing conduits. - Install insulating caps on all unused primary bushings. - All “spare” conduits shall be capped at each end. 01-30-18 PER LUKE NEELY CELL 253-951-8623: NOTE: EMERGENCY CREW1-S JOB TO REPAIR O#'S 301079 & 429054, 2 FLAGGERS REQ'D CORE HOURS, LOCATES, OUTAGE ON 6 RESIDENTIAL CUSTOMERS AT 3209 SE 18TH ST ON O#301079 O#'s 301079 & 429054 FOUR PROBLEMS: REBUILD X1518 PER STD WITH NEW CUTOUTS, ARRESTORS, & TERMINATIONS. REPLACE THE B/O ELBOW AND JBUS AT E/E OF CABLE 20713. REPAIR TWO ABNORMALS IN JBOX AT 1801 FERNDALE AVE SE. BETWEEN 1605 & 1607 FERNDALE AVE SE IN RENTON, REROUTE ABOUT 6 FEET OF 4-INCH CONDUIT (WITH APH & BPH CABLES INSIDE) AWAY FROM THE GAS MAIN. AT P01 AT GRID 317141-166793: NOTE: THERE IS BLEED OVER ON THE OLD METAL BRACKET TRI-UNIT. REBUILD THE 3PH 1/0 TERMINATION PER STD 6043.1000 FIG 2 (TSU3L1F) WITH NEW FG ARMS, CUTOUTS, ARRESTORS, AND TERMINATIONS. AT J01 AT GRID 317198-166823: REPLACE THE B/O ELBOW AND JBUS AT THE E/E OF BPH CABLE 20713 REPLACE THE APH & CPH JBUSES ALSO AND ANY ELBOWS THAT LOOK BAD. AT J02 AT GRID 317201-166698 (GRID# IS SHOWN ON OLD UMAP): REPAIR TWO ABNORMALS IN THE VAULT NOT LABELLED IN OMS. AT IP1 AT GRID 317267-166641: BETWEEN 1605 & 1607 FERNDALE AVE SE AT THE STEEL PLATE IN THE STREET, REROUTE ABOUT SIX FEET OF 4-INCH CONDUIT (WITH APH & BPH CABLES INSIDE) AWAY FROM THE GAS MAIN PER POTELCO FM DAN KRAMER. NEED LOCATES TO DIG HOLE OUT BIGGER, BACKHOE TO REMOVE STEEL PLATE, WATER PUMP, AND FILL SAND. GFR REPAIRED THE GAS MAIN DAMAGE ON 1-29-18. GENERAL SPECIFICATIONS Scope of Work GAS PHONE CABLE TV N/A 594119286 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A PROJECT PHASE PWR NOTIF#ORDER# Superior UG Expense Relocation Removal Temporary Job Order Distribution HP Main HP Svc/MSA THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773)593192976N Vicinity Map NOT TO SCALE FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Correct QC Checklist(s) reviewed. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP L. NEELY 253-395-6866 1/31/18 L. NEELY 253-395-6866 1/31/18 L. ORTIZ 714-893-2405 1/31/18 N/A EMERGENCY ROL-16 / 1607 FERNDALE AVE SE REPAIR O#'S 301079 & 429054 1607 FERNDALE AVE SE. RENTON, WA 98058 ASPLUNDH CONSTRUCTION CORP. O-301079 593192976 AS NOTED 1/2 KING QCSOKE SW 21-23N-05E 2305E083 2305E088 ROL-162305E083 11364375 593192976 Owner / Developer Contact Info officeATTN: E-Mail: Cell Phone: Project Manager Contact Information: Manager:LUKE NEELY 253-569-2523 LUKE.NEELY@PSE.COM THOMAS GUIDE 656-E4 SITE MAP - UNIVERSAL MAP (LOCATION 1) SCALE: 1" = 50' MAP#: 2305E083 ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. PSE No No No Yes Yes Yes "Flagging Required" "Outages Required" "Locates Required" SITE MAP - UNIVERSAL MAP (LOCATION 2) SCALE: 1" = 50' MAP#: 2305E083 SITE MAP - UNIVERSAL MAP (LOCATION 4) SCALE: 1" = 50' MAP#: 2305E083 SITE MAP - UNIVERSAL MAP (LOCATION 3) SCALE: 1" = 50' MAP#: 2305E083 Luke Neely Luke Neely 253-569-2523 253-569-2523 2/2/18 2/2/18 317198-166823 50kVA 120/240v 317201-166698 317267-166641 50kVA 120/240v AØ32240 317277-166638 37.5kVA 120/240v LOC. 1 LOC. 2 LOC. 3 LOC. 4 LOC. 1 LOC. 2 LOC. 3 LOC. 4 GAS PHONE CABLE TV N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A PROJECT PHASE PWR NOTIF#ORDER# Superior UG Expense Relocation Removal Temporary Job Order Distribution HP Main HP Svc/MSA THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773)593192976FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Correct QC Checklist(s) reviewed. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP L. NEELY 253-395-6866 1/31/18 L. NEELY 253-395-6866 1/31/18 L. ORTIZ 714-893-2405 1/31/18 N/A EMERGENCY ROL-16 / 1607 FERNDALE AVE SE REPAIR O#'S 301079 & 429054 1607 FERNDALE AVE SE. RENTON, WA 98058 ASPLUNDH CONSTRUCTION CORP. O-301079 593192976 AS NOTED 2/2 KING QCSOKE SW 21-23N-05E 2305E083 2305E088 ROL-162305E083 Owner / Developer Contact Info officeATTN: E-Mail: Cell Phone: Project Manager Contact Information: Manager:LUKE NEELY 253-569-2523 LUKE.NEELY@PSE.COM UNDERGROUND CIRCUIT MAP SCALE: 1" = 100' MAP#: 2305E083 OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE MAP#: 2305E088 PSE No No No Yes Yes Yes "Flagging Required" "Outages Required" "Locates Required" N Vicinity Map NOT TO SCALE THOMAS GUIDE 656-E4 594119286 11364375 593192976 12kV 200A TERMINAL POLE, OH TO UG FEED NOT TO SCALE STD. 6043.1000-2 Luke Neely Luke Neely 253-569-2523 253-569-2523 2/2/18 2/2/18