Loading...
HomeMy WebLinkAboutP_Design_105078227_V1_1803123 N N 0 L 0 (10 O O U O 4` N 0 0 Nt 00 U N W 0 N r\ N N cQ 0 0 o 3 Z3 N I.0 U CL U a> w Y t O rn 0 N N 2w-,. 3j0)5 E� 12 1 V IrC�J 183 4�Or�0� S� 4�33R;� �T� I�E-'Jqwrll. Nil Ft E04PLA creE�MrE�T�E�R�Irl�� C�A�Irl�E�1�� ��� Wwrt�O NEW 6j00A.37 1�`�IrET�ER?IrN��r� CSA1.1N 9.Pr,-� �N D I N 5," 9,.�ALL ONENEW F,.1�I�1 1 ��Ir1���Hr C��Ir1�ET� LEGEND GENERAL SPECIFICATIONS Scope of Work Valley Medical Center @ 400 S 43rd ST, Renton, replace the old metering cabinet at grid 316418-165901 with two new 600A metering cabinets and install one new PMH11 switch cabinet (with 400A Fault Fiter fuses on the fused position). Customer Trenching - Customer to provide all trench, backfill, restoration, & tree removal. - Customer to provide high voltage cables & deadbreak elbows at metering cabinets for customer owned cables. General - All work is to be completed per PSE Standards & Practices. Copies of all PSE Standards are available upon request. - Work sites shall be kept clear of debris and all construction materials; equipment and packing shall be removed daily. - Return all unused and removed poles, transformers and hardware to PSE, storeroom. All copper shall be coiled and returned the day it is removed from the poles. Remove all unused pins and insulators. - Return all streetlights, area lights and floodlights to Sumner yard. Preconstruction - Notify appropriate city, County or DOT authorities 48 to 72 hours, or as required by permitting agency, in advance of starting work in Right-of-way involving a Permit. - All system switching shall be approved by System Operations (425-882-4652) a minimum of 48 hours in advance. - Notify customers of all outages 48 hours in advance. Work Drawings & Documents - Field design changes shall be approved by PSE Project Manager or Engineer. - Mark all field changes, equipment ID numbers and Underground cable information in red on Foreman's copy of worksketch. - Return one Foreman's copy of worksketch to Project Manager at completion of job. - When permits are required, a copy shall be available on work site at all times. Safety - Refer to PSE standards 6275.3000 and 6275.6000 for system ground requirements. - Refer to PSE standards 6275.9050 for personal protective grounding requirements. - Refer to PSE standards 6275.9150 for vehicle grounding and barricading requirements. - Proper line clearances shall be taken at the beginning, and released at the end, of each work day, or as otherwise instructed by the System Operator. - Provide signs, barricades, and traffic control in conformance with permit regulations. - Utilize flagging and other vehicle traffic control as necessary and in conformance with local traffic regulations. - Maintain traffic flow as required by permitting agency. Erosion & Sediment Control - Refer to PSE standards 0150.3200 for minimum requirements. - Comply with all requirements of permitting agency. - Installed erosion & sediment devices shall be maintained until vegetation has been re-established or disturbed soil has been otherwise permanently