UNDERGROUND CONSTRUCTION
Excavation
-Trenching outside of the Right-of-way shall be of sufficient depth to provide a minimum of 36” of cover
for primary conductors and 24” of cover for secondary conductors.
-Road crossings and all trenches within the Right-of-way shall be of sufficient depth to provide a minimum
of 36” of cover for all conductors or as required by the permitting Agency.
-All conductors/conduits shall have a minimum of 3” of bed and 3” of clean sand cover.
-No rocks larger than 6” shall be included in backfill.
-Backfill in road crossings and within the Right-of-way shall be compacted to 95% density or as required
by the permitting Agency.
-Restore all excavated areas to original condition.
- If four or more six inch conduits are installed in a trench, fluidized thermal backfill (FTB) shall be
installed around the conduits to a depth of six inches above and to the sides of the conduit, and two
inches underneath, per PSE Standard 6790.0140.
Vaults & Handholes
- Refer to PSE standard 6775.0040 “Vault and Handhole Installation”
- Vaults shall be placed level and 2” above final grade in landscaped areas and flush with final grade when
placed in hard surface areas.
- A minimum 6” bed of 5/8” crushed rock shall be placed under all vaults.
- All conduit entrances shall be grouted.
Conductors & Conduit
- Refer to PSE standard 6800.6000 “PVC Conduit Installation”.
- Unless splices are called for, or otherwise noted or approved, conduit risers shall be plumbed directly to
road crossing conduits.
- Install insulating caps on all unused primary bushings.
- All “spare” conduits shall be capped at each end.
01-30-18 PER LUKE NEELY CELL 253-951-8623:
NOTE: EMERGENCY CREW1-S JOB TO REPAIR O#'S 301079 & 429054, 2 FLAGGERS REQ'D
CORE HOURS, LOCATES, OUTAGE ON 6 RESIDENTIAL CUSTOMERS AT 3209 SE 18TH ST ON
O#301079
O#'s 301079 & 429054
FOUR PROBLEMS: REBUILD X1518 PER STD WITH NEW CUTOUTS, ARRESTORS, &
TERMINATIONS. REPLACE THE B/O ELBOW AND JBUS AT E/E OF CABLE 20713. REPAIR TWO
ABNORMALS IN JBOX AT 1801 FERNDALE AVE SE. BETWEEN 1605 & 1607 FERNDALE AVE SE IN
RENTON, REROUTE ABOUT 6 FEET OF 4-INCH CONDUIT (WITH APH & BPH CABLES INSIDE)
AWAY FROM THE GAS MAIN.
AT P01 AT GRID 317141-166793:
NOTE: THERE IS BLEED OVER ON THE OLD METAL BRACKET TRI-UNIT.
REBUILD THE 3PH 1/0 TERMINATION PER STD 6043.1000 FIG 2 (TSU3L1F) WITH NEW FG ARMS,
CUTOUTS, ARRESTORS, AND TERMINATIONS.
AT J01 AT GRID 317198-166823:
REPLACE THE B/O ELBOW AND JBUS AT THE E/E OF BPH CABLE 20713
REPLACE THE APH & CPH JBUSES ALSO AND ANY ELBOWS THAT LOOK BAD.
AT J02 AT GRID 317201-166698 (GRID# IS SHOWN ON OLD UMAP):
REPAIR TWO ABNORMALS IN THE VAULT NOT LABELLED IN OMS.
AT IP1 AT GRID 317267-166641:
BETWEEN 1605 & 1607 FERNDALE AVE SE AT THE STEEL PLATE IN THE STREET, REROUTE
ABOUT SIX FEET OF 4-INCH CONDUIT (WITH APH & BPH CABLES INSIDE) AWAY FROM THE GAS
MAIN PER POTELCO FM DAN KRAMER. NEED LOCATES TO DIG HOLE OUT BIGGER, BACKHOE
TO REMOVE STEEL PLATE, WATER PUMP, AND FILL SAND. GFR REPAIRED THE GAS MAIN
DAMAGE ON 1-29-18.
GENERAL SPECIFICATIONS
Scope of Work
GAS
PHONE
CABLE TV
N/A 594119286
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
UG Expense
Relocation
Removal
Temporary
Job Order
Distribution
HP Main
HP Svc/MSA
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)593192976N
Vicinity Map
NOT TO SCALE
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Correct QC Checklist(s) reviewed.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
L. NEELY 253-395-6866 1/31/18
L. NEELY 253-395-6866 1/31/18
L. ORTIZ 714-893-2405 1/31/18
N/A EMERGENCY
ROL-16 / 1607 FERNDALE AVE SE
REPAIR O#'S 301079 & 429054
1607 FERNDALE AVE SE. RENTON, WA 98058
ASPLUNDH CONSTRUCTION CORP.
O-301079
593192976
AS NOTED 1/2
KING QCSOKE
SW 21-23N-05E
2305E083 2305E088 ROL-162305E083
11364375 593192976
Owner / Developer Contact Info
officeATTN:
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:LUKE NEELY
253-569-2523
LUKE.NEELY@PSE.COM
THOMAS GUIDE
656-E4
SITE MAP - UNIVERSAL MAP (LOCATION 1)
SCALE: 1" = 50' MAP#: 2305E083
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
PSE
No
No
No
Yes
Yes
Yes
"Flagging Required"
"Outages Required"
"Locates Required"
SITE MAP - UNIVERSAL MAP (LOCATION 2)
SCALE: 1" = 50' MAP#: 2305E083
SITE MAP - UNIVERSAL MAP (LOCATION 4)
SCALE: 1" = 50' MAP#: 2305E083
SITE MAP - UNIVERSAL MAP (LOCATION 3)
SCALE: 1" = 50' MAP#: 2305E083
Luke Neely
Luke Neely
253-569-2523
253-569-2523
2/2/18
2/2/18
317198-166823
50kVA 120/240v
317201-166698
317267-166641
50kVA 120/240v
AØ32240
317277-166638
37.5kVA 120/240v
LOC. 1
LOC. 2
LOC. 3
LOC. 4
LOC. 1
LOC. 2
LOC. 3
LOC. 4
GAS
PHONE
CABLE TV
N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
UG Expense
Relocation
Removal
Temporary
Job Order
Distribution
HP Main
HP Svc/MSA
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)593192976FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Correct QC Checklist(s) reviewed.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
L. NEELY 253-395-6866 1/31/18
L. NEELY 253-395-6866 1/31/18
L. ORTIZ 714-893-2405 1/31/18
N/A EMERGENCY
ROL-16 / 1607 FERNDALE AVE SE
REPAIR O#'S 301079 & 429054
1607 FERNDALE AVE SE. RENTON, WA 98058
ASPLUNDH CONSTRUCTION CORP.
O-301079
593192976
AS NOTED 2/2
KING QCSOKE
SW 21-23N-05E
2305E083 2305E088 ROL-162305E083
Owner / Developer Contact Info
officeATTN:
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:LUKE NEELY
253-569-2523
LUKE.NEELY@PSE.COM
UNDERGROUND CIRCUIT MAP
SCALE: 1" = 100' MAP#: 2305E083
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE MAP#: 2305E088
PSE
No
No
No
Yes
Yes
Yes
"Flagging Required"
"Outages Required"
"Locates Required"
N
Vicinity Map
NOT TO SCALE
THOMAS GUIDE
656-E4
594119286
11364375 593192976
12kV 200A TERMINAL POLE, OH TO UG FEED
NOT TO SCALE STD. 6043.1000-2
Luke Neely
Luke Neely
253-569-2523
253-569-2523
2/2/18
2/2/18