Franchise Permit: MFP18001623
IVR Number: 18001623
Permit Informaon
Permit Name:Puget Sound Energy - Electric
Address/Locaon :03/30/2018Application Date:1253810010Parcel Number:3401 LIND AVE SW
Permit Type:04/04/2018Issue Date:Franchise
Permit Work Class:04/04/2019Expiration Date:Minor Utility
Job Number:105087408Franchise Type:Electric
Description:Install new padmount transformer for cell site. Vault is just outside ROW but crew may need to set up in ROW. No
pavement cuts anticipated. Restoration per City of Renton standards.
Contacts
Name Address PhoneTypeBilling
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Applicant
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: BL.005109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Puget Sound Energy - Electric
105087408
Anish Kumar
253-208-2183
anish.kumar@pse.com
3401 Lind Ave SW 98005 Verizon Sea Reliable
Occupying E bound lane of SW 34th St for crew to install new padmount
transformer for cell site. Vault is just outside ROW but crew may need to set up in ROW. No
pavement cuts anticipated. Restoration per City of Renton standards.
Potelco Inc.253-208-2183
BL005109 Poteli*227PL
3/30/2018
Scott Warlick 4/2/2018
MFP18001623
Holly Powers 4/4/2018
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
Reset FormPrint Form
105087408 Verizon Sea Reliable
PSE/Potelco Inc.
Nicholas Lanier 253-266-4957
6905 S 228th St, Kent, WA 98032
nicholas.lanier@pse.com
3401 Lind Ave SW
TBD
4/16/18
Anish Kumar 3/30/2018
MFP18001623
Scott Warlick
4/4/2018
8:00AM - 3:30PM
Monday - Friday
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
VaultSW 34TH ST3401121211111111121111ARRW-BRD FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGW4-2RRIGHT LANECLOSEDAHEADW20-5RROADWORKAHEADW20-1ROAD
WORK
AHEAD W20-1100'100'100'100'BUSINESSES(S) WILL BEINFORMED OF POSSIBLETEMPORARY DRIVEWAYCLOSUREJob#1050874083401 LIND AVE SW, RENTON, WAJanuary 22, 2018Sheet 1 of 1 gregory.harwood@pse.com(425) 424-6425NPSEPUGETSOUNDENERGYBORE PIT28" TRAFFIC CONELEGENDTRAFFIC FLOWWORK VEHICLESIGN LOCATIONWARNING FLAGFLAGGERSTOPTRAFFIC MANAGEMENT, INC.www.trafficmanagement.comC31 # 785804800.763.3999Traffic Control Services - Sales & RentalsPermits & Consulting - Engineering - TrainingPLAN PREPARED BY:DATE: 1/22/2018-CSPLAN ORDER: 32414TMI CONTACT PERSON: Michael FlanaganTCS CERT #: 301872CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040MINIMUM TAPER LENGTH = L (feet)LANEWIDTHSPOSTED SPEED LIMITS20253035404510111255 +60/6545/5535/403025SIGN SPACING"X"800500'350'200'100'VICINITY MAPNotes:1.All signs and spacing to conform to the MUTCD and City of RENTONstandards.2.All sidewalks, driveways, exits and egresses shall be completely clearunless otherwise indicated.3.Channelizing devices are 28" traffic cones.4.Sign size can be a minimum of 48" x 48" and shall not obstruct pedestrianaccess.5.Crew is required to leave a minimum of 11' for traveling lane width.6.Alert affected residents and businesses.7.Work to take place between 9 a.m. and 4 p.m.8.Work area will be 45' SCL of SW 34TH ST & 465' WCL of LIND AVE SW.4201MFP18001623
CUSTOMER SUPPLIED
4' X 4' WORK PIT
1-2" DB-120 DISCONTINUOUS PVC CONDUIT ± 20'
INST. 1-RUN 1/0 UG PRI CABLE ± 40' (CØXXXXXX)
CUSTOMER SUPPLIED
6' X 6' WORK PIT
2/3 CUBIC YARDS OF 6” CRUSHED ROCK
CUSTOMER SUPPLIED
NEW CØXXXXX
SITE PLAN
N
Vicinity Map
N/A
Owner / Developer Contact Info
officeATTN:
VERIZON WIRELESS
M/S PO BOX 2375
SPOKANE, WA 99210-2375
MARK CLEMENS (206) 775-5105
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.105087408FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
GAS
PHONE
CABLE TV
505329193 104299418
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Perm. Service
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:VAL BUZUNOV
(425) 457-9938
VAL.BUZUNOV@PSE.COM
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
SCALE: 1" = 50'
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
VAL BUZUNOV (425) 457-9938 12/29/17
VAL BUZUNOV (425) 457-9938 12/29/17
N. PETTIE (714) 893-2405 12/29/17
REQUIRED RENTON
VERIZON SEA RELIABLE
1Ø PRI L/E
4201 LIND AVE SW, RENTON, WA 98055
N/A N/A
N/A 105087408
AS NOTED 1 OF 1
KING N/A N/A QCSOKE
30SW-T23R-05E N/A N/A
2305E119 2305E124 2305E119 VIC-17
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
105087408500771819
CUSTOMER & DEVELOPER NOTES
THE CUSTOMER IS RESPONSIBLE TO PROVIDE ALL TRENCHING, SELECT BACKFILL, COMPACTION &
RESTORATION PER PUGET SOUND ENERGY STANDARDS 6750.6500
-REQUIRED TO PROVIDE 6' X 6' WORK PIT & &8%,&<$5'62)´&586+('52&. AT V01
5(48,5('723529,'(¶;¶:25.3,7$7J01
-REQUIRED TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL
-REQUIRED TO PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS & TRENCH AT ALL TIMES
-REQUIRED TO EXCAVATE & EXPOSE EXISTING PSE UG FACILITIES 48 HOURS PRIOR TO CONSTRUCTION
-PSE INSPECTION IS REQUIRED PRIOR TO FINAL BACKFILL
-PSE WILL NOT ENERGIZE FACILITIES UNTIL BACKFILL IS COMPLETE
-RENTON INSPECTION & APPROVAL IS REQUIRED 5 BUSINESS DAYS PRIOR TO CONNECTION
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch
must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working
days in advance.