stabilized. Joint Facilities - Coordinate with Communication Companies for transfers. OVERHEAD CONSTRUCTION Poles & Structures - Poles are to be installed or relocated as staked. Unless otherwise noted, all pole location measurements are from the center of the pole. - All new poles set shall be the class indicated on the sketch, or better. Do not set a lower class pole than specified. - Install ground plate assembly on all new poles. Install Switch Ground Assembly per standard specification 6014.1000 at new gang operated switch locations. - Install grid numbers on all new and existing poles as shown on sketch. - Straighten existing poles as indicated or as necessary. - Treat all field -drilled poles with copper napthenate wood preservative. - Remove old poles after communication companies have transferred off and return to PSE storeroom. Fill and crown pole holes and restore area similar to adjacent landscaping. Conductors & Equipment - Transfer all overhead and underground primary, secondary and service conductors and guys to new poles set, unless otherwise indicated on this sketch. - Transfer existing transformers to new poles unless otherwise indicated on this sketch. - Use stirrups to connect all overhead and underground primary taps, and transformers above 25 kVA. Install at all sites being worked within the scope of the project where they are currently missing. - Use 397 AAC and Ampact connectors for all bare conductor feeder jumpers and 600 amp switch jumpers. Install tree wire conductor for jumpers on all poles that are double deadended with tree wire. - Apply grit inhibitor on all Ampact, stirrup, and dead-end connections. - Connect primary taps and transformers to same phase as existing unless otherwise shown on the drawing. - All neutral connections to be made with solid compression connectors. Connect all pole grounds to common neutral. - Use Load -interrupter cutouts (with arc shields) on all primary overhead and underground taps with fused protection above 40T. - Install Wildlife Protectors on all transformers. UNDERGROUND CONSTRUCTION - Trenching outside of the Right-of-way shall be of sufficient depth to provide a minimum of 36" of cover for primary conductors and 24" of cover for secondary conductors. - Road crossings and all trenches within the Right-of-way shall be of sufficient depth to provide a minimum of 36" of cover for all conductors or as required by the permitting Agency. - All conductors/conduits shall have a minimum of 3" of bed and 3" of clean sand cover. - No rocks larger than 6" shall be included in backfill. - Backfill in road crossings and within the Right-of-way shall be compacted to 95% density or as required by the permitting Agency. - Restore all excavated areas to original condition. - If four or more six inch conduits are installed in a trench, fluidized thermal backfill (FTB) shall be installed around the conduits to a depth of six inches above and to the sides of the conduit, and two inches underneath, per PSE Standard 6790.0140 . Vaults & Handholes - Refer to PSE standard 6775.0040 "Vault and