Loading...
HomeMy WebLinkAboutP_Design_105088050_V1_180328ROW 63' 318628-167454 MAP 16 NEW "5130" 318632-167470 25 kVA 120/240V (A) 37.5 kVA 120/240V (A) 318628-167474 T16/5 A NE 12TH STHOQUIAM AVE NE318634-167455 318641-167455 SLAT4903 #4ACSR (AN)#2ACSR (A)1228 5118 1227 5105 5111 5117 5125 5131 5203 5209 5208520251245118 51125106 5104 JOB SITE A 90° ±80' ±70' -CUSTOMER TO PROVIDE 4'X4' WORK PIT & 3/4" YARD SAND -CUSTOMER TO PROVIDE 4'X4' WORK PIT & 1 YARD 5/8" CRUSHED ROCK -CUSTOMER TO INSTALL 1-3" SCH'L 80 CONDUIT FROM P01-A, ±80' -PSE TO INSTALL 1-RUN OF 350KCMIL UG TPX, ±190' -CUSTOMER TO INSTALL 1-3" SCH'L 40 CONDUIT FROM A-M01, ±70' JOB SITE SITE PLAN POWER GENERAL NOTES - RESIDENTIAL PROJECT N Vicinity Map Owner / Developer Contact Info officeATTN: CHATEAU MERIDIAN P.O. BOX 6490 KENT, WA 98064 STEVE WONG 206-941-8828 OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILESCALE: NONE CIRCUIT ONE-LINE DIAGRAM ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE MAP-16 2017 183 228 212 1.61 -- 184.61 228 212 TRF Removal Perm. Service Superior ORDER#NOTIF# PWR PROJECT PHASE 104301742505674345 583058923 CABLE TV PHONE GAS FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. 10. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Inclement weather conditions may cause delays in construction times and dates. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 8. 9. E-Mail: Cell Phone: Project Manager Contact Information: Manager:RUSSELL PAGE 253-245-0192 RUSSELL.PAGE@PSE.COM PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: P01 318632-167470 37.5KVA 6211300 SCALE: 1" = 50'105088050THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) 105088050 UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP RUSSELL PAGE 253-245-0192 3/13/18 RUSSELL PAGE 253-245-0192 3/13/18 N/A N/A N/A TIN NGUYEN 253-244-4303 3/13/18 REQUIRED RENTON CHATEAU MERIDIAN OH-UG SVC W/ TRF UPGRADE 5130 NE 12TH ST, RENTON WA 98059 N/A N/A N/A 105088050 AS NOTED 1/1 KING N/A N/A CSPSKEIN SE 3-23N-05E N/A N/A 2305E012 2305E040 2305E012 MAP-16 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 505393548 SITE SPECIFIC NOTES P01 (318632-167470): -EXISTING DISTRIBUTION POLE TO REMAIN -REMOVE EXISTING 25KVA OH TRF -INSTALL 37.5KVA 120/240V OH TRF W/ L/B & FUSE @ 15T PER STD 6025.1000 (TRFPXF) -INSTALL 1-3" CONDUIT RISER TO EXISTING S/O BRKT PER STD 6042.1000 (RIS3CSS) CUSTOMER DEVELOPEMENT NOTES CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS.#6750.6500 ** DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL ** -REQUIRED TO PROVIDE A 4' X 4' WORK PIT & 1 YARD OF 5/8" CRUSHED ROCK AT P01. -REQUIRED TO PROVIDE A TRENCH AND INSTALL “ OF 1-3" SCH'L 80 GREY PVC DISCONTINUOUS CONDUIT FROM P01 TO A. -REQUIRED TO PROVIDE A TRENCH AND INSTALL “ OF 1-3" SCH'L 40 GREY PVC DISCONTINUOUS CONDUIT FROM A TO M01. -REQUIRED TO PROVIDE A 4' X 4' PIT & 3/4 YARD OF SAND AT M01. -REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL OF THE CONDUITS. -CUSTOMER IS REQUIRED TO PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS & TRENCH AT ALL TIMES. -CUSTOMER IS REQUIRED TO EXCAVATE & EXPOSE EXISTING PSE UG FACILITIES 5 DAYS PRIOR TO CONSTRUCTION. -PSE INSPECTION IS REQUIRED PRIOR TO FINAL BACKFILL (PSE WILL NOT ENERGIZE FACILITIES UNTIL BACKFILL IS COMPLETE). ALL TRENCHING WILL REQ AN INSPECTION BY PSE BEFORE FINAL BACKFILL ALL TRENCH AND L&I INSPECTION MUST BE COMPLETED 5 DAY PRIOR TO CONSTRUCTION. Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P01 318632-167470 25KVA SECONDARY CABLE & CONDUIT TABLE LOCATION CABLE Assumed Lot Corner CONDUIT VOLTAGE DROP VOLTAGE FLICKER ASBUILT INFORMATION SIZE LENGTH Design (ft) SIZE LENGTH Design (ft) BENDS Foreman - Complete FROM TO (1/0,4/0,350)to Meter(ft)(in)90°45°22°11°(Percent)(Percent)Actual Amount Installed (Conduit & Cable) P01 A 350 190 3" SCH'L 80 80 1.8%3.6% A M01 3" SCH'L 40 70 1 TV & TEL Electric Service Cable in Conduit 3" Schedule 40 Grey PVC Excavated Dirt Pile Final Grade 24" Min 24" Min to 36" Max Cover Separation 12" Min 20" Min JOINT TRENCH DETAIL Electric Service Cable in Conduit (NTS) To Excavated Dirt Pile 36" MINIMUM COVER IN RIGHT OF WAY Backfill for Conduit Free of rocks larger than 8" in diameter) Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter. FLOW DIRECTION LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS (MID 9995692). 6' 3' 8" TECHNIQUES FOR EROSION AND SEDIMENT CONTROL FILTER FENCE DETAIL Not to Scale 0150.3200 32" Typical 24" Min 24"-36" 24"-36" 4'Top View Electric & Joint Utility Work Pit Dimensions 36" Min Drainage Pipe 12" Minimum Clearance from Gas Service Lines Conduit Depth 24" to 36" Max Regulator Vent Gas Meter Assembly Utility Provided 48" 4'8" Service (Permanent Detail:) Not to Scale Seal Conduit Ends Closed 4'8" 24" Min 36" Typical 3' To Trench Property Line Conduit Stakes Customer Provided 3" Schedule 80 Grey PVC Power Cable Conduit Customer Provided Gas Service Line Conduit Sch 40 White PVC Customer Provided 3" Conduit Service Riser Customer Provided Elec. Mtr Base Elec Mtr utility provided Gas Meter Relief Vent Building Wall Elec. Mtr PERMANENT METER DETAIL AT M01 SCALE: NONE Standoff Bracket 15" Min Length Conduit Clamp Conduit Field Face Quadrant Climbing Space Road Face Quadrant Climbing Space 5" Min CL LCDirection of Vehicular Traffic CONDUIT RISER PLACEMENT DETAIL TOP VIEW Not to Scale LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 3700 SQ. 320 AMPS GAS 11 KW 140 A 1.8% 3.6% CIRCUIT FEET ADDED: 0' SCHEDULE: 27