Loading...
HomeMy WebLinkAboutP_Design_101109876_V1_18031416427 316895-166187 316915-166180 37.5 kVA 120/240V (A) 316901-166194 SLAG4262 NEW 25 kVA 120/240V (A) 33 6 . 4 M C M A C S R 3 3 6 . 4 MCM AC SR B E N S O N R D S S 28TH ST PARCEL# 0087000007 65.5'ROL 15 16501 16425 16427 16515 16533 16543 16415 2705 1408 1414 1409 140914051307 1305 - CUSTOMER TO INSTALL 1-3" SCH'L 40 CONDUIT, ±50' - PSE TO INSTALL 1-RUN 4/O UG TPX, ±80' CUSTOMER SUPPLIED 4' X 4' WORK PIT CUSTOMER SUPPLIED CUSTOMER SUPPLIED 4' X 4' WORK PIT CUSTOMER SUPPLIED 3/4" CUBIC YARD OF SAND 1 CUBIC YARD 5/8" CRUSHED ROCK SITE PLAN POWER GENERAL NOTES - RESIDENTIAL PROJECT N Vicinity Map N/A Owner / Developer Contact Info officeATTN: OLEG KALINICHENKO 18108 5TH AVE S BURIEN, WA 98148 OLEG KALINICHENKO 253.988.8892 OVERHEAD CIRCUIT MAP 2305E136 SCALE: 6" = 1 MILE SCALE: NONE NEW CABLE & CONDUIT DIAGRAM CUSTOMER-SUPPLIED SERVICE TRENCH ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE ROL-15 6/8/2017 305.00 310.00 329.00 1.75 0.00 0.00 306.75 310.00 329.00 HP Svc/MSA Distribution Job Order Temporary OH Maintenance OH Transformer Removal Superior ORDER#NOTIF# PWR PROJECT PHASE N/AN/A N/A N/AN/A N/AN/A N/AN/A 583058506N/A 108104526N/A CABLE TV PHONE GAS FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. 10. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Inclement weather conditions may cause delays in construction times and dates. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 4500 200A GAS 12KW 65A 3.0% 2.54% 8. 9. PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" X X X X Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: P01 316901-166194 25kVA 6211250 SCALE: 1" = 50'101109876THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) Service Stubs 101109876 N/A N/A UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP D. HONEYSETT 253.245.0883 1/16/2018 D. HONEYSETT 253.245.0883 1/16/2018 E. ORTIZ 714.893.2405 1/16/2018 N/A RENTON KALINICHENKO NEW SFR TRF INSTALL, SECONDARY UPGRADE, OH TO UG PERM SVC 16427 BENSON RD S, RENTON, WA 98055 N/A N/A N/A 101109876 AS NOTED 1 OF 1 KING N/A N/A CSPSKEIN 29NW-T23R-05E N/A N/A 2305E114 2305E136 2305E114 ROL-15 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 505297366 N/A CIRCUIT FEET ADDED: 0 SITE SPECIFIC NOTES AT P01: 316901-166194 -EXISTING 45' CL 1 POLE (2003) TO REMAIN -INSTALL 25kVA 120/240v (FUSE @ 10T) (TRFRXF) PER STD 6025.1000 ,167$//$/80,18067,5583&/$03 7$3$‘ 2254100) -CONNECT NEW 4/O OH TPX SECONDARY (SW) & ST LIGHT TO TRF AT P02: 316895-166187 -EXISTING 30' CL UNK POLE (1959) TO REMAIN -INSTALL 3" SEC RISER (RIS3CSS) PER STD 6042.1000 -TRANSFER EXISTING OH SVC "16501" TO NEW 4/O OH TPX SEC AT P03: 316915-166180 -EXISTING 45' CL 2 POLE (2009) TO REMAIN M01 AT "16427": NEW PERMANENT METER -PSE METER DEPARTMENT TO SET CL200A METER M02 AT "16427": REMOTE TEMP METER -PSE METER DEPARTMENT TO REMOVE TEMP METER SPAN SPECIFIC