Handhole Installation" - Vaults shall be placed level and 2" above final grade in landscaped areas and flush with final grade when placed in hard surface areas. - A minimum 6" bed of 5/8" crushed rock shall be placed under all vaults. - All conduit entrances shall be grouted. Conductors & Conduit - Refer to PSE standard 6800.6000 "PVC Conduit Installation". - Unless splices are called for, or otherwise noted or approved, conduit risers shall be plumbed directly to road crossing conduits. - Install insulating caps on all unused primary bushings. - All "spare" conduits shall be capped at each end. II t ilii• 30 3 OG.. 0 .. •..•••••a VV • • N : �... X3080•. Win 966111U.9009006 100T • ROL ••••. 3 30 ....., •.•o 100T 15 S ......:.... ..:..............� S 03237 100T'' — • 100T 30: —1 • VALLY X1531 • XC 1 ;30 : 'rl1 �p� MED CTR X1072 I •.ee••• 30 0e. ���[ X817 100T C �'� • /r• •• , • 1 OOT ..X6623 .... •3� •' U469 • • 30 J ,• •.• igoomm • 30 100T � S r ? % 1 ........~iti.......•••. .. -7g_30) �� X426 i ...•. S J • U2211� NOP 9 ' 22 3 • ,e• • • _ 30 .••••••••••••••e ,as • a 100T 0468 : *ease%�••• X11 0 5 • 'L • • • -... :...: Daemon* ss a :30. 'a••'' 3 :• 499 X82 • •Q.3 0 • 100T: s X385 'o- c :.Geo @Games..100T games message@** em 9606011111� -r 30 • OVERHEAD CIRCUIT MAP (BEFORE SCALE: 6" = 1/2 MILE NO ' L .Lr JOB SITE � NOW) i� t67) ■O N30.596966 6:8-10 — G Sam I • X1 100T e?. r,• X10395 082 �9 8 30 65T; •• A•l 1� S 30" a 3� 40T I B • 6869630 3 .. • • e • • • • X30800 • • 100T 100T:; 3� " ;�3 A ;'••. 30 ....., S • • U3237 10QT'' • 100 30' X153 VALLY :3 -4'l> >01 MED CTR X1072 "" o p) T X817 • • • IN, . V/ ;' 100T U469 NO • S one .30 ..... •••a v m NO - INOP WJ I•••a • 30 0468 S •;• s Go 100T S �. • ••�.• ' • • • •'' X1107 076311 •• NO , • • • • • • ......... ..•.•n•- :30: i 'a•••' 308@0 4990 is X82 ,' • 0Q.3 0 100T: s X385 'o- c .00 Go gas ;•i••i..�100T • • -LoseL a• • -r- -405 •sees*• • • • • • r ••• • ••Dei••• ROL C 100T 15 T � 1 ' I ^ 100T X6623 XC ''•'• 30 0 X426 1 iliIIIIIIIIIIIIIIIIII,100T NO Ga, 3� �00 -JOB SITE :�J NO(OO) . . ........ • 40T A -. 65T : A: •�.. ear • • • B•'' ,..: X8300 •: 000 • 40T • B OVERHEAD CIRCUIT MAP (AFTER SCALE: 6" = 1/2 MILE — moi+ EXIST. 10 WIRE — — — — k EXIST, 30 WIRE — — — EXISTING SECONDARY SERVICE LINE NEW TRENCH LINE EXISTING RIGHT OF WAY EXISTING PROPERTY LINE EXISTING CENTER LINE EXISTING CONDUCTOR TO BE REMOVED © PROPOSED PULL VAULT PROPOSED PADMOUNT TRANSFORMER D❑ EXISTING PADMOUNT TRANSFORMER PROPOSED TOTAL UNDERGROUND TRANSFORMER EXISTING TOTAL UNDERGROUND TRANSFORMER �J J -Box NEW POLE O EXISTING POLE I DISCONNECT - FUSED 0 DISCONNECT - UNFUSED D EXISTING UG RISER ► NEW UG RISER SVC STUB DOWN GUY EXISTING STREETLIGHT • HANDHOLE ® PRIMARY METERING POINT EROSION & SEDIMENT CONTROL REQUIREMENTS EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) FOREMAN (CHECK BOX WHEN COMPLETED) ❑ PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. ❑ Grid, Cable, and Switch numbers INSTALLED & VERIFIED. ❑ Field Changes RED -LINED on As -built. ❑ Material VERIFIED and CHANGES noted on Paperwork. ❑ Total PRIMARY