HomeMy WebLinkAboutMFP18001604DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP18001604
IVR Number: 18001604
Permit Informaon
Permit Name:Puget Sound Energy - Electric
Address/Locaon :03/30/2018Application Date:0323059154Parcel Number:5130 NE 12TH ST
Permit Type:04/04/2018Issue Date:Franchise
Permit Work Class:04/04/2019Expiration Date:Minor Utility
Job Number:105088050Franchise Type:Electric
Description:Upgrade OH transformer and install UG electric service to '5130'. No pavement cuts anticipated. Restoration per City
of Renton standards.
Contacts
Name Address PhoneTypeBilling
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Applicant
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: BL.005109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Puget Sound Energy - Electric
105088050
Anish Kumar
253-208-2183
anish.kumar@pse.com
5130 NE 12th St 105088050
Occupying W bound lane of NE 12th St for crew to upgrade OH transformer and
install UG electric service to '5130'. No pavement cuts anticipated. Restoration per City of
Renton standards.
80'x1'x4'
Potelco Inc.253-208-2183
BL005109 Poteli*227PL
3/28/2018
MFP18001604
Scott Warlick 3/30/2018
Holly Powers 4/4/2018
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
Reset FormPrint Form
105088050 Chateau Meridian
PSE/Potelco Inc.
Russell Page 253-245-0192
6905 S 228th St, Kent, WA 98032
russell.page@pse.com
5130 NE 12th St
TBD
3/28/2018
Anish Kumar 3/28/2018
MFP18001604
Scott Warlick
4/4/2018
8:00AM - 3:30PM
Monday - Friday
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
12.512.5
99NE 12TH STP01STOP
FLAGGER
100'W20-7AB
E
P
R
E
P
A
R
E
D
T
O
S
T
O
P
W3-4100'ROADWORKAHEADW20-1 100'STOPFLAGGERW20-7A100'200'ROADWORKAHEADW20-1 200'ROADWORKAHEADW20-110102010FROM TO
TOW AWAY AREA
PHONE 888-9999
INFRASOURCE LLC 000 0000000
NO PARKING
FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGRESIDENT(S) WILL BEINFORMED OF POSSIBLETEMPORARY DRIVEWAYCLOSURE5130HOQUIAM AVE NE
Job#1050880505130 NE 12TH ST, RENTON, WAMarch 19, 2018Sheet 1 of 1 gregory.harwood@pse.com(425) 424-6425NPSEPUGETSOUNDENERGY28" TRAFFIC CONELEGENDTRAFFIC FLOWWORK VEHICLESIGN LOCATIONWARNING FLAGFLAGGERSTOPPOLETRAFFIC MANAGEMENT, INC.www.trafficmanagement.comC31 # 785804800.763.3999Traffic Control Services - Sales & RentalsPermits & Consulting - Engineering - TrainingPLAN PREPARED BY:DATE: 3/19/2018 - RNPLAN ORDER: 34778TMI CONTACT PERSON: Michael FlanaganTCS CERT #: 301872CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040MINIMUM TAPER LENGTH = L (feet)LANEWIDTHSPOSTED SPEED LIMITS20253035404510111255 +60/6545/5535/403025SIGN SPACING"X"800500'350'200'100'Notes:1.All signs and spacing to conform to the MUTCD and City of RENTONstandards.2.All sidewalks, driveways, exits and egresses shall be completely clear unlessotherwise indicated.3.Channelizing devices are 28" traffic cones.4.Sign size can be a minimum of 48" x 48" and shall not obstruct pedestrianaccess.5.Crew is required to leave a minimum of 11' for traveling lane width.6.Alert affected residents and businesses.7.Work to take place between 9 a.m. and 4 p.m.8.Contractor shall post temp "NO PARKING" 72 hours prior to construction.9.Work area will be 192' ECL of HOQUIAM AVE NE & 20' NCL of NE 12TH ST.MFP18001604
ROW
63'
318628-167454
MAP
16
NEW
"5130"
318632-167470
25 kVA 120/240V (A)
37.5 kVA 120/240V (A)
318628-167474
T16/5
A
NE 12TH STHOQUIAM AVE NE318634-167455
318641-167455
SLAT4903
#4ACSR (AN)#2ACSR (A)1228
5118
1227
5105 5111
5117
5125 5131 5203 5209
5208520251245118
51125106
5104
JOB SITE
A 90°
±80'
±70'
-CUSTOMER TO
PROVIDE 4'X4' WORK
PIT & 3/4" YARD SAND
-CUSTOMER TO PROVIDE
4'X4' WORK PIT & 1 YARD
5/8" CRUSHED ROCK
-CUSTOMER TO INSTALL 1-3"
SCH'L 80 CONDUIT FROM P01-A,
±80'
-PSE TO INSTALL 1-RUN OF
350KCMIL UG TPX, ±190'
-CUSTOMER TO INSTALL 1-3"
SCH'L 40 CONDUIT FROM A-M01,
±70'
JOB SITE
SITE PLAN
POWER GENERAL NOTES - RESIDENTIAL PROJECT
N
Vicinity Map
Owner / Developer Contact Info
officeATTN:
CHATEAU MERIDIAN
P.O. BOX 6490
KENT, WA 98064
STEVE WONG 206-941-8828
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILESCALE: NONE
CIRCUIT ONE-LINE DIAGRAM
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
MAP-16
2017
183 228 212
1.61 --
184.61 228 212
TRF Removal
Perm. Service
Superior
ORDER#NOTIF#
PWR
PROJECT PHASE
104301742505674345
583058923
CABLE TV
PHONE
GAS
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
10.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Inclement weather conditions may cause delays in construction times and dates.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
8.