3.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the
underground facilities located.
4.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch
and details for locations. Equipment locations must be approved by the Project Manager.
5.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which
would restrict construction and/or equipment access, before work can begin.
6.Roads shall be paved or have a compacted , crushed rock base in place.
7.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls,
overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE
standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in
the right of way, and at least 1 foot when crossing them.
8.All work is to be done in accordance with local municipal and county permit requirements as applicable.
9.Inclement weather conditions may cause delays in construction times and dates.
10.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this
sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and
24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope
the trench to 1:1.
POWER GENERAL NOTES - COMMERCIAL PROJECT
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
VIC-17
06/2017
236.00 242.00 233.00
0.00 0.00 0.88
236.00 242.00 233.88
OVERHEAD CIRCUIT MAP 2305E124
SCALE: 6" = 1 MILE
NEW CABLE & CONDUIT DIAGRAM
NOT TO SCALE
JOB SITE
JOB SITE
ASPLUNDH CONSTRUCTION CORP.
CIRCUIT FEET ADDED: 20'
SQ. FOOTAGE: N/A
PANEL SIZE: 200A
HEAT TYPE: ELECTRIC
EST. DEMAND: 9.6kW
LRC: 65A
% V. DROP: 0.8%
% FLICKER: 1.5%
UNDERGROUND CIRCUIT MAP
SCALE: 1" = 50'
SITE SPECIFIC NOTES
AT J01: 316704-165601
-EXISTING J-BOX TO REMAIN
-INSTALL (1) L/B ELBOW (ELB10J) PER STD 6045.1010
AT V01: 316699-165585
-INSTALL 36" x 42" MP HH & GRNDS (MINU1SR) PER STD 6045.1010
,167$//N9$Y3$'0281775)0,'
-INSTALL (1) L/B ELBOW (ELB10J) PER STD 6041.1000
-CONNECT 1 RUN OF CUSTOMER OWNED 3/0 UG TPX
-INSTALL GRID #316699-165585
SPAN SPECIFIC NOTES
J01 TO V01:
,167$//'%',6&217,1828639&&21'8,7
,167$//5818*35,&$%/(
Installed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER INSTALLATION
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
V01
316699-165585
25kVA
6247000
COOLING
5' MIN
5' MIN
10' MIN
5'
MIN
FINS
ACCESS
CONCRETE PAD
MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
CURB OR EDGE OF PAVEMENT
CURB OR EDGE OF PAVEMENT
5' MIN
ROAD OR
PARKING AREA
TYP. PAD
& TRANS-
FORMER
3'
MIN
3' MIN
3' MIN
DOOR
ACCESS
DOOR
REQUIRED
WORK SPACE
AREA
VAULT & EXCAVATION DETAIL @ V01
Not to scale
PRIMARY CABLE & CONDUIT TABLE
LOCATION CONDUIT CABLE ASBUILT INFORMATION - FOREMAN COMPLETE
FROM TO SIZE
(IN)QTY.
DESIGN
LENGTH
(FT)
BENDS PULL
(LBS)
PULL
REV
(LBS)
CABLE
SIZE
DESIGN
LENGTH
(FT)
PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED
90°45°22°11°A B C MANUFACTURER COMPOUND YEAR NOTES CONDUIT CABLE
J01 V01 2 1 20'48 44 1/0AL JKT 40'CØ_-
2" PVC (FT) & BENDS =0 0 0 0 1/0 AL JKT TOTAL (FT) =40'
NEW 25kVA 120/240v
TOP VIEW
SIDE
VIEW
EXCAVATION:
4-2/3 CUBIC YARDS
Rock
Crushed
6"
3'-6"
2"
6'
6'
48"42"
36"
38"
42"
Struts
FRONT
FRONTCommunications
Primary Power
Cables or Conduit
Excavated Dirt Pile
ROADSIDE
Final Grade
24" Min
12" Min
Separation36"MinCover48"MaxBackfill(No rocks over 10" diameter)Separation
12" Min
Gas
4" Sand Bedding
32" Typical
(Power, Gas, and
Communications)
JOINT TRENCH DETAIL
Primary-Mainline Gas & Communications (NTS)
Separation
12" Min
6" or 12" Min Sand Shading after Compaction
- A 6" layer of sand is allowed when excavated native material contains rocks no larger than 8" in diameter.
Trench and backfill requirements for primary electric line extension trenches (No PSE gas)
- A 12" layer of sand is required when excavated native material contains rocks up to 10" in diameter.
1253810010
PARCEL #MFP18001623