Cable noted on As -built. ❑ Company ID#'s RECORDED in correct location on As -built. ❑ Indicate correct FUSE SIZE on As -built & VERIFY proper PHASE. ❑ Deviations noted on the As -built and their reason. ❑ I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. Foreman's Signature Print Name Date PROJECT PHASE NOTIF# ORDER# PWR Superior OH Expense UG Expense OH Expense UG Expense Removal 501891751 105078227 N/A 583.... N/A 584039304 N/A 593.... NIA 594.... N/A 108092738 No N/A RENTON 3 FUNCTION CONTACT CABLE TV 2 PHONE PROJECT MGR Luke Neely Vicinity Map Thomas Guide Page 686 Owner/ Developer Contact Info Valley Medical Center ATTN: Bob Kuzminsky 425-228-3440 x1250 office Sparling & Associates ATTN• Catherine Duvall 206-667-0535 office Project Manager Contact Information: Luke Neely For contacts below dial 1 -888 -CALL PSE (225-5773) 253-569-2523 Cell Phone CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG "Locates Required" e8 No THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES "Outages Required" es No REAL ESTATE/EASEMENT PERMIT "Flagging Required" Yes No N/A RENTON 3 FUNCTION CONTACT PHONE NO DATE 2 PROJECT MGR Luke Neely 253-569-2523 09/11/15 1 ENGR - POWER Luke Neely 253-569-2523 09/11/15 REV# DATE BY DESCRIPTION ENGR - GAS N/A N/A N/A COUNTY Emer Sect Gas Wk Ctr POWER WK CTR DRAWN BY Todd Zumwalt 253-234-6405 09-11-15 KING N/A N/A QCSOKE CHECKED BY 1/4 SEC OP MAP PLAT MAP APPROVED BY' NE31 T23 R05E N/A N/A FOREMAN #1 U -MAP NO (POWER) OH CKT MAP UG CKT MAP CIRCUIT NO FOREMAN #2 2305E121 2305E124 2305E121 VIC-18 IMAPPING JOINT FACILITIES ARRANGEMENTS UTILITIES N/A N/A N/A N/A N/A NIA N/A N/A CONTACT N/A NIA N/A N/A PHONE# PUGET 2305E121 VIC-18 400 S 43RD ST RENTON INCIDENT MAOP SOUNDOrder ENERGY INSTALL METERING CABS AND SWITCH @ VALLEY MEDICAL CNTR. 400 S 43RD ST, RENTON, WA Gas Order EIecN/A N/A 105078227 SCALE PAGE DESIGNED BY PSE AS NOTED 1 of 4 0) N N 0 L0 0 i D D U V) D V) 0 0 I U ^ N w L O N N N co O L0 0 0 3 N a i U U Q) W c Y t 0 7 Q. O I LO O N N U O N VALLEY MEDICAL CENTER ?1- '400' r S TO ROC SCALE; 199–,20 9 PSE PULL MH-PE2(EMPTY) VAULT / (2) 5" -SP / (2) 5"-A, EACH S TWO 1.5" IMC S T-ROO RACEWAYS SECURED 2000KVA / TO SIDE OF PAD / PAD UTB #1 CONTROL HIGH VOLTAGE / CABINET SWITCH RTE / MH PEI(PI) HIGH VOLTAGE EXISTING SWITCH #1 PRIMARY 316481 M0 HIGH VOLTAGE METER 165901 SWITCH #2 316417 M0 S (2) 4"-A v 165886 UTILITY TIEBREAKER #1 J / NEW METER CABINETSJ TELEPHO E 316418 J PEDESTA WO 165906 0469 NEW UTILITY PMH11 TIEBREAKER #2 PAD S 1 / 0468 316415 0 PMH11 165905 316412 165903 S l U76311 165886 0 J J PMH11 CUSTOMER TO REMOVE IP01 EXISTING TREES IN THIS AREA , ^ O- a Z "D' / 31641 J / 16591 I J "17930' J45kVA 316407 / J / 316406 277/480V 165921 165905 D / S43RDST i/ --- J SITE PLAN SCALE: 1" = 20' SITE SPECIFIC NOTES ORDER OF WORK CUSTOMER TO PROVIDE ALL TRENCH, BACKFILL, AND RESTORATION COMPLETE WORK ON SW03 AND PM02 FIRST AND ENERGIZE CUSTOMER COMPLETE WORK ON PM01 LAST AND ENERGIZE CUSTOMER PM01 316481-165901 INSTALL NEW 600 AMP PRIMARY METERING CABINET PER STD. 6056.5000 IN PLACE OF EXISTING METER CABINET