9.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:RUSSELL PAGE
253-245-0192
RUSSELL.PAGE@PSE.COM
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
Installed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER INSTALLATION
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
P01
318632-167470
37.5KVA
6211300
SCALE: 1" = 50'105088050THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
105088050
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
RUSSELL PAGE 253-245-0192 3/13/18
RUSSELL PAGE 253-245-0192 3/13/18
N/A N/A N/A
TIN NGUYEN 253-244-4303 3/13/18
REQUIRED RENTON
CHATEAU MERIDIAN
OH-UG SVC W/ TRF UPGRADE
5130 NE 12TH ST, RENTON WA 98059
N/A N/A
N/A 105088050
AS NOTED 1/1
KING N/A N/A CSPSKEIN
SE 3-23N-05E N/A N/A
2305E012 2305E040 2305E012 MAP-16
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
505393548
SITE SPECIFIC NOTES
P01 (318632-167470):
-EXISTING DISTRIBUTION POLE TO REMAIN
-REMOVE EXISTING 25KVA OH TRF
-INSTALL 37.5KVA 120/240V OH TRF W/ L/B & FUSE @ 15T PER STD 6025.1000 (TRFPXF)
-INSTALL 1-3" CONDUIT RISER TO EXISTING S/O BRKT PER STD 6042.1000 (RIS3CSS)
CUSTOMER DEVELOPEMENT NOTES
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION &
RESTORATION PER PUGET SOUND ENERGY STANDARDS.#6750.6500
** DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL **
-REQUIRED TO PROVIDE A 4' X 4' WORK PIT & 1 YARD OF 5/8" CRUSHED ROCK AT P01.
-REQUIRED TO PROVIDE A TRENCH AND INSTALL
OF 1-3" SCH'L 80 GREY PVC
DISCONTINUOUS CONDUIT FROM P01 TO A.
-REQUIRED TO PROVIDE A TRENCH AND INSTALL
OF 1-3" SCH'L 40 GREY PVC
DISCONTINUOUS CONDUIT FROM A TO M01.
-REQUIRED TO PROVIDE A 4' X 4' PIT & 3/4 YARD OF SAND AT M01.
-REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL OF THE CONDUITS.
-CUSTOMER IS REQUIRED TO PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS &
TRENCH AT ALL TIMES.
-CUSTOMER IS REQUIRED TO EXCAVATE & EXPOSE EXISTING PSE UG FACILITIES 5 DAYS PRIOR
TO CONSTRUCTION.
-PSE INSPECTION IS REQUIRED PRIOR TO FINAL BACKFILL (PSE WILL NOT ENERGIZE FACILITIES
UNTIL BACKFILL IS COMPLETE).
ALL TRENCHING WILL REQ AN INSPECTION BY PSE BEFORE FINAL BACKFILL
ALL TRENCH AND L&I INSPECTION MUST BE COMPLETED 5 DAY PRIOR TO CONSTRUCTION.
Removed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER REMOVAL
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
P01
318632-167470
25KVA
SECONDARY CABLE & CONDUIT TABLE
LOCATION CABLE Assumed
Lot Corner
CONDUIT VOLTAGE
DROP
VOLTAGE
FLICKER ASBUILT INFORMATION
SIZE LENGTH
Design
(ft)
SIZE LENGTH
Design
(ft)
BENDS
Foreman - Complete
FROM TO (1/0,4/0,350)to Meter(ft)(in)90°45°22°11°(Percent)(Percent)Actual Amount Installed (Conduit & Cable)
P01 A 350 190
3" SCH'L
80 80 1.8%3.6%
A M01
3" SCH'L
40 70 1
TV & TEL Electric Service Cable in Conduit
3" Schedule 40 Grey PVC
Excavated Dirt Pile
Final Grade
24" Min
24" Min
to
36" Max
Cover Separation
12" Min
20" Min
JOINT TRENCH DETAIL
Electric Service Cable in Conduit (NTS)
To Excavated Dirt Pile
36" MINIMUM COVER
IN RIGHT OF WAY
Backfill for Conduit
Free of rocks
larger than 8"
in diameter)
Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris,
glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.
FLOW DIRECTION
LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL,
SECURE WITH PEA GRAVEL BAGS (MID 9995692).
6'
3'
8"
TECHNIQUES FOR EROSION AND SEDIMENT CONTROL
FILTER FENCE DETAIL
Not to Scale 0150.3200
32"
Typical
24"
Min
24"-36"
24"-36"
4'Top View
Electric & Joint Utility
Work Pit Dimensions
36"
Min
Drainage Pipe
12" Minimum Clearance
from Gas Service Lines
Conduit Depth
24" to 36" Max
Regulator Vent
Gas Meter Assembly
Utility Provided
48"
4'8"
Service (Permanent Detail:)
Not to Scale
Seal
Conduit
Ends
Closed
4'8"
24" Min
36" Typical
3'
To Trench
Property Line
Conduit Stakes
Customer Provided
3" Schedule 80 Grey PVC
Power Cable Conduit
Customer Provided
Gas Service Line Conduit
Sch 40 White PVC
Customer Provided
3" Conduit Service Riser
Customer Provided
Elec. Mtr Base
Elec Mtr
utility provided
Gas Meter
Relief Vent
Building Wall
Elec. Mtr
PERMANENT METER DETAIL AT M01
SCALE: NONE
Standoff Bracket
15" Min Length
Conduit Clamp
Conduit Field Face
Quadrant
Climbing
Space
Road Face
Quadrant
Climbing
Space
5" Min
CL LCDirection of Vehicular Traffic
CONDUIT RISER PLACEMENT DETAIL
TOP VIEW
Not to Scale
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
3700 SQ.
320 AMPS
GAS
11 KW
140 A
1.8%
3.6%
CIRCUIT FEET ADDED: 0'
SCHEDULE: 27
MFP18001604