HomeMy WebLinkAboutP_Design_105088050_V1_180328ROW
63'
318628-167454
MAP
16
NEW
"5130"
318632-167470
25 kVA 120/240V (A)
37.5 kVA 120/240V (A)
318628-167474
T16/5
A
NE 12TH STHOQUIAM AVE NE318634-167455
318641-167455
SLAT4903
#4ACSR (AN)#2ACSR (A)1228
5118
1227
5105 5111
5117
5125 5131 5203 5209
5208520251245118
51125106
5104
JOB SITE
A 90°
±80'
±70'
-CUSTOMER TO
PROVIDE 4'X4' WORK
PIT & 3/4" YARD SAND
-CUSTOMER TO PROVIDE
4'X4' WORK PIT & 1 YARD
5/8" CRUSHED ROCK
-CUSTOMER TO INSTALL 1-3"
SCH'L 80 CONDUIT FROM P01-A,
±80'
-PSE TO INSTALL 1-RUN OF
350KCMIL UG TPX, ±190'
-CUSTOMER TO INSTALL 1-3"
SCH'L 40 CONDUIT FROM A-M01,
±70'
JOB SITE
SITE PLAN
POWER GENERAL NOTES - RESIDENTIAL PROJECT
N
Vicinity Map
Owner / Developer Contact Info
officeATTN:
CHATEAU MERIDIAN
P.O. BOX 6490
KENT, WA 98064
STEVE WONG 206-941-8828
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILESCALE: NONE
CIRCUIT ONE-LINE DIAGRAM
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
MAP-16
2017
183 228 212
1.61 --
184.61 228 212
TRF Removal
Perm. Service
Superior
ORDER#NOTIF#
PWR
PROJECT PHASE
104301742505674345
583058923
CABLE TV
PHONE
GAS
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
10.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Inclement weather conditions may cause delays in construction times and dates.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
8.
9.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:RUSSELL PAGE
253-245-0192
RUSSELL.PAGE@PSE.COM
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
Installed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER INSTALLATION
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
P01
318632-167470
37.5KVA
6211300
SCALE: 1" = 50'105088050THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
105088050
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
RUSSELL PAGE 253-245-0192 3/13/18
RUSSELL PAGE 253-245-0192 3/13/18
N/A N/A N/A
TIN NGUYEN 253-244-4303 3/13/18
REQUIRED RENTON
CHATEAU MERIDIAN
OH-UG SVC W/ TRF UPGRADE
5130 NE 12TH ST, RENTON WA 98059
N/A N/A
N/A 105088050
AS NOTED 1/1
KING N/A N/A CSPSKEIN
SE 3-23N-05E N/A N/A
2305E012 2305E040 2305E012 MAP-16
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
505393548
SITE SPECIFIC NOTES
P01 (318632-167470):
-EXISTING DISTRIBUTION POLE TO REMAIN
-REMOVE EXISTING 25KVA OH TRF
-INSTALL 37.5KVA 120/240V OH TRF W/ L/B & FUSE @ 15T PER STD 6025.1000 (TRFPXF)
-INSTALL 1-3" CONDUIT RISER TO EXISTING S/O BRKT PER STD 6042.1000 (RIS3CSS)
CUSTOMER DEVELOPEMENT NOTES
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION &
RESTORATION PER PUGET SOUND ENERGY STANDARDS.#6750.6500
** DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL **
-REQUIRED TO PROVIDE A 4' X 4' WORK PIT & 1 YARD OF 5/8" CRUSHED ROCK AT P01.
-REQUIRED TO PROVIDE A TRENCH AND INSTALL
OF 1-3" SCH'L 80 GREY PVC
DISCONTINUOUS CONDUIT FROM P01 TO A.
-REQUIRED TO PROVIDE A TRENCH AND INSTALL
OF 1-3" SCH'L 40 GREY PVC
DISCONTINUOUS CONDUIT FROM A TO M01.
-REQUIRED TO PROVIDE A 4' X 4' PIT & 3/4 YARD OF SAND AT M01.
-REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL OF THE CONDUITS.
-CUSTOMER IS REQUIRED TO PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS &
TRENCH AT ALL TIMES.
-CUSTOMER IS REQUIRED TO EXCAVATE & EXPOSE EXISTING PSE UG FACILITIES 5 DAYS PRIOR
TO CONSTRUCTION.
-PSE INSPECTION IS REQUIRED PRIOR TO FINAL BACKFILL (PSE WILL NOT ENERGIZE FACILITIES
UNTIL BACKFILL IS COMPLETE).
ALL TRENCHING WILL REQ AN INSPECTION BY PSE BEFORE FINAL BACKFILL
ALL TRENCH AND L&I INSPECTION MUST BE COMPLETED 5 DAY PRIOR TO CONSTRUCTION.
Removed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER REMOVAL
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
P01
318632-167470
25KVA
SECONDARY CABLE & CONDUIT TABLE
LOCATION CABLE Assumed
Lot Corner
CONDUIT VOLTAGE
DROP
VOLTAGE
FLICKER ASBUILT INFORMATION
SIZE LENGTH
Design
(ft)
SIZE LENGTH
Design
(ft)
BENDS
Foreman - Complete
FROM TO (1/0,4/0,350)to Meter(ft)(in)90°45°22°11°(Percent)(Percent)Actual Amount Installed (Conduit & Cable)
P01 A 350 190
3" SCH'L
80 80 1.8%3.6%
A M01
3" SCH'L
40 70 1
TV & TEL Electric Service Cable in Conduit
3" Schedule 40 Grey PVC
Excavated Dirt Pile
Final Grade
24" Min
24" Min
to
36" Max
Cover Separation
12" Min
20" Min
JOINT TRENCH DETAIL
Electric Service Cable in Conduit (NTS)
To Excavated Dirt Pile
36" MINIMUM COVER
IN RIGHT OF WAY
Backfill for Conduit
Free of rocks
larger than 8"
in diameter)
Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris,
glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.
FLOW DIRECTION
LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL,
SECURE WITH PEA GRAVEL BAGS (MID 9995692).
6'
3'
8"
TECHNIQUES FOR EROSION AND SEDIMENT CONTROL
FILTER FENCE DETAIL
Not to Scale 0150.3200
32"
Typical
24"
Min
24"-36"
24"-36"
4'Top View
Electric & Joint Utility
Work Pit Dimensions
36"
Min
Drainage Pipe
12" Minimum Clearance
from Gas Service Lines
Conduit Depth
24" to 36" Max
Regulator Vent
Gas Meter Assembly
Utility Provided
48"
4'8"
Service (Permanent Detail:)
Not to Scale
Seal
Conduit
Ends
Closed
4'8"
24" Min
36" Typical
3'
To Trench
Property Line
Conduit Stakes
Customer Provided
3" Schedule 80 Grey PVC
Power Cable Conduit
Customer Provided
Gas Service Line Conduit
Sch 40 White PVC
Customer Provided
3" Conduit Service Riser
Customer Provided
Elec. Mtr Base
Elec Mtr
utility provided
Gas Meter
Relief Vent
Building Wall
Elec. Mtr
PERMANENT METER DETAIL AT M01
SCALE: NONE
Standoff Bracket
15" Min Length
Conduit Clamp
Conduit Field Face
Quadrant
Climbing
Space
Road Face
Quadrant
Climbing
Space
5" Min
CL LCDirection of Vehicular Traffic
CONDUIT RISER PLACEMENT DETAIL
TOP VIEW
Not to Scale
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
3700 SQ.
320 AMPS
GAS
11 KW
140 A
1.8%
3.6%
CIRCUIT FEET ADDED: 0'
SCHEDULE: 27