PM02 316417-165886 INSTALL NEW 600 AMP PRIMARY METERING CABINET PER STD. 6056.5000 SW03 316413-165886 INSTALL NEW PMH11 SWITCH CABINET PER STD. 6056.1000 INSTALL 400 A FAULT FIGHTER FUSES PER STD. ON THE FUSED POSITION INSTALL SW# U76311 IP01 TO SW03: ROUTE NOP -26 2-6" CONDUITS AND CONDUCTORS FROM SW02 INTO SW03 SW02 TO SW03: INSTALL 2-6" AND PULL NEW 750 CABLES THROUGH ONE CONDUIT SW01 TO PM01: RE -PLUMB EXISTING 6" PVC INTO NEW 600A METER CABINET AFTER REMOVAL OF OLD METER CABINET PULL NEW 750 CABLES SW01 316418-165906 REPLACE EXISTING 1993 PMH -11 0469 WITH NEW PMH -11 WITH 400A FAULT FITER FUSES ON THE FUSED POSITION SAME AS EXIST PMH -11. SW03 TO PM02: INSTALL 1-6" PVC AND PULL NEW 750 CABLES Trench and backfill requirements for primary electric line extension trenches (No PSE gas) - A 12" layer of sand is required when excavated native material contains rocks up to 10" in diameter. - A 6" layer of sand is allowed when excavated native material contains rocks no larger than 8" in diameter. Excavated Dirt Pile ROADSIDE 32" Typical (Power, Gas, and 24" Min Final Grade Communications) 12" Min s Separation I_ I 36" Min Cover 48" Max 12" Min 4" Min Separation , Separatii Backfill (No rocks over 10" diameter) t 6" or 12" Min Sand Shading after Compaction 4" Sand Bedding Gas LP rimary Power Communications Cables or Conduit CUSTOMER PROVIDED TRENCH DETAIL Primary -Mainline Gas & Communications (NTS) CONDUIT DIAGRAM (BEFORE) SCALE: NONE PRIMARY CABLE & CONDUIT TABLE 1-6" (NEW) MO 24" (EXISTING) — MO 1-6" (NEW) J 24" (EXISTING) 1-6" (EXISTING) 3-6" (EXISTING) S 2-6" (EXISTING) 1-6" (EXISTING) 2-6" (NEW) O LADtY Z/cz� CONDUIT DIAGRAM (AFTER) SCALE: NONE 2-6" (NEW) 2-6" (EXISTING) 4-6" (EXISTING) 34" (EXISTING) LOCATION CONDUIT 2-6" (EXISTING) ASBUILT INFORMATION 1-6" (EXISTING) SIZE Qty LENGTH Design (ft) (in) BENDS PULL (Ibs) MO SWO Cable Numbers o 2-4" (EXISTING) S 90° 45° 22° 11' 1-6" (EXISTING) Manufacturer Compound Year Actual Amount Installed (Conduit & Cable) Wo 6" 2 33' 1 FOREMAN #1 S OH CKT MAP 2305E124 DB 750 53' J 51383 51384 EXISTING 316481 SW02 SW03 6" 2 30' 34" (EXISTING) 24" (EXISTING) PHONE# N/A N/A N/A N/A REMOVE PM01 750 70' EHD011 5 0 1-6" (EXISTING) SW01 PM01 1 0 LoQ 316481 Tx Tx 4'-2" Mtr Pri 12/600 3-6" (EXISTING) EHDO05 Z co PM01 165901 SW03 PM02 2-6" (EXISTING) 2 0 4-6" (EXISTING) CONDUIT DIAGRAM (BEFORE) SCALE: NONE PRIMARY CABLE & CONDUIT TABLE 1-6" (NEW) MO 24" (EXISTING) — MO 1-6" (NEW) J 24" (EXISTING) 1-6" (EXISTING) 3-6" (EXISTING) S 2-6" (EXISTING) 1-6" (EXISTING) 2-6" (NEW) O LADtY Z/cz� CONDUIT DIAGRAM (AFTER) SCALE: NONE 2-6" (NEW) 2-6" (EXISTING) 4-6" (EXISTING) 34" (EXISTING) LOCATION CONDUIT PRIMARY CABLE ASBUILT INFORMATION Type & Size SIZE Qty LENGTH Design (ft) (in) BENDS PULL (Ibs) PULL Rev (Ibs) Cable LENGTH Design (ft) Size Cable Numbers Please Record Foreman - Complete FROM TO 90° 45° 22° 11' A B C Manufacturer Compound Year Actual Amount Installed (Conduit & Cable) IP01 SW03 6" 2 33' 1 FOREMAN #1 U -MAP NO (POWER) 2305E121 OH CKT MAP 2305E124 DB 750 53' 51382 51383 51384 EXISTING 316481 SW02 SW03 6" 