NOTES P01 TO P02: 5(029((;,67,1*22+73;6(&21'$5<“ ,167$//5812+73;6(&21'$5<“ P02 TO M01 "16427": &86720(572,167$//',6&217,18286*5(<6&+ /&21'8,7“ ,167$//58128*73;“¶ P02 TO M02 "16427" (TEMP METER): -REMOVE EXISTING OH SVC CONDUCTOR P01 TO P03: 5(029((;,67,1*22+73;6(&21'$5<“ -EXISTING OH TPX BRIDLE SVC TO "16425" TO REMAIN JOB SITE JOB SITE TV & TEL Electric Service Cable in Conduit 3" Schedule 40 Grey PVC Excavated Dirt Pile Final Grade 24" Min 24" Min to 36" Max Cover Backfill for Conduit Free of rocks larger than 8" in diameter Separation 12" Min in Conduit Schedule 40 White PVC Gas Service Line 32" Typical (Power, Gas, Phone & Cable) Separation 12" Min 12" Min Separation 36" MINIMUM COVER IN RIGHT OF WAY JOINT TRENCH DETAIL Joint Service Line in Conduit (NTS) To Excavated Dirt Pile Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter. CUSTOMER & DEVELOPER NOTES THE CUSTOMER IS RESPONSIBLE TO PROVIDE ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS 6750.6500 5(48,5('723529,'( ,167$//´',6&217,182866&+('8/(39&&21'8,7)520P02-M01 +/- 50' 5(48,5('723529,'( ,167$//´12132/<38//523(,1$//&21'8,76 -REQUIRED TO PROVIDE 4' X 4' WORK PIT & 1 CUBIC YARD 5/8" CRUSHED ROCK AT P01 5(48,5('723529,'(¶;¶:25.3,7 &8%,&<$5'2)6$1'$7M01 -REQUIRED TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL -REQUIRED TO PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS & TRENCH AT ALL TIMES -REQUIRED TO EXCAVATE & EXPOSE EXISTING PSE UG FACILITIES 48 HOURS PRIOR TO CONSTRUCTION -PSE INSPECTION IS REQUIRED PRIOR TO FINAL BACKFILL -PSE WILL NOT ENERGIZE FACILITIES UNTIL BACKFILL IS COMPLETE -RENTON CITY INSPECTION & APPROVAL IS REQUIRED 5 BUSINESS DAYS PRIOR TO CONNECTION OUTAGE LIST -16427 BENSON RD S, RENTON, WA 98055 - OLEG KALINICHENKO -16501 BENSON RD S, RENTON, WA 98055 - TEODOLFO C SAIREZ WIRE STRINGING PRIMARY & SECONDARY Location Pri Sec Wire Size & Type Quantity Length (per conductor)ToFromTo P01 P02 S 4/0 OH TPX 135 135 WIRE REMOVAL TABLE Location Wire Size & Type Quantity Length (per conductor) Remarks From To P01 P02 1/0 OH TPX 135 135 P01 P03 1/0 OH TPX 160 160 P02 M02 #2 OH TPX 60 60 E-Mail: Cell Phone: Project Manager Contact Information: Manager:DAVE HONEYSETT 253-245-0883 DAVE.HONEYSETT@PSE.COM METER DETAIL @ M01 SCALE: NONE 32" Typical 24" Min 24"-36" 4'Top View Electric & Joint Utility Work Pit Dimensions 36" Min Drainage Pipe 12" Minimum Clearance from Gas Service Lines Conduit Depth 24" to 36" Max Regulator Gas Meter Assembly 48" 4'8" Service (Permanent Detail:) Not to Scale Conduit Ends Closed 4'8" 24" Min 36" Typical 3' To Trench Property Line Conduit Stakes Customer Provided 3" Schedule 40 Grey PVC Power Cable Conduit Customer Provided Gas Service Line Conduit Sch 40 White PVC Customer Provided 3" Conduit Service Riser Customer Provided Elec. Mtr Base Elec Mtr utility provided Gas Meter Relief Vent Building Wall Elec. Mtr Vent Utility Provided Seal 24"-36"