2 30' 2 N/A N/A N/A N/A PHONE# N/A N/A N/A N/A REMOVE PM01 750 70' EHD011 EHDO12 EHDO13 0 0 SW01 PM01 6" 1 12' 316481 Tx Tx 4'-2" Mtr Pri 12/600 750 52' EHDO05 EHD006 EHDO07 PM01 165901 SW03 PM02 6" 1 34' 2 0 750 74' EHD008 EHDO09 EHDO10 Vault & Equipment Table Site Grid Vault Size Type & Size Primary Bushings Transformer ASBUILT INFORMATION 1 Number & Cover Equipment BY DESCRIPTION ID Numbers Foreman -Complete COUNTY KING Emer Sect Gas Wk Ctr N/A N/A POWER WK CTR QCSOKE In Vault (Company ID) 1/4 SEC NE31 T23 R05E OP MAP N/A PLAT MAP N/A APPROVED BY FOREMAN #1 U -MAP NO (POWER) 2305E121 OH CKT MAP 2305E124 DB DC FOREMAN #2 MAPPING EXISTING 316481 4' -8"x4' -8"x3'-6 Mtr Pri 12/200 CONTACT N/A N/A N/A N/A PHONE# N/A N/A N/A N/A REMOVE PM01 165901 HH Matid:7663900 Type 1 Matid:9995611 0 0 316481 Tx Tx 4'-2" Mtr Pri 12/600 PM01 165901 HH Type 11 3 0 Matid:7917901 Matid:9995612 316417 TX Tx 4'-2" Mtr Pri 12/600 PM02 165886HH Type 11 3 0 Matid:7917901 Matid:9995612 316413 HH 5106 Sw PM Dist PMH11 SW03 165886 w/3' Sq and 5411x60" 3Sw 1 Fu 15kV 3 0 Matid:7906902 Matid:7833800 REAL ESTATE/EASEMENT PERMIT N/A RENTON 3 FUNCTION CONTACT PHONE NO DATE 2 PROJECT MGR Luke Neely 253-569-2523 09/11/15 1 ENGR - POWER Luke Neely 253-569-2523 09/11/15 REV# DATE BY DESCRIPTION ENGR - GAS N/A N/A N/A COUNTY KING Emer Sect Gas Wk Ctr N/A N/A POWER WK CTR QCSOKE DRAWN BY Todd Zumwalt 253-234-6405 09-11-15 CHECKED BY 014 1/4 SEC NE31 T23 R05E OP MAP N/A PLAT MAP N/A APPROVED BY FOREMAN #1 U -MAP NO (POWER) 2305E121 OH CKT MAP 2305E124 UG CKT MAP 2305E121 CIRCUIT NO VIC-18 FOREMAN #2 MAPPING JOINT FACILITIES ARRANGEMENTS UTILITIES N/A N/A N/A N/A CONTACT N/A N/A N/A N/A PHONE# N/A N/A N/A N/A INCIDENT MAOP SPUGU OUND 2305E121 VIC-18 400 S 43RD ST RENTON N/A N/A Gas Order Elect Order INSTALL METERING CABS AND SWITCH @ VALLEY MEDICAL CNTR. N/A 105078227 ENERGY 400 S 43RD ST, RENTON, WA SCALE PAGE DESIGNED BY PSE AS NOTED I 2 of 4 3 v N r\ 0 LO 0 0 0 U i V) 0 Cr v 0 0 d- ro I U N_ W 0 N r\ N N r\ 0 0 0 N a ri U U a> W Y t 0 C0 I 0 (N N Q- q) U) N 316410-166873 A051422 8051423 C051424 VIC 18 S 43RD ST 316399-165875 60kVA 120/240v BOUNK- 316422-166909 A051419 8051420 C051421 A051391 316418-165906 B051392 16418-165901 M 051393 0469 AOUNK BOUNK S❑ �'— RE 051387 316415-165905 U468 316412-166903 J A018049 B018050 C018051 316385-165903 26kVA 120/240v AOUNKO? A023046 - B023047 CO23048 I—f- 316379-165901 4 3X60kVA 120/208v AOABN 160 BOABN161 COABN 162 UNDERGROUND CIRCUIT MAP (BEFORE_ SCALE: 1" = 50' 26 A051382 8051383 C051384 100T X6623 A020076 B020077 CO20078 316464-166922 A025720 6025721 CO25722 A051388 B051389 C051390 A051403 B051420 C051405 316435-16 112.6kVA 1 / A051388 6051389 C051390 A030436 8030437 t C C030438 JOB SITE 316426-166917 A030433 B051993 B030434 co C030435 A018055 6018056 C018057 316419-165914 26kVA 120/240v A025740 B025741 CO25742 ;OL 15 A018055 B018056 C018057 316407-165921 46kVA 277/480v AO 1364 B01364 C01364 AO 13408 - B013409 - 0013410 - N NEW 750 E H DO05-AO EHDO06-BO EHDO07-CO NEW 750 E H DO08-AQP 316422-1 66809 A051388 BQ151389 CQ151390 316418 U469 165906 PMH11 S N.O. EHD009-BO � N.O. EHD010-CO 316418 3 316415 S 0468 I 1 PMH11 165905 J 2 I 316412 2 165903 S U76311 316413 N.O. PMH11 165886 AO EHDO05 NEW 750 I 3 I EHD011-Afd OP MAP N/A EHD012-Bfd 2 EHD013-CPJ VIC A018049 1$ B018050 C01 8051 UNDERGROUND CIRCUIT MAP (AFTER SCALE: 1" = 20' A051382 B051383 C051384 NOP 26 Vic 16 A051419 B051420 C051421 CO f. mo A018055 (ROL B01 8056 15 CQ118057 PMH 11 750 AI JKT 2 AO 51385 1 U468 BO 51386 2 CO 51387 3 316418 165906 --- 750 AI JKT 2 400A F.F. 3 --- PM01 1393 VIC-16 BO 51389 2 z AO 51388 1 1 750 Al JKT I I (VACANT) (N.O.) 1 4 SWITCH 0469 BEFORE NOT TO SCALE PMH 10 750 Al JKT AO 18049 VIC-18 BO 18050 CO 18051 CO 51384 NOP -26 BO 51383 AO 51382 750 Al JKT (N.O.) SW02 316415 165905 2 I 316418 3 2 I 1 I I 1 3 750 Al JKT2 2 I 1 2 I 3 3 1 I 3 AO EHDO05 U468 BO 51386 I 3 I I I 3 OP MAP N/A ( 2 2 2 U -MAP NO (POWER) 2305E121 OH CKT MAP 2305E124 1 1 3 1 I I 4 750 Al JKT AO 51385 BO 51386 0469 CO 51387 CO 18057 6018056 ROL-15 AO 18055 750 Al JKT (N.O.) SWITCH 0468 BEFORE NOT TO SCALE VIC-16 BQ151389 2 2 AO 51388 1 1 750 Al JKT I I (VACANT) (N.O.) 1 4 SWITCH 0469 AFTER NOT TO SCALE PMH 10 750 Al JKT AO 18049 BO 18050 j CO 18051 CO EHD013 BO EHD012 AO EHD011 750 Al JKT SW02 316415 165905 21 I 316418 2 I PMH 11 165906 3 750 Al JKT2 ENGR - POWER Luke Neely 253-569-2523 09/11/15 750 Al JKT I 3 AO 51385 1 I I 1 AO EHDO05 U468 BO 51386 2 I OP MAP N/A ( 2 BO EHDO06 PM01 FOREMAN #1 U -MAP NO (POWER) 2305E121 OH CKT MAP 2305E124 UG CKT MAP 2305E121 CO 51387 3 MAPPING JOINT FACILITIES ARRANGEMENTS 3 CO EHDO07 N/A N/A N/A N/A N/A N/A N/A NIA PHONE#N/A 400A F.F. INCIDENT MAOP PUGET SOUND 2305E121 VIC-18 400 S 43RD ST RENTON N/A N/A Gas Order Elect Order ENERGY INSTALL METERING CABS AND SWITCH @ VALLEY MEDICAL CNTR. N/A 105078227 400 S 43RD ST, RENTON, WA SCALE PAGE DESIGNED BY PSE AS NOTED 3 of 4 f,M =-1inn o I I VIC-16 BQ151389 2 2 AO 51388 1 1 750 Al JKT I I (VACANT) (N.O.) 1 4 SWITCH 0469 AFTER NOT TO SCALE PMH 10 750 Al JKT AO 18049 BO 18050 j CO 18051 CO EHD013 BO EHD012 AO EHD011 750 Al JKT SW02 316415 165905 21 I I 13 2 I I 2 3 3 ENGR - POWER Luke Neely 253-569-2523 09/11/15 REV# DATE I 3 I I 3 1 2ni 1 1 2 to 1 1 4 750 Al JKT AO 51385 BO 51386 U469 CO 51387 CO 18057 BO 18056 ROL-15 A0 18055 750 Al JKT (N.O.) SWITCH 0468 AFTER NOT TO SCALE SW03 316413 PMH 11 165886 (VACANT) 2 3 750 Al JKT 1 I I 1 AO EHDO08 2 I I 2 BO EHD009 PM02 3 3 CO EHD010 I 400A F.F. CO 51384 3 I I 3 CO EHD013 NOP -26 BO 51383 2 2 BO EHD012 U468 AO 51382 1 1 AO EHD011 750 Al JKT I I 750 Al JKT (N.O.) 1 4 SWITCH 076311 NEW NOT TO SCALE 6056.1000-6 Cn O 00 N N REAL ESTATE/EASEMENT PERMIT N/A RENTON 3 FUNCTION CONTACT PHONE NO DATE 2PROJECT MGR Luke Neely 253-569-2523 09/11/15 1 ENGR - POWER Luke Neely 253-569-2523 09/11/15 REV# DATE BY DESCRIPTION ENGR - GAS N/A N/A N/A COUNTY KING Emer Sect Gas Wk Ctr NIA N/A POWER WK CTR QCSOKE DRAWN BY Todd Zumwalt 253-234-6405 09-11-15 CHECKED BY 1/4 SEC NE31 T23 R05E OP MAP N/A PLAT MAP N/A APPROVED BY FOREMAN #1 U -MAP NO (POWER) 2305E121 OH CKT MAP 2305E124 UG CKT MAP 2305E121 CIRCUIT NO VIC-18 FOREMAN #2 MAPPING JOINT FACILITIES ARRANGEMENTS UTILITIES CONTACT N/A N/A N/A N/A N/A N/A N/A NIA PHONE#N/A N/A N/A N/A INCIDENT MAOP PUGET SOUND 2305E121 VIC-18 400 S 43RD ST RENTON N/A N/A Gas Order Elect Order ENERGY INSTALL METERING CABS AND SWITCH @ VALLEY MEDICAL CNTR. N/A 105078227 400 S 43RD ST, RENTON, WA SCALE PAGE DESIGNED BY PSE AS NOTED 3 of 4 PMH Padmount Switches SW03 U76311 I I Figure 1 Cable training (typical) (only two circuits shown with PMH 11 for clarity) Primary Padmount Meter Cabinets PM01 & PM02 ffT1711 I I I G Figure 4 12 kV, 600 Agrounding #2 Cu to Factory d Ground Bus Bar dted connector. V-2' of slack in y cables typically customer or supplied PMH Padmount Switches SW03 U76311 T Ie I i I I 4/0 Cu \, Neutral W 4/0 Ground Bus Vault Wall Attachment Detail / 5 36 00 Internal vault ground installed by vault manufacturer. Figure 2 Padmount switch grounding detail Primary Padmount Meter Cabinets PM01 & PM02 56" (12 kV 600A) 66" (34 kV 200A),, Cover 5740 Ibs Base 7200 Ibs 72" (12 kV 600A) 84" (34 kV 200A) i Internal vault ground \ installed by vault manufacturer 27 48" (12 kV 600A) 60" (34 kV 200A) Figure 3 12 kV 600 meter cabinet and vault 15 4/0 Cu Neutral 11,000 lbs SW03 076311 6'-2" 11'-4" Min\ � 11'-10" Max 5'-10" Min overall 6'-4" Max overall 16'-0" TOP VIEW 2" 10'-0" 6" CRUSHED ROCK Eon. T SIDE VIEW EXCAVATION - 50-1/2 CUBIC YARDS PMH PADMOUNT SWITCH AND EXCAVATION DETAIL NOT TO SCALE FOR PM01 & PM02 MID #7906902 Threaded Loadbreak Copper -top Reducing 600 A Bushing Connector Tap Plug (LRTP) Dust Cap Meter Cabinet ❑ ❑ ❑ El\ MID 7802800 (15 kV) and Extended stud MID 7806502 (34 kV) with short threads O into bushing i l' To ground bus r To ground bus I,. qc •,....J.'4�' .4' v�,� s,sem •"q� ,p5 Detail D 600 A T -OP II Elbow System Installed on a Meter Cabinet 8'-0" 81-0" or 10'-0" 4'-2" 06- TOP VIEW 2" --- 61' 7'-0" � � i � 7'-0.. Crushed 4'-6" Rock SIDE VIEW PM01 & PM02 Excavation - 20 cubic yards VAULT & EXCAVATION DETAIL Not to scale 6054.5000 SW03 076311 __ - - 1 24" MIN 10' MIN 10' MIN TOP VIEW PADMOUNT SWITCH 10' MIN 10' MIN ACCESS DOORS ACCESS DOORS 1811 �cco� 8 aRCR M I N CCCCCCCCRCCCCC i CCCCCCCCCCRCRO 0 0 VAULT LID --� i f 18" MIN PM SWITCH CLEAR WORKING SPACE NOT TO SCALE REAL ESTATE/EASEMENT PERMIT N/A RENTON 3 FUNCTION CONTACT PHONE NO DATE 2 PROJECT MGR Luke Neely 253-569-2523 09/11/15 1 ENGR - POWER Luke Neely 253-569-2523 09/11/15 REV# DATE BY DESCRIPTION ENGR - GAS N/A N/A N/A COUNTY KING Emer Sect N/A Gas Wk Ctr N/A POWER WK CTR QCSOKE DRAWN BY Todd Zumwalt 253-234-6405 09-11-15 CHECKED BY 1/4 SEC NE31 T23 R05E OP MAP N/A PLAT MAP N/A APPROVED BY FOREMAN #1 U -MAP NO (POWER) 2305E121 OH CKT MAP 2305E124 JUG CKT MAP 2305E121 CIRCUIT NO VIC-18 IMAPPING FOREMAN #2 JOINT FACILITIES ARRANGEMENTS UTILITIES CONTACT PHONE# N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A INCIDENT • MAOP SPUGET OUND 2305E121 VIC-18 400 S 43RD ST RENTON N/A N/A Gas Order Elect Order INSTALL METERING CABS AND SWITCH @ VALLEY MEDICAL CNTR. N/A 105078227 ENERGY 400 S 43RD ST, RENTON, WA SCALE PAGE DESIGNED BY PSE AS NOTED I